Loading...
Mystique Ice Arena: Rubber Sport Flooring Removal and New Replacement Project - Acceptance of Equipment, Goods, and Services ContractCity of Dubuque City Council Meeting Consent Items # 07. Copyrighted January 3, 2023 ITEM TITLE: Mystique Ice Arena: Rubber Sport Flooring Removal and New Replacement Project -Acceptance of Equipment, Goods, and Services Contract SUMMARY: City Manager recommending City Council adopt a resolution accepting the Equipment, Goods, and Services Contract and authorize the final payment of the contract amount of $289,480.95 to Becker Arena Products, Inc. for the Mystique Ice Arena Rubber Sport Flooring Removal and New Replacement Project. RESOLUTION Accepting the Mystique Ice Arena Rubber Sport Flooring Removal and New Replacement Project and authorizing the payment to the vendor / service provider SUGGESTED Suggested Disposition: Receive and File; Adopt Resolution(s) DISPOSITION: ATTACHMENTS: Description Type Acceptance Mystique Ice Center Arena Sport Flooring City Manager Memo Project-MVM Memo Staff Memo Staff Memo Resolution Resolutions Engineer's Certificate of Completion Supporting Documentation Becker Rubber Flooring As -Built Supporting Documentation THE CITY DUOF B TEE Masterpiece on the Mississippi TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: Mystique Ice Arena Rubber Sport Flooring Removal and New Replacement Project Acceptance of Equipment, Goods, and Services Contract DATE: December 19, 2022 Dubuque All -America City IN 2007.2012.2013 2017*2019 Assistant City Engineer Robert Schiesl is recommending City Council adopt a resolution accepting the Equipment, Goods, and Services Contract and authorize the final payment of the contract amount of $289,480.95 to Becker Arena Products, Inc. for the Mystique Ice Arena Rubber Sport Flooring Removal and New Replacement Project. I concur with the recommendation and respectfully request Mayor and City Council approval. Mic ael C. Van Milligen L [yTI L WA Attachment cc: Crenna Brumwell, City Attorney Cori Burbach, Assistant City Manager Gus Psihoyos, City Engineer Robert Schiesl, Assistant City Engineer Marie Ware, Leisure Services Manager THE C DUj!B9kFE Masterpiece on the Mississippi TO: Michael C. Van Milligen, City Manager Gus Psihoyos, City Engineer FROM: Robert Schiesl, Assistant City Engineer SUBJECT: Mystique Ice Arena Rubber Sport Flooring Removal and New Replacement Project Acceptance of Equipment, Goods, and Services Contract DATE: December 20, 2022 INTRODUCTION Dubuque AII•Amarica City 2007-2012.2013 2017*2019 The attached resolution provides for the acceptance of the Equipment, Goods, and Services Contract for the Mystique Ice Arena Rubber Sport Flooring Removal and New Replacement Project. BACKGROUND The mitigation work for the ice arena settlement remediation has been successfully completed. The first phase of work began on June 1st with the removal of the rink dasher boards, the rink ice system, and bleachers to allow for the installation of a non-destructive deep foundation system under the rink area and throughout the lower -level main floor interior finished building space. Once the settlement and foundation system were completed, a concrete subfloor was installed and supported on the deep foundation system. Once the concrete subfloor was in -place, a new refrigerated ice rink concrete floor was installed which is now supported by the subfloor slab and foundation. Once the refrigerated ice rink floor was operational, the arena bleachers and seating were reinstalled along with installation of new dasher boards, and the installation of new rubber sport flooring on the lower -level main floor. All this work was successfully completed, and the Dubuque Ice Arena was reopened to the public on November 1, 2022. The settlement remediation work included the construction of 473 deep compaction grout columns on an approximate 10-ft. by 10-ft. grid throughout the arena lower main floor level. The remediation work required drilling approximately 200 4-inch diameter holes through the existing rubber floor coverings and the underlying concrete floor slab throughout the hallways, locker rooms, restrooms, office and concession areas, and front lobby entry areas. Due to the number of holes placed throughout the floor, the damage to the existing rubber flooring from construction equipment, along with debris and spillage from the concrete grout slurry placement, the settlement remediation project required the complete removal and replacement of the rubber sport flooring throughout the Mystique Community Ice Center. The Mystique Ice Arena Rubber Sport Flooring Removal and New Replacement Project provided for the installation of approximately 22,500 S.F. of new high quality resilient, durable rubber sport flooring system throughout the Mystique Community Ice Center. See attached exhibit showing the as -build layout for the