2023 Asphalt Overlay Curb Ramp Project 1City of Dubuque City Council Meeting Consent Items # 016. Copyrighted February 6, 2023 ITEM TITLE: 2023 Asphalt Overlay Curb Ramp Project 1 SUMMARY: City Manager recommending that the award for the 2023 Asphalt Overlay Curb Ramp Project 1 be officially recorded in the minutes of the City Council. SUGGESTED Suggested Disposition: Receive and File; Make Matter of Record DISPOSITION: ATTACHMENTS: Description MVM Memo Staff Memo Type City Manager Memo Staff Memo THE C DUj!BQTE Masterpiece on the Mississippi TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: 2023 Asphalt Overlay Curb Ramp Project 1 DATE: February 1, 2023 Dubuque WAWca 914 ii 2007-2012.2013 2017*2019 City Engineer Gus Psihoyos recommends that the award for the 2023 Asphalt Overlay Curb Ramp Project 1 be officially recorded in the minutes of the City Council. Through the competitive quotation process for public improvements, this project was awarded on January 12, 2023, to BCD Contractors of Dubuque, Iowa, in the low bid amount of $138,911.70. The engineer's estimate for the project is $138,935.77, this bid is 0.02% under the Engineer's estimate. Mic ael C. Van Milligen MCVM:sv Attachment cc: Crenna Brumwell, City Attorney Cori Burbach, Assistant City Manager Gus Psihoyos, City Engineer THE CITY OF DUB E Masterpiece on the Mississippi TO: Michael C. Van Milligen, City Manager FROM: Gus Psihoyos, City Engineer DATE: January 23, 2023 RE: 2023 Asphalt Overlay Curb Ramp Project 1 Dubuque All•Merin City 2007-2012.2013 2017*2019 The 2023 Asphalt Overlay Curb Ramp Project 1 will provide for the replacement of thirty- four access ramps at thirteen intersections in conjunction with the Public Works asphalt overlay program in following locations: Kane Street at Balboa Drive, two single directional ramps. Kane Street at Mesa Drive, two single directional ramps. Kane Street at Ken Court, two single directional ramps. Kane Street at Scenic View Drive, two single directional ramps. Kane Street at Miracle League Drive, two single directional ramps. Kane Street at Tina Ridge Drive, two single directional ramps. Kane Street at Maryville Drive, one single non -directional ramp. Kane Street at Chaney Road, two single and one double directional ramp. Kane Street at Shetland Court, two single directional ramps. Kane Street at Carter Road, one single and one double directional ramp. Chaney Road at Renaissance Drive, two single directional ramps. Carter Road at Kaufmann Avenue, four double directional ramps. Carter Road at Karen Street, two single directional ramps. The following is a summary of bids received for the 2023 Asphalt Overlay Curb Ramp Project 1: Contractor Base Bid BCD Contractors $138,911.70 Midwest Concrete $149,080.50 The engineer's estimate for the project is $138,935.77, this is 0.02% under the Engineer's estimate. Through the competitive quotation process for public improvements, this project was awarded on January 12, 2023, to BCD Contractors of Dubuque, Iowa, in the low bid amount of $138,911.70. The funding is as follows: Project Fund Description Fund Amount 5421000002 Curb Ramp Program $ 138,911.70 In accordance with the competitive quotation requirements of Iowa Code, Section 26.14, it is necessary that the award for the 2023 Asphalt Overlay Curb Ramp Project 1 be officially recorded in the minutes of the City Council. Prepared By: Kerry Bradley, Eng. Dept. cc: Jon Dienst, Civil Engineer II Luke Steger, Engineering Tech 2