rubber sport flooring installed throughout the arena lower main level. DISCUSSION The Mystique Ice Arena Rubber Sport Flooring Removal and New Replacement Project was completed by Becker Arena Products, Inc., of Shakopee, Minnesota in the final contract amount of $289,480.95. This is a 0.2% increase over the original contract amount of $288,946.00. The increase ($534.95) was due to an additional 4 rubber black and red fleck mats that were provided for extra / spare flooring surplus. RECOMMENDATION I recommend that the City Council accept the improvements and authorize the payment of the final contract amount of $289,480.95 to Becker Arena Products, Inc. for the Mystique Ice Arena Rubber Sport Flooring Removal and New Replacement Project. BUDGETIMPACT The summary of project costs for the Mystique Ice Arena Rubber Sport Flooring Removal and New Replacement Project is summarized in the following table: Description Award Final Construction — Rubber Sport Flooring $ 288,946.00 $ 289,480.95 Total Construction Cost $ 288,946.00 $ 289,480.95 The project funding is summarized as follows: Project Code Fund Description Fund Amount 3449900001-67990 Ice Center Settling Remediation (FY23) $ 289,480.95 Total Project Funding $ 289,480.95 REQUESTED ACTION The City Council is requested to adopt the attached resolution accepting the Equipment, Goods, and Services Contract and authorize the final payment of the contract amount of $289,480.95 to Becker Arena Products, Inc. for the Mystique Ice Arena Rubber Sport Flooring Removal and New Replacement Project. CC' Jenny Larson, Director of Finance and Budget Marie Ware, Leisure Services Manager F:\PROJECTS\Mystique Community Ice Center\2022 Settlement Remediation Project\Arena Sport Floor Remove Replace Project\Council & Staff Documents\Acceptance 2 Prepared by' Bob Schiesl City of Dubuque Engineering 50 W 13" Street Dubuque IA 52001 (563)589 4270 Return to: Adreinne N. Breitbelder, City Clerk, 50W 13" Street, Dubuque, IA 52001 (563)589-4100 RESOLUTION NO. 2-23 ACCEPTING THE MYSTIQUE ICE ARENA RUBBER SPORT FLOORING REMOVAL AND NEW REPLACEMENT PROJECT AND AUTHORIZING THE PAYMENT TO THE VENDOR / SERVICE PROVIDER WHEREAS, the Equipment, Goods, and Services Contract for the Mystique Ice Arena Rubber Sport Flooring Removal and New Replacement Project (the Project) has been completed by Becker Arena Products, Inc., (Vendor / Service Provider), and the City Engineer has examined the work and recommends that the Project be accepted; and WHEREAS, the final contract amount for the Project is $289,480.95; and WHEREAS, Becker Arena Products, Inc. has previously been paid $275,006.90, leaving a balance of $14,474.05; and WHEREAS, the City Council finds that the recommendation of the City Engineer should be accepted. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: SECTION 1. The recommendation of the City Engineer is approved, and the Project is hereby accepted. SECTION 2. The Finance Director is hereby directed to pay to Becker Arena Products, Inc. the balance of the retainage of $14,474.05 as provided in Iowa Code chapter 573, and to pay such retainage in accordance with the provisions of Iowa Code chapter 573 or Iowa Code chapter 26.13. Passed, approved, and adopted this 3rd day of January 2023. Attest: Adrienne N. Breitfelder, CMC, City Clerk Brad M. egugh, I�ayor CITY ENGINEER'S CERTIFICATE OF FINAL COMPLETION OF THE MYSTIQUE ICE ARENA RUBBER SPORT FLOORING REMOVAL AND NEW REPLACEMENT PROJECT The undersigned City Engineer of the City of Dubuque, Iowa, hereby certifies that he has inspected the Mystique Ice Arena Rubber Sport Flooring Removal and New Replacement Project has been performed in compliance with the terms of the Equipment, Goods, and Services Contract, and that the total cost of the completed work is $289,480.95. Dated this 19t" day of December 2022. Gus Psihoyos, City Engineer Filed in the office of the City Clerk on the 19t" day of December 2022. Adrienne N. Breitfelder, City Clerk PROPOSED FLOORING LEGEND ®0f®fit®RUBBER RUBBER STAMINA BLACK - . 3 - STAMINA BLACK & RED FLECK LOBBYRUBBER •RA 5303 FRANKINCENSE ADDITIONAL FLOORING LEGEND APPROXIMATE QUANTITIES (AREAS TORECEIVE NEW FLOORING ASPART OFNEW FLOORING APPROXIMATE QUANTITIES 11,685 SF 0 ICE RESURFACER MAT 425 SF 6,245 SF U—V /\ V—V V/'YI\rL I ru\Lr% VVI1I I Li UU I.a(VL I IVI I I IIVV -.)rxl1V 11-7 LL/V LJ whize engineers + planners + land surveyors 1421 S. Bell Ave., Ste 103 Ames, IA 50010 Phone: (515) 663-9997 www.whks.com Dubuque THE CD!Uj-B F All -America City E I I® Masterpiece on the Mississippi 2007*2012*2013 2017*2019 x w CD z W w O V O O J LL H O a. Cn H z W r W � J U ~ W H W to O wa F_z z0 w— t� ~ Q wa — c� —w w5 =)w CY F_ Cn Mystique Community Ice Center 1800 Admiral Sheehey Dr. Dubuque, IA 52001 MYSTIQUE ICE CENTER SETTLEMENT REMEDIATION PROJECT Project number: 9155.01 Date: 12/20/2022 Drawn by: DK Checked by: