Water Department Fiscal Year 2024 Budget PresentationCopyrighted
March 21, 2023
City of Dubuque
Special Meeting P UBLIC HE ARINGS # 02.
IT E M T I T L E:Water Department Fiscal Year 2024 B udget Presentation
S UM M ARY:
S UG G E S T E D
D I S P O S I T I O N:
AT TAC H ME N TS:
Description Type
Policy Budget Book Updated Supporting Documentation
Presentation_Uploaded 3.21.23 Supporting Documentation
Utilities and A C P Program Flyer Supporting Documentation
Water Department
-19-
This page intentionally left blank.
-20-
WATER DEPARTMENT
Budget Highlights
FY 2022
Actual
FY 2023
Budget
FY 2024
Requested % Change From
FY 2023 Budget
Expenses
Employee Expense 2,324,025 2,514,330 2,700,384 7.4 %
Supplies and Services 2,872,120 2,696,808 3,548,883 31.6 %
Machinery and Equipment 580,873 966,118 788,130 (18.4) %
Administrative Overhead Recharges 435,271 452,767 1,369,331 202.4 %
Engineering Water Maintenance Charges 40,002 42,951 50,182 16.8 %
Payment in Lieu of Taxes 142,884 142,884 142,884 — %
Payment to Construction Fund 400,000 1,000,000 1,000,000 — %
Debt Service 7,439,736 2,692,470 2,689,548 (0.1) %
Total Expenses 14,234,911 10,508,328 12,289,342 16.9 %
Resources
Operating Revenue 15,461,447 11,630,469 12,336,834 6.1 %
General Fund - Rate Subsidy 22,352 25,000 25,000 — %
Total Resources 15,483,799 11,655,469 12,361,834 6.1 %
Net Operating Surplus (Deficit) 1,248,888 1,147,141 72,492 -1,074,649
Personnel - Authorized FTE 26.07 26.07 27.07
Water User Fee Rate Increase 3 % 5 % 8 %
Revenue 1% Rate Increase Generates $ 94,642
Improvement Package Summary
1 of 5
This improvement package request is for the elimination of the Water Engineering Assistant position (-1.0
FTE, GE-33) and the creation of a Water Project Manager (1.0 FTE, GE-38). The needs of the department
continue to grow and change in regard to the depth and breadth of knowledge, and as a result, the
experience required includes: the development of the capital improvement program; knowledge of onsite
construction management; working with consulting engineers; coordination with the City of Dubuque
Engineering, Planning, Building, and Public Works departments; writing requests for proposals; updating
standards and specifications; providing engineered solutions; reviewing designs for compliance with
engineering principles, city standards, department requirements and local, state and federal regulations. The
current position identified as the Water Engineering Assistant is not currently staffed to be able to perform at
the Project Manager level that is necessary to meet the demands of the department. The request is that
the Water Engineering Assistant position be eliminated in order to create this enhanced Water Project
Manager position.
This request follows the City Council Goal and Priority of Financially Responsible, High Performance City
Organization: Hire, retain a highly skilled City workforce reflective of the Dubuque Community and Robust
Local Economy: Have the infrastructure and amenities to support economic development and growth:
industrial/business parks, streets and utilities, air service and housing, bandwidth redundancy.
-21-
Related Cost: $116,513 Water User Fees Recurring Recommend - No
Related Savings: ($80,935) Water User Fees Recurring
Net Cost: $35,578
Water Rate Impact: 0.42 %
Activity: Administration
2 of 5
This improvement package request is for the creation of two additional Water Distribution Maintenance
Workers (2.0 FTE, OE-09). As the distribution system continues to grow, the need for routine operation and
maintenance grows also. Since 2017, the distribution system has expanded from 326 miles of water main to
over 387 miles, 7,070 control valves to over 8,000 control valves, and 2,400 fire hydrants to over 3,500 fire
hydrants. The addition of two FTE Distribution Maintenance Worker positions would increase the current
staffing level from a six-person distribution crew and one foreman to an eight-person distribution crew
working with one foreman.
The additional staff would not only be able to perform work on the distribution system during both regular
hours but also be available for emergency calls after hours. They would also aid in replacing meters, MIUs,
registers, and better position the water department to develop and implement Iowa DNR-recommended
programs (such as annual unidirectional water main flushing to ensure high quality drinking water and
maintain the city’s ISO rating) and a valve turning program as recommended by the Iowa DNR. This
additional work would account for over 3,000 hours per year. This work is also directly associated with the
capital improvement project, "Valve Exercising and Condition Assessment Program." The additional staff
would also be made available for more in-house inspection of new main installation and repairs, thereby
reducing costs associated with increased outsourced construction inspectors.
This request follows the City Council Goal and Priority of Financially Responsible, High Performance City
Organization: Hire, retain a highly skilled City workforce reflective of the Dubuque Community and Robust
Local Economy: Have the infrastructure and amenities to support economic development and growth:
industrial/business parks, streets and utilities, air service and housing, bandwidth redundancy.
The Water Department requested $161,862 for two positions, and the recommendation is $80,931 for one
position.
Related Cost: $79,201 Water User Fees Recurring Recommend - Yes
Related Cost: $1,730 Water User Fees Non-Recurring
Net Cost: $80,931
Water Rate Impact: 0.86 %
Activity: Distribution System
3 of 5
This improvement packet would provide for the elimination of a Water Meter Repair Worker II (-1.0 FTE,
OE-14) and the addition of a Water Meter Foreman (1.0 FTE, GE-31). The meter program presents daily
opportunities and challenges that require in-depth problem solving and data analysis beyond the job duties
as described in the Water Meter Repair Worker II job description. The current Water Meter Repair Worker II
employee is currently performing supervisory duties that are typical of a foreman, such as oversight of day-
to-day operations, but he is also providing necessary direction, motivation, technical guidance, project
management, and budgetary preparation to assist and support the Department Manager and the Distribution
Supervisor. The creation of a Water Meter Foreman in the department would not require an increase in
-22-
FTEs. The request is that the Water Meter Repair Worker II position be eliminated to create this enhanced
position.
This request follows the City Council Goal and Priority of Financially Responsible, High Performance City
Organization: Hire, retain a highly skilled City workforce reflective of the Dubuque Community and Robust
Local Economy: Have the infrastructure and amenities to support economic development and growth:
industrial/business parks, streets and utilities, air service and housing, bandwidth redundancy.
Related Cost: $87,125 Water User Fees Recurring Recommend - Yes
Related Savings: ($78,444) Water User Fees Recurring
Net Cost: $8,681
Water Rate Impact: 0.10 %
Activity: Meters
4 of 5
This improvement request is for funding to upgrade the ruggedized cell phone to a smartphone for the Water
Treatment Operator. A smartphone would enable the Operator to have access to WebQA and GIS mapping
during the response to an emergency, improving the time it takes to inform distribution crews. The City
operations would be improved with decreased response times to emergency sites, and the community
would benefit from a shortened interruption of water service in the event of a water main break. In addition
to helping to reduce downtime, the phone will allow the operations staff to have access to the Panic Button
App for safety in the Eagle Point Water Treatment Plant. This request follows the City Council Goal and
Priority of Sustainable Environment: Preserving and enhancing Natural Resources to readily respond to
provide safe, dependable drinking water and using affordable technology for water activities.
Related Cost: $686 Water User Fees Non-Recurring Recommend - Yes
Related Savings: ($100) Water User Fees Non-Recurring
Net Cost: $586
Water Rate Impact: 0.01 %
Activity: Plant Operations & Maintenance
5 of 5
This improvement package request is for a stand-alone SureCall Cellular Distributed Antenna System (DAS)
for the Water Department Staff at the City of Dubuque Eagle Point Water Treatment Plant. This system
would boost the cellular signal for the areas in the Eagle Point Water Treatment Plant where cellular signal
cannot be obtained. The SureCall Cellular Distributed Antenna System consists of one signal amplifier, one
rooftop-mounted antenna, and up to two interior antennas that will be mounted in the affected areas. Use
and benefit of the SureCall Cellular Distributed Antenna System would improve efficiency in daily operations
such as: making/receiving calls from Distribution crews; receiving notifications such as two-factor
identification; effective use of the Panic Button app; increased safety in case of emergencies as the Eagle
Point Water Treatment Plant is staffed by one person after 5 pm on weekdays and throughout the weekend.
This improvement package follows the City Council Goals and Priorities: Financially Responsible, High-
Performance City Organization: Sustainable, Equitable, and Effective Service Delivery.
-23-
Related Cost: $68,770 Water User Fees Non-Recurring Recommend - No
Net Cost: $68,770
Water Rate Impact: 0.82 %
Activity: Plant Operations & Maintenance
Significant Line Items
Employee Expense
1.FY 2024 employee expense reflects a 5.00% wage package increase.
2.The Iowa Public Employee Retirement System (IPERS) City contribution of 9.44% is unchanged
from FY 2023. The employee contribution of 6.29% is unchanged from FY 2023.
3.The City portion of health insurance expense is unchanged from $1,119 in FY 2023 to $1,119 in FY
2024 per month, per contract, which results in an annual cost unchanged of $13,832 or —%.
4.Overtime is unchanged from $94,040 in FY 2023 to $94,040 in FY 2024 . FY 2022 actual was
$129,894.
5.Five-Year Retiree Sick leave payout is unchanged from $11,094 in FY 2023 to $11,094 in FY 2024.
6.50% Sick Leave Payout increased from $1,841 in FY 2023 to $3,585 in FY 2024 based on FY 2023
actual to-date. Effective July 1, 2019, employees over the sick leave cap can convert 50% of the sick
leave over the cap to vacation or be paid out.
Supplies & Services
7.Electricity increased from $668,402 in FY 2023 to $969,299 in FY 2024 based on FY 2022 actual of
$768,106 plus 26%.
8.Sales Tax Expense increased from $460,710 in FY 2023 to $545,649 in FY 2024 based on FY 2022
actual plus an increase in water rates in FY 2024 of 8%. This expense is directly offset by sales tax
revenue.
9.Chemicals increased from $484,700 in FY 2023 to $622,500 in FY 2024. Chlorine increased from
$40,675 in FY 2023 to $90,000 in FY 2024. Lime increased from $335,000 in FY 2023 to $400,000 in
FY 2024. Carbon dioxide increased from $24,500 in FY 2023 to $30,000 in FY 2024. Flouride
increased from $11,000 in FY 2023 to $15,000 in FY 2024. Phosphate increased from $64,150 in FY
2023 to $75,000 in FY 2024. Polymer increased from $9,375 to $12,500 in FY 2024.
10.Hauling Contract increased from $165,000 in FY 2023 to $330,000 in FY 2024 based on FY 2023
actual price per ton.The amount of hauled tons of lime sludge is highly variable from year to year and
is based on hauling approximately 27,000 tons per year. FY 2022 actual expense was $267,552.
11.Other Professional Services increased from $108,600 in FY 2023 to $145,200 in FY 2024. This line
item includes a leak survey ($18,000) and water storage tank inspections ($15,000).
12.Technology Services increased from $97,254 in FY 2023 to $104,832 in FY 2024. This line item
includes the following:
-24-
Software FY 2024
Water Administration
Laserfiche License 282
iPad Internet Service 720
Water Meters
Tokay Software 10,000
WaterSmart 32,000
Neptune360 (50%)24,000
Water Plant Operations
Scada Tech Support For Rockwell Software 4,900
Hach Wims And Access Technologies 31,000
Water Distribution
AutoCAD 1,930
Total Software $104,832
13.Valves/Fittings increased from $125,472 in FY 2023 to $142,266 in FY 2024 based on FY 2022
actual. This line item represents the purchase of water pipe, special fitting and tapping material for
the distribution system. There is associated revenue budgeted in taps ($33,147) and taps services
($9,246) that covers these expenses. This line item represents the material cost only for valves in the
distribution system and ongoing valve replacement and maintenance internally in the plant.
-25-
Machinery & Equipment
1.Equipment replacement items at the maintenance level include ($788,130):
Water Machinery and Equipment
Water Administration
Smart Phone (1)$ 350
Meters
Smart Phone (2)$ 450
Plant Operation & Maintenance
Smart Phone (2)$ 800
Front Entryway Chairs $ 1,500
Water Distribution System
Double Axle Trailer $ 23,000
Hydrants $ 70,000
Electric Pump (2)$ 1,500
Cut Off Saw $ 1,800
Hydraulic Pump $ 3,000
Tapping Machine $ 6,500
R2 GPS $ 8,000
Smartphones (3)$ 1,750
Annual Maintenance Projects
Pump Replace Vacuum Filter $ 15,000
Backup Pump Vacuum Filter $ 15,000
Annual Maintenance Programs $ 638,000
Recommended Improvement Packages $ 1,480
Total Equipment $ 788,130
Debt Service
2.Annual debt service reflects repayment to ($2,689,548):
Amount Debt Series Source Purpose
Final
Payment
Call
Date
$ 58,700 SRF 2007A Water Fees Clear Wells 2028
$ 218,238 SRF Series 2009 Water Fees Meter Change-Out 2031
$ 426,100 Revenue 2021C Water Fees Water Improvements 2030 2028
$ 107,104 G.O. 2018A Water Fees Water Improvements 2031 2026
$ 37,480 G.O. 2021A Water Fees Water Improvements 2032 2028
$ 140,763 G.O. 2021A Water Fees Water Improvements 2033 2026
$ 653,800 G.O. 20121A Water Fees Water Improvements 2032 2028
$ 42,288 G.O. 2016C Water Fees Water Improvements 2033 2024
$ 674,180 SRF 2017 Water Fees CIWA Purchase/Imp 2036
$ 268,920 SRF 2019 Water Fees Roosevelt Water Tower 2038
$ 61,975 SRF 2021 Water Fees Water Improvements 2041
$ 2,689,548 Total Water Annual Debt Service
-26-
Revenue
1.Water User Fees increased from $10,195,050 in FY 2023 to $10,996,706 in FY 2024 based on FY
2022 actual of $9,464,186 plus the FY 2024 projected rate increase of 8% from FY 2023 budget.
2.Flat Rates increased from $54,958 in FY 2023 to $57,706 in FY 2024. FY 2022 actual was $41,714.
This charge is for customers purchasing bulk water. Rates are set by City ordinance.
3.Fire Protection Rates increased from $186,975 in FY 2023 to $196,324 in FY 2024 based on FY
2022 actual of $191,821. This fee is the demand charge for fire sprinkler head connection. The rates
are set by City ordinance.
4.Taps decreased from $65,000 in FY 2023 to $33,147 in FY 2024. FY 2022 actual was $63,850. This
fee is charged to customers for 3/4" to 1" taps and represents the cost of labor and materials. The
rates are set by City ordinance, and the projections are calculated by the Engineering Assistant.
5.Tap Service decreased from $20,000 in FY 2023 to $9,246 in FY 2024. FY 2022 actual was $15,340.
This fee is charged to customers for 2" taps and represents the actual cost of labor and materials.
The rates are set by City ordinance, and the projections are calculated by the Engineering Assistant.
6.Connection Charge Front Footage is decreased from $103,000 in FY 2023 to $77,788 in FY 2024
based on FY 2022 actual. FY 2022 actual was $63,417. This fee is charged to a new user when a
connection is made to the City water supply. This represents the user share of the cost of the
installation of the water main. Rates are set by City ordinance.
7.Backflow Prevention Administrative Fees decreased from $76,150 in FY 2023 to $75,832 in FY 2024
based on actual number of accounts. FY 2022 actual was $75,832. This is the $25 annual fee
charged to all customers with a backflow device.
8.Penalties for late payments decreased from $95,748 in FY 2023 to $45,980 in FY 2024 based on FY
2022 actual of $45,980.
9.Tower Monthly Rental increased from $132,331 in FY 2023 to $145,557 in FY 2024 based on water
lease contract amounts. FY 2022 actual was $144,393.
10.Sales Tax Collected increased from $499,458 in FY 2023 to $545,649 in FY 2024 based on the rate
increase for water fees. This line item off-sets the sales tax expense.
-27-
-28-
WATER DEPARTMENT
The Water Department ensures our community has high quality, safe, reliable and affordable drinking
water.
SUCCESS IS ABOUT PLANNING, PARTNERSHIPS AND PEOPLE
LEADING TO OUTCOMES
-29-
WATER DEPARTMENT
FY 2022 FY 2023 FY 2024
Full-Time Equivalent 26.07 26.07 27.07
Resources Support
$15,461,447
$11,630,469 $12,336,834
FY 2022 FY 2023 FY 2024
Operating Revenue
$0
$5,000,000
$10,000,000
$15,000,000
$20,000,000
The Water Department is supported by 27.07 full-time equivalent employees, which accounts for
21.97% of the department expense as seen below. Overall, the department's expenses are expected to
increase by 16.95% in FY 2024 compared to FY 2023.
Expenditures by Category by Fiscal Year
FY 2022 FY 2023 FY 2024Employee ExpenseSupplies and ServicesEquipmentAdmin OverheadUtility BillingPILOTConstruction FundDebt ServiceEngineering Charges$0
$2,500,000
$5,000,000
$7,500,000
$10,000,000
-30-
WATER DEPARTMENT
Administration
Mission & Services
The City of Dubuque Water Department is dedicated to producing and delivering drinking water that is
in compliance with all state and federal drinking water standards. We continually strive to adopt new
and better methods of delivering the best quality drinking water to the citizens of Dubuque in the most
cost-effective manner. Water Department Administration is responsible for the preparation of operating
and capital budgets, interacting with the state and federal regulatory agencies, evaluation and
coordination of treatment facility operations and the water distribution system functions.
Water Administration Funding Summary
64042100 FY 2022 Actual FY 2023 Budget FY 2024 Recomm'd
Expenditures $9,570,599 $5,296,426 $6,518,617
Resources $3,686,304 $—$—
Water Administration Position Summary
FY 2024
Water Department Manager 1.00
Water Distribution Supervisor 1.00
Water Engineering Assistant 1.00
Confidential Account Clerk 1.00
GIS Specialist 1.00
GIS Intern 0.50
Total FT Equivalent Employees 5.50
Performance Measures
City Council Goal: Financially Responsible, High-Performance Organization
Performance Measure (KPI)Target FY 2021
Actual
FY 2022
Actual
FY 2023
Estimated
Performance
Indicator
1 Activity Objective: Maintain a financially-viable water utility.
# of hours that staff are completing annual
training (hrs) to support CEUs and
professional development in emergency
response
20 35 35 35
Reduction of Water Quality Issues per
100 miles of Pipe <20 21 15 15
% of lost/unaccounted for water <18%16.5%17.9%18%
% of projects completed within the
program budget 100%100%100%100%
Operating cost coverage for water (Total
operational Revenue/Total Operating
Cost)
1.0 1.04 1.3 1.0
-31-
WATER DEPARTMENT
Plant Operations and Maintenance
Overview
Plant Operations and Maintenance ensures that water used
for domestic, commercial and industrial purposes is high
quality and is supplied to meet the needs our community. We
are responsible for the management of equipment and
treatment process of the City's drinking water in compliance
with all federal and state water quality standards.
Over 200 tests per day are performed by water treatment
plant operators. In addition to these tests, the Dubuque
W&RRC Laboratory performs over 60 bacteriological analysis
of the drinking water on a monthly basis. Other compliance-
related testing is performed by the University of Iowa Hygienic
Laboratory. All of these analytical measures ensure the water
reaching homes is of drinking-water quality.
Plant Operations and Maintenance Funding Summary
64042400 FY 2022 Actual FY 2023 Budget FY 2024 Recomm'd
Expenditures $2,655,906 $2,646,400 $3,185,155
Resources $57 $1,400 $72
Plant Operations and Maintenance Position Summary
FY 2024
Industrial Electronic Technician 1.00
Equipment Mechanic 1.00
Plant Operator I 1.00
Plant Operator II 1.00
Plant Operator III & IV 1.00
Plant Operator IV 3.00
Total FT Equivalent Employees 8.00
Performance Measures
City Council Goal: Sustainable Environment
Performance Measure (KPI)Target FY 2021
Actual
FY 2022
Actual
FY 2023
Estimated
Performance
Indicator
1 Activity Objective: Provide water treatment and distribute high-quality, clean drinking water that
meets or exceeds drinking water regulations.
# of Regulatory Compliance as No
Violations 0 0 0 0
Water Plant Process Efficiency measured
as Water Treated vs Produced(MGD
Treated/MGD Produced)
1.1 .94 .97 1.0
Cost Effectiveness of the Treatment
Process (O&M Cost/MG, thousands)<or= 1.0 0.94 1.0 1.0
The 2022 Water Quality Report can be downloaded at: https://www.cityofdubuque.org/waterquality
-32-
WATER DEPARTMENT
Water Distribution
Mission & Services
The function of the Water Distribution Team is to safely transport potable water from the source to point
of use. Distribution is also responsible for the machinery, equipment, materials and personnel required
to repair main breaks; install water mains, control valves and fire hydrants and assist other sections of
the Water Department. It is our goal to operate and maintain a water distribution system consistent with
established procedures recognized by the American Water Works Association for efficient management
practices and to meet Federal, State and local rules and regulations.
Water Distribution Funding Summary
FY 2022 Actual FY 2023 Budget FY 2024 Recomm'd
Expenditures $1,124,281 $1,357,268 $1,263,173
Resources $11,661,503 $11,483,981 $12,225,628
Water Distribution Position Summary
FY 2024
Equipment Operator II 1.00
Water Distribution Foreman 1.00
Water Distribution Maintenance Worker 6.00
Custodian I 0.07
Total FT Equivalent Employees 8.07
Performance Measures
City Council Goal: Financially Responsible, High-Performance Organization
Performance Measure (KPI)Target FY 2021
Actual
FY 2022
Actual
FY 2023
Estimated
Performance
Indicator
1 Activity Objective: Ensure the integrity of the distribution system piping system.
# of breaks per 100 miles of pipe <15 27 33 30
Operation of 10% of system valves
annually 775 314 215 300
Hydrant effectiveness (out of service rate)
<1% or 25FH <1%0%<1%<1%
O&M costs for water per 100 miles of pipe
(thousands per 100 miles)<343**311 403 350
** Based on 3year running average
The Water Department's Distribution Crew is available 24/7/365 to repair water mains and
reduce service outages, minimizing the time customers are without water.
DID YOU KNOW? The water distribution system is composed of 330.05 miles of public water mains
ranging in diameter from 4" up to 30"; 7,391 control valves; and 2,860 fire hydrants.
-33-
WATER DEPARTMENT
Water Meters & Backflow Prevention
Mission & Services
The Water Meter Team provides dependable meter operations and maintenance. The work performed
includes installation, testing, cleaning, repairing and and reassembling meters as required. The Meter
Team also addresses pressure issues, performs water use investigations and manages the Backflow
Prevention Program. The work is conducted in compliance with local, state and federal requirements.
Water Meters Funding Summary
64042300 FY 2022 Actual FY 2023 Budget FY 2024 Recomm'd
Expenditures $347,955 $383,977 $536,215
Resources $132,185 $158,071 $132,184
Water Meters Position Summary
FY 2024
Water Meter Repair Worker I 2.00
Water Distribution Maintenance Worker 1.00
Total Full-Time Equivalent Employee’s 3.00
Performance Measures
City Council Goal: Sustainable Environment
Performance Measure (KPI)Target FY 2021
Actual
FY 2022
Actual
FY 2023
Estimated
Performance
Indicator
1 Activity Objective: Minimize the possibility of contamination in the distribution through the
installation of backflow prevention devices.
High and Low Hazard Containment
Services, by definition, to participate in the
backflow prevention program
100%98%99%99%
City Council Goal: Financially Responsible, High-Performance Organization
1 Activity Objective: Respond to customer inquiries in a timely manner to maintain consumer
confidence in the water utility.
Respond to technical Meter Department
service issues.100%100%100%100%
Enhanced meter reading accuracy, larger
users: O&M on all large meters (>3") per
AWWA standards (lg meter/yr)
24/yr 10/yr*18/yr*24yr
**Numbers to include partial year of 5 year MIU replacement 450 to 900
-34-
Recommended Operating Revenue Budget - Department Total
42 - WATER
Fund/Account/Account Title
FY21 Actual
Revenue
FY22 Actual
Revenue
FY23 Adopted
Budget
FY24 Recomm'd
Budget
600 - Water Operating
4A - Charges for Services
41380 - Water/Sewer Permit (134,615) (144,393) (132,331) (145,557)
45090 - Meter Rates (8,547,478) (9,464,186) (10,195,050) (10,996,706)
45095 - Fire Protection Rates (186,975) (191,821) (186,975) (196,324)
45100 - Flat Rates (56,559) (41,714) (54,958) (57,706)
45105 - Unapplied Credits (26,124) (23,071) (26,124) (23,071)
45125 - Meter Sales - Remotes (16,304) (13,609) (16,304) (13,609)
45126 - Meters - Sales (54,239) (28,917) (54,239) (28,917)
45127 - UFR Device - Sales (3,047) (2,938) (3,047) (2,938)
45128 - Meter Repair (8,257) (10,409) (8,257) (10,409)
45234 - UB-Water Repair Grt Temp Hold 0 200 0 0
45300 - Forfeitures/Penalties (2,798) (45,980) (95,748) (45,980)
45325 - Meter Tampering Fee (394) (741) (394) (741)
45350 - Shut Off Penalties (4,178) (9,965) (4,178) (9,965)
45400 - Connect Fees (74,406) (75,832) (76,150) (75,832)
45410 - Connect Fee Large Svc (4,943) (15,340) (20,000) (9,246)
45415 - Connect Fee Front Footage (92,811) (63,417) (103,000) (77,788)
45420 - Taps (23,302) (63,850) (65,000) (33,147)
45500 - Miscellaneous Chg for Svcs (7,191) (8,978) (7,192) (8,978)
45520 - Customer Credits 0 0 0 0
47100 - Reimbursements (14,662) (4,000) (14,663) (4,000)
47150 - Refunds 0 (57) 0 0
47200 - Insurance Settlements (6,102) (13,834) (6,102) (13,466)
47450 - Sale of Salvage (2,115) (1,771) (2,115) (1,386)
4A - Charges for Services Total (9,266,501) (10,224,623) (11,071,827) (11,755,766)
4B - Grants/Contrib
44400 - State Grants — — — —
4B - Grants/Contrib Total — — — —
4K - Unrest Invest Earn
43000 - Interest (59,184) (25,600) (59,184) (35,419)
4K - Unrest Invest Earn Total (59,184) (25,600) (59,184) (35,419)
4N - Transfers
49100 - Transfer In General Fund (21,315) (22,352) (25,000) (25,000)
4N - Transfers Total (21,315) (22,352) (25,000) (25,000)
4O - Eliminated for GW
47115 - Sales Tax Collection (461,820) (494,920) (499,458) (545,649)
48200 - Proceeds from GO Debt (7,839,768) (3,505,000) — —
48205 - Bond Discount/Premium (379,068) (181,304) — —
48250 - Proceeds from SRF (2,150,000) (1,030,000) — —
4O - Eliminated for GW Total (10,830,656) (5,211,224) (499,458) (545,649)
WATER - Total (20,177,656)(15,483,799)(11,655,469)(12,361,834)
-35-
6A - Salaries & Wages
600 - Water Operating
60100 - Salaries-Regular Full Time 1,379,223 1,448,555 1,645,097 1,797,372
60200 - Salaries - Regular Part Time 9,568 16,368 29,685 31,726
60300 - Hourly Wages - Temp/Seasonal 6,710 710 16,046 16,784
60400 - Overtime 105,353 129,894 94,040 94,040
60410 - Overtime - Holiday 24,662 24,050 18,600 17,000
60630 - Special Pay Sick Lv Payout Ret 31,872 31,935 11,094 11,094
60635 - Special Pay Sick Lv Payout 50% 1,841 3,055 1,841 3,585
60640 - Special Pay - Vacation Payout 12,190 8,890 0 0
60710 - Special Pay - Parental Leave 0 0 0 0
60720 - Spec Pay - Meals No Overnight 0 82 0 50
60730 - Spec Pay - Safety Equipment 17,248 3,802 4,750 5,500
60740 - Spec Pay - Meal Allowance 809 1,055 809 2,000
60780 - Spec Pay - Tank Climb Pay 165 30 1,200 1,200
6A - Salaries & Wages Total 1,589,640 1,668,427 1,823,162 1,980,351
6B - Employee Benefits
600 - Water Operating
61100 - FICA - City Contribution 114,118 120,057 138,925 149,800
61300 - IPERS - City Contribution 144,024 152,637 178,689 184,845
61510 - Health Insurance 319,780 332,464 328,864 342,696
61540 - Life Insurance 976 964 1,150 1,196
61600 - Workers' Compensation 78,771 48,369 43,398 40,389
61992 - Physicals 142 1,107 142 1,107
6B - Employee Benefits Total 657,812 655,598 691,168 720,033
6C - Staff Development
600 - Water Operating
62100 - Association Dues 2,869 2,298 4,423 5,770
62200 - Subscriptions 158 0 540 540
62325 - Mileage 1,628 1,928 3,974 4,724
62400 - Meetings & Conferences 52 473 4,850 5,350
62500 - Education Reimbursement 4,244 20,345 15,139 20,797
6C - Staff Development Total 8,950 25,044 28,926 37,181
6D - Repair/Maint/Util
600 - Water Operating
63100 - Building Maintenance 43,730 49,910 45,170 49,910
63312 - Vehicle Ops - Gasoline 26,448 38,973 22,435 29,380
63320 - Vehicle Repair - Internal 34,923 40,678 32,576 45,625
63321 - Vehicle Repair - Outsourced 9,414 3,164 4,335 6,920
63322 - Vehicle Repair - Accident 0 0 0 0
63400 - Equipment Maint/Repair 63,208 57,990 63,457 61,918
63425 - Meter Maintenance 3,494 392 8,058 2,000
63430 - Instrument Maintenance 13,520 29,704 13,520 30,298
63710 - Electricity 730,336 768,106 668,402 969,299
63711 - Natural Gas 33,216 46,462 39,992 53,580
63730 - Telecommunications 22,409 22,048 19,370 25,798
63742 - Stormwater 418 1,460 453 1,557
63790 - Other Utility Expense 0 9,779 1,500 15,000
6D - Repair/Maint/Util Total 981,115 1,068,666 919,268 1,291,285
6E - Contractual Svcs
600 - Water Operating
Recommended Operating Expenditure Budget - Department Total
42 - WATER
Fund/Account/Account Title
FY21 Actual
Expense
FY22 Actual
Expense
FY23 Adopted
Budget
FY 24 Recomm'd
Budget
-36-
64010 - Accounting & Auditing 3,600 3,800 3,708 3,800
64020 - Advertising 3,599 2,930 3,516 2,930
64030 - Outsourced Labor 0 0 0 0
64040 - Collections 919 1,452 890 1,452
64045 - Bad Debt Expense 0 0 0 0
64062 - Refunds (6,119) 937 0 937
64080 - Insurance - Property 67,130 84,648 89,389 104,741
64081 - Insurance - Liability 21,391 25,199 29,293 28,064
64083 - Insurance - Other 0 0 0 0
64110 - Legal 1,916 27,713 0 0
64135 - Grants 3,452 795 10,000 10,000
64140 - Printing 376 1,982 1,055 1,270
64145 - Copying 2,848 1,625 3,491 3,509
64150 - Rental - Equipment 8,622 4,731 8,622 10,000
64160 - Rental - Land/Bldgs/Parking 3,942 660 3,942 660
64175 - Landfill Fees 152 67 152 152
64180 - Sales Tax Expense 460,710 488,525 460,710 545,649
64185 - License/Permit/Fees 7,209 6,860 7,209 6,860
64190 - Technology Services 56,237 48,675 97,254 104,832
64191 - IT Recharges 0 0 0 21,743
64820 - One Call 8,657 7,406 7,226 7,406
64825 - Fire Suppression 435 1,082 435 1,082
64865 - Elevator Service 2,410 2,473 2,410 2,410
64870 - HVAC Services 2,735 3,570 3,744 3,744
64880 - Custodial Services 0 0 0 0
64900 - Other Professional Service 82,067 71,132 108,600 145,200
64975 - Equip Maint Cont 1,963 1,944 1,963 1,944
64980 - Technology Equip Maint Cont 21,054 21,054 20,800 12,777
64985 - Hauling Contract 212,476 267,552 165,000 330,000
64990 - Other Contractual Service 0 0 6,000 6,000
6E - Contractual Svcs Total 967,782 1,076,811 1,035,409 1,357,162
6F - Commodities
600 - Water Operating
65010 - Chemicals 428,705 442,320 484,700 622,500
65040 - Small Tools & Equipment 15,353 10,403 17,201 14,379
65045 - Technology Equipment 436 5,541 81,312 4,830
65050 - Other Equipment 0 49,209 64,500 50,800
65054 - Safety Equipment 926 0 1,000 0
65060 - Office Supplies 4,460 1,867 7,760 3,101
65080 - Postage/Shipping 2,039 2,407 2,080 2,658
65100 - Safety Supplies 8,196 8,122 8,361 8,122
65925 - Uniform Purchase 17,962 19,687 20,070 27,000
65950 - Valves/Fittings 98,300 142,266 125,472 142,266
65960 - Repair Parts 4,230 4,730 7,136 4,829
65965 - Janitorial 3,358 4,998 3,734 5,188
65970 - Lab Supplies 13,216 21,830 13,480 21,830
65975 - Plumbing Supplies 697 67 1,235 70
65980 - Construction Supplies 2,074 817 2,037 926
65981 - Street Materials 0 0 0 0
65990 - Other Supplies 4,734 10,386 4,829 10,386
6F - Commodities Total 604,687 724,651 844,907 918,885
Recommended Operating Expenditure Budget - Department Total
42 - WATER
Fund/Account/Account Title
FY21 Actual
Expense
FY22 Actual
Expense
FY23 Adopted
Budget
FY 24 Recomm'd
Budget
-37-
6G - Capital Outlay
600 - Water Operating
67100 - Vehicles 92,263 0 66,000 0
67210 - Furniture/Fixtures 2,033 0 0 1,500
67230 - Heavy Equipment 141,426 0 0 23,000
67250 - Office Equipment 0 0 0 0
67270 - Other Capital Equipment 0 0 8,000 18,000
67500 - Buildings 0 0 0 0
67809 - Water - Meters 54,243 97,088 0 0
67810 - Water - Large Meters 85,640 18,886 191,306 200,000
67815 - Water - Hydrants 32,351 30,877 70,000 70,000
67990 - Other Capital Outlay 298,071 379,271 484,000 420,000
6G - Capital Outlay Total 706,026 526,122 819,306 732,500
6H - Debt Service
600 - Water Operating
68010 - Principal Payment 11,138,835 6,824,142 2,078,929 2,112,595
68020 - Interest Payments 830,372 615,593 613,541 576,953
68980 - Financial Consultant 14,139 31,250 14,139 0
68990 - Paying Agent Fees 971 447 971 0
6H - Debt Service Total 11,984,316 7,471,433 2,707,580 2,689,548
6I - Transfers
600 - Water Operating
69100 - Transfers Out To General Fund 567,194 578,155 595,651 1,512,215
69601 - Transfers Out to Water Cap 550,000 400,000 1,000,000 1,000,000
6I - Transfers Total 1,117,194 978,155 1,595,651 2,512,215
WATER - Total 18,617,522 14,194,908 10,465,377 12,239,160
Recommended Operating Expenditure Budget - Department Total
42 - WATER
Fund/Account/Account Title
FY21 Actual
Expense
FY22 Actual
Expense
FY23 Adopted
Budget
FY 24 Recomm'd
Budget
-38-
0000 - No Sub-Activity
600 - Water Operating
6E - Contractual Svcs ———
6I - Transfers 978,155 1,595,651 2,512,215
0000 - No Sub-Activity Total 978,155 1,595,651 2,512,215
4201 - Administration
600 - Water Operating
6A - Salaries & Wages 388,285 319,704 523,463
6B - Employee Benefits 143,733 110,811 170,659
6C - Staff Development 6,597 9,403 15,500
6D - Repair/Maint/Util 1,189 1,872 1,872
6E - Contractual Svcs 579,595 485,655 604,534
6F - Commodities 1,612 65,750 826
6G - Capital Outlay ———
6H - Debt Service 7,471,433 2,707,580 2,689,548
6I - Transfers ———
4201 - Administration Total 8,592,444 3,700,775 4,006,402
4202 - Meters
600 - Water Operating
6A - Salaries & Wages 196,790 204,143 310,200
6B - Employee Benefits 78,704 81,766 111,452
6C - Staff Development 3,615 5,086 5,678
6D - Repair/Maint/Util 18,531 16,695 24,226
6E - Contractual Svcs 44,952 68,394 73,289
6F - Commodities 5,363 7,893 11,370
6G - Capital Outlay 0 0 0
4202 - Meters Total 347,955 383,977 536,215
4203 - Plant Operations and Maint
600 - Water Operating
6A - Salaries & Wages 558,249 647,892 599,276
6B - Employee Benefits 227,290 253,971 226,074
6C - Staff Development 6,064 3,501 4,567
6D - Repair/Maint/Util 926,354 799,465 1,146,637
6E - Contractual Svcs 401,443 346,655 526,904
6F - Commodities 536,506 528,916 680,197
6G - Capital Outlay 0 66,000 1,500
4203 - Plant Operations and Maint Total 2,655,906 2,646,400 3,185,155
4204 - Distribution System
600 - Water Operating
6A - Salaries & Wages 525,103 651,423 547,412
6B - Employee Benefits 205,871 244,620 211,848
6C - Staff Development 8,769 10,936 11,436
6D - Repair/Maint/Util 122,592 101,236 118,550
6E - Contractual Svcs 49,898 51,705 69,435
6F - Commodities 181,170 227,348 211,492
6G - Capital Outlay 30,877 70,000 93,000
4204 - Distribution System Total 1,124,281 1,357,268 1,263,173
4220 - Storage Tank Inspection
Recommended Expenditure Budget Report by Activity & Funding Source
42 - WATER
Fund/Activity FY22 Actual Expense FY23 Adopted Budget
FY24 Recomm'd
Budget
-39-
600 - Water Operating
6E - Contractual Svcs 0 15,000 15,000
4220 - Storage Tank Inspection Total 0 15,000 15,000
4221 - Meter Reading System Maint
600 - Water Operating
6G - Capital Outlay 0 0 0
4221 - Meter Reading System Maint Total 0 0 0
4222 - Pump/Vacuum Filter Replace
600 - Water Operating
6F - Commodities 0 15,000 15,000
4222 - Pump/Vacuum Filter Replace Total 0 15,000 15,000
4224 - Fire Hydrant Painting
600 - Water Operating
6E - Contractual Svcs 0 5,000 5,000
4224 - Fire Hydrant Painting Total 0 5,000 5,000
4225 - GIS Maint/Updates
600 - Water Operating
6E - Contractual Svcs 128 0 0
4225 - GIS Maint/Updates Total 128 0 0
4226 - Service Line Assistance
600 - Water Operating
6E - Contractual Svcs 0 35,000 35,000
4226 - Service Line Assistance Total 0 35,000 35,000
4227 - Valve Replacement
600 - Water Operating
6G - Capital Outlay 5,900 84,000 20,000
4227 - Valve Replacement Total 5,900 84,000 20,000
4228 - Internal Lines Loan
600 - Water Operating
6G - Capital Outlay 7,283 0 0
4228 - Internal Lines Loan Total 7,283 0 0
4229 - Main Replacements
600 - Water Operating
6A - Salaries & Wages 0 0 0
6B - Employee Benefits 0 0 0
6F - Commodities 0 0 0
6G - Capital Outlay 311,150 350,000 350,000
4229 - Main Replacements Total 311,150 350,000 350,000
4230 - Meter Exchange
600 - Water Operating
6G - Capital Outlay 115,974 191,306 200,000
4230 - Meter Exchange Total 115,974 191,306 200,000
4231 - Leak Repair Grant
600 - Water Operating
6E - Contractual Svcs 795 5,000 5,000
4231 - Leak Repair Grant Total 795 5,000 5,000
4232 - Valve Box Maintenance
600 - Water Operating
6G - Capital Outlay 47,365 25,000 25,000
Recommended Expenditure Budget Report by Activity & Funding Source
42 - WATER
Fund/Activity FY22 Actual Expense FY23 Adopted Budget
FY24 Recomm'd
Budget
-40-
4232 - Valve Box Maintenance Total 47,365 25,000 25,000
4234 - Generator Maintenance
600 - Water Operating
6G - Capital Outlay 0 8,000 18,000
4234 - Generator Maintenance Total 0 8,000 18,000
4235 - County Water Assistance
600 - Water Operating
6E - Contractual Svcs 0 5,000 5,000
4235 - County Water Assistance Total 0 5,000 5,000
4236 - Water Meter Testing
600 - Water Operating
6G - Capital Outlay 7,573 25,000 25,000
4236 - Water Meter Testing Total 7,573 25,000 25,000
4237 - Water Leak Survey
600 - Water Operating
6E - Contractual Svcs 0 18,000 18,000
4237 - Water Leak Survey Total 0 18,000 18,000
4299 - Pcard Clearing
600 - Water Operating
6F - Commodities 0 0 0
4299 - Pcard Clearing Total 0 0 0
WATER TOTAL 14,194,908 10,465,377 12,239,160
Recommended Expenditure Budget Report by Activity & Funding Source
42 - WATER
Fund/Activity FY22 Actual Expense FY23 Adopted Budget
FY24 Recomm'd
Budget
-41-
C I T Y O F D U B U Q U E , I O W A
DEPARTMENT DETAIL - PERSONNEL COMPLEMENT
42 WATER DEPARTMENT
FY 2022 FY 2023 FY 2024
FD JC WP-GR JOB CLASS FTE BUDGET FTE BUDGET FTE BUDGET
61010 Full Time Employee Expense
640 3275 GE-40 WATER DEPARTMENT MANAGER 1.00 $ 112,150 1.00 $ 100,347 1.00 $ 110,672
640 3200 GE-36 WATER DISTRIBUTION SUPERVISOR 1.00 $ 93,267 1.00 $ 96,307 1.00 $ 98,815
640 — GE-36 WATER OPERATIONS SUPERVISOR 1.00 $ 72,370 1.00 $ 74,730 1.00 $ 82,490
640 2950 GE-33 WATER ENGINEERING ASSISTANT 1.00 $ 77,143 1.00 $ 79,653 1.00 $ 83,315
640 2650 GE-31 WATER METER FOREMAN —$ — —$ — 1.00 $ 75,563
640 2650 GE-31 FOREPERSON - WATER DISTR.1.00 $ 69,277 1.00 $ 71,870 1.00 $ 75,563
640 2610 GE-30 GIS SPECIALIST 1.00 $ 66,299 1.00 $ 68,450 1.00 $ 71,598
640 GE-25 CONFIDENTIAL ACCOUNT CLERK 1.00 $ 50,255 1.00 $ 51,879 1.00 $ 54,716
640 2400 OE-16 ELECTRONIC TECHNICIAN 1.00 $ 66,645 1.00 $ 69,105 1.00 $ 80,844
640 2800 OE-14 EQUIPMENT MECHANIC 1.00 $ 63,616 1.00 $ 63,768 1.00 $ 66,699
640 2550 OE-16 WATER PLANT OPR CERT GR III/IV 1.00 $ 60,812 1.00 $ 65,814 1.00 $ 60,357
640 OE-11 WATER PLANT OPERATOR CRT GR I —$ — 1.00 $ 56,355 1.00 $ 61,283
640 2475 OE-12 WATER PLANT OPERATOR CRT GR II 1.00 $ 59,260 1.00 $ 61,179 1.00 $ 63,992
640 2475 OE-16 WATER PLANT OPERATOR CRT GR IV 4.00 $ 261,999 3.00 $ 202,706 3.00 $ 212,716
640 2305 OE-10 EQUIPMENT OPERATOR II 1.00 $ 58,074 1.00 $ 60,167 1.00 $ 62,933
640 1775 OE-09 WATER METER REPAIR WORKER I 2.00 $ 113,210 2.00 $ 118,098 2.00 $ 124,488
640 OE-14 WATER METER REPAIR WORKER II 1.00 $ 62,381 1.00 $ 64,537 —$ —
640 1476 OE-09
WATER DISTR MAINTENANCE
WORKER 6.00 $ 322,400 6.00 $ 340,132 7.00 $ 412,309
TOTAL FULL TIME EMPLOYEES 25.00 $ 1,609,158 25.00 $ 1,645,097 26.00 $ 1,798,353
61020 Part-Time Employee Expense
640 1476 OE-09
WATER DISTR MAINTENANCE
WORKER 0.50 $ 25,599 0.50 $ 26,434 0.50 $ 28,326
640 2050 OE-03 CUSTODIAN I 0.07 $ 3,461 0.07 $ 3,251 0.07 $ 3,400
TOTAL PART TIME EMPLOYEES 0.57 $ 29,060 0.57 $ 29,685 0.57 $ 31,726
61030 Seasonal Employee Expense
640 NA-37 GIS INTERN 0.50 $ 15,545 0.50 $ 16,046 0.50 $ 16,784
TOTAL SEASONAL EMPLOYEES 0.50 $ 15,545 0.50 $ 16,046 0.50 $ 16,784
TOTAL WATER DEPARTMENT 26.07 $ 1,653,763 26.07 $ 1,690,828 27.07 $ 1,846,863
-42-
Water Administration-FT
64042100 61010 640 2610 GE-30 GIS SPECIALIST 1.00 $ 66,299 1.00 $ 68,450 1.00 $ 71,598
64042100 61010 640 3275 GE-40 WATER DEPARTMENT MANAGER 1.00 $ 112,150 1.00 $ 100,347 1.00 $ 110,672
64042100 61010 640 GE-25 CONFIDENTIAL ACCOUNT CLERK 1.00 $ 50,255 1.00 $ 51,879 1.00 $ 54,716
64042100 61010 640 2950 GE-33 WATER ENGINEERING ASSISTANT 1.00 $ 77,143 1.00 $ 79,653 1.00 $ 83,315
64042400 61010 640 GE-36
WATER OPERATIONS
SUPERVISOR —$ — —$ — 1.00 $ 82,490
64042100 61010 640 3200 GE-37
WATER DISTRIBUTION
SUPERVISOR 1.00 $ 93,267 —$ — 1.00 $ 98,815
Total 5.00 $ 399,114 4.00 $ 300,329 6.00 $ 501,606
Water Administration-SEASONAL
64042100 61030 640 NA-37 GIS INTERN 0.50 $ 15,545 0.50 $ 16,046 0.50 $ 16,784
Total 0.50 $ 15,545 0.50 $ 16,046 0.50 $ 16,784
Water Meters-FT
64042300 61010 640 1775 OE-09 WATER METER REPAIR WORKER I 2.00 $ 113,210 2.00 $ 118,098 2.00 $ 124,488
64042300 61010 640 OE-14 WATER METER FOREMAN 1.00 $ 75,563
64042300 61010 640 OE-14
WATER METER REPAIR WORKER
II 1.00 $ 62,381 1.00 $ 64,537 —$ —
64042300 61010 640 1476 OE-09
WATER DISTR MAINTENANCE
WORKER —$ — —1.00 $ 60,431
Total 3.00 $ 175,591 3.00 $ 182,635 4.00 $ 260,482
Water Meters-PT
64042300 61020 640 1476 OE-09
WATER DISTR MAINTENANCE
WORKER —$ — —0.50 $ 28,326
Total —$ — —$ — 0.50 $ 28,326
Water Plant Operation-FT
64042400 61010 640 OE-11
WATER PLANT OPERATOR CRT
GR I —$ — 1.00 $ 56,355 1.00 $ 61,283
64042400 61010 640 2475 OE-12
WATER PLANT OPERATOR CRT
GR II 1.00 $ 59,260 1.00 $ 61,179 1.00 $ 63,992
64042400 61010 640 2550 OE-16 WATER PLANT OPR CERT GR III/IV 1.00 $ 60,812 1.00 $ 65,814 1.00 $ 60,357
64042400 61010 640 OE-16
WATER PLANT OPERATOR CRT
GR IV 4.00 $ 261,999 3.00 $ 202,706 3.00 $ 212,716
64042400 61010 640 GE-36
WATER OPERATIONS
SUPERVISOR 1.00 $ 72,370 1.00 $ 74,730 —$ —
64042400 61010 640 2800 OE-16 ELECTRONIC TECHNICIAN 1.00 $ 66,645 1.00 $ 69,105 1.00 $ 80,844
64042400 61010 640 3015 OE-14 EQUIPMENT MECHANIC 1.00 $ 63,616 1.00 $ 63,768 1.00 $ 66,699
Total 9.00 $ 584,702 9.00 $ 593,657 8.00 $ 545,891
Water Distribution-FT
64042700 61010 640 1476 OE-09
WATER DISTR MAINTENANCE
WORKER 6.00 $ 322,400 6.00 $ 340,132 6.00 $ 351,878
64042700 61010 640 3200 GE-36
WATER DISTRIBUTION
SUPERVISOR —$ — 1.00 $ 96,307 —$ —
64042700 61010 640 2305 OE-10 EQUIPMENT OPERATOR II 1.00 $ 58,074 1.00 $ 60,167 1.00 $ 62,933
64042700 61010 640 2650 GE-31 FOREPERSON - WATER DISTR.1.00 $ 69,277 1.00 $ 71,870 1.00 $ 75,563
Total 8.00 $ 449,751 9.00 $ 568,476 8.00 $ 490,374
Water Distribution - PT
64042700 61020 640 1476 OE-09
WATER DISTR MAINTENANCE
WORKER 0.50 $ 25,599 0.50 $ 26,434 —
64042700 61020 640 2050 GD-03 CUSTODIAN I 0.07 $ 3,461 0.07 $ 3,251 0.07 $ 3,400
Total 0.57 $ 29,060 0.57 $ 29,685 0.07 $ 3,400
TOTAL WATER DEPARTMENT 26.07 $ 1,653,763 26.07 $ 1,690,828 27.07 $ 1,846,863
CITY OF DUBUQUE, IOWA
ACTIVITY PERSONNEL COMPLEMENT SUMMARY
FY 2022 FY 2023 FY 2024
ACCT FD JC WP-GR POSITION CLASS FTE BUDGET FTE BUDGET FTE BUDGET
-43-
4281000001 SCADA and Communications Imp Water 601 67990 1,075,000
4281000005 Water Main Replacements - Streets Water 601 67990 544,500
4281000006 Wells/Well Field Rehab Water 601 64070 20,000
4281000006 Wells/Well Field Rehab Water 601 67990 160,000
4281000013 Water Meter Replacement Water 601 64900 442,500
4281000013 Water Meter Replacement Water 601 67270 125,000
4281000015 Generator-Park hill&MtCaramel Water 601 67990 30,000
4281000018 Fire hydrant Recl/replc Water 601 67990 20,000
4281000022 Water main replc-Sewer prog Water 601 64070 12,000
4281000022 Water main replc-Sewer prog Water 601 67990 120,000
4281000024 Public lead line water replc Water 601 64070 40,000
4281000024 Public lead line water replc Water 601 67990 310,000
4281000026 Water Treatment Plant Plan Water 601 64070 200,000
4281000043 MCFADDEN WATER MAIN IMP Water 601 64070 55,800
4281000043 MCFADDEN WATER MAIN IMP Water 601 67990 497,610
4281000044 WTP Roof Repair Water 601 67990 125,000
4281000045 Green Alley Water Main Imp Water 601 64070 26,000
4281000045 Green Alley Water Main Imp Water 601 67990 280,000
4281000048 West End Annex Study & Imp Phase I Water 601 64070 100,000
4281000048 West End Annex Study & Imp Phase I Water 601 67990 600,000
4281000050 Private Lead Line Replacement Prog Water 601 64070 348,150
4281000050 Private Lead Line Replacement Prog Water 601 67990 5,000,000
4281000051 Source Water PFAS Red - Deep Water Water 601 64070 550,000
4281000051 Source Water PFAS Red - Deep Water Water 601 67990 600,000
4281000054 Water Treatment Boiler Replacements Water 601 67500 100,000
4281000055 West 32nd Dev - Water Main Water 601 64070 25,000
4281000055 West 32nd Dev - Water Main Water 601 67990 191,000
WATER TOTAL 11,597,560
Capital Improvement Projects by Department/Division
WATER
Project
Number Capital Improvement Project Title Department Fund Account
FY 24 Recomm'd
Budget
-44-
Water Meter Replacement
Program $ 567,500 $ 400,000 $ 350,000 $ — $ 130,950 $ 1,448,450 72
Water Main Upgrades during
Street General Repairs $ — $ — $ — $ — $ 20,000 $ 20,000 73
Fire Hydrant Assembly
Relocation/Replacement for the
Sidewalk Program $ 20,000 $ — $ — $ — $ — $ 20,000 74
Water Main Replacement
Consent $ 132,000 $ 212,000 $ 99,000 $ — $ 660,000 $ 1,103,000 75
Public Lead Line Water Main
Replacement $ 350,000 $ — $ — $ — $ — $ 350,000 76
Wells, Well Field, & Well
Transmission Piping Repair and
Rehabilitation Program $ 180,000 $ — $ 110,500 $ — $ 165,000 $ 455,500 77
Water Treatment Plant Condition
Assessment and Master Plan $ 200,000 $ — $ — $ — $ — $ 200,000 78
McFadden Farm Water Main $ 553,410 $ — $ — $ — $ — $ 553,410 79
SCADA & Comms Improvements $ 1,075,000 $ — $ — $ — $ — $ 1,075,000 80
Green Alley Water Main
Improvements $ 306,000 $ — $ — $ — $ — $ 306,000 82
Generators-Park Hill & Mt. Carmel $ 30,000 $ — $ — $ — $ 175,000 $ 205,000 83
West End Annexation Study and
Implementation Phase I $ 700,000 $ — $ — $ — $ — $ 700,000 84
Water Main Replacements -
Streets $ 544,500 $ 91,790 $ 50,000 $ — $ — $ 686,290 85
North Cascade Road (from Edval
Lane to Southwest Arterial) 3rd
Pressure Zone $ — $ — $ — $ — $ 853,500 $ 853,500 87
Private Lead Line Replacement $ 5,348,150 $ 10,727,500 $ 10,772,200 $ 5,173,150 $ 175,000 $ 32,196,000 88
Water Treatment Boiler
Replacements $ 100,000 $ — $ 236,000 $ — $ — $ 336,000 89
Water Treatment Plant Roof
Replacement $ 125,000 $ — $ — $ — $ 110,000 $ 235,000 90
West 32nd Development $ 216,000 $ — $ — $ — $ — $ 216,000 91
Third Pressure Zone Connection
(Tanzanite Drive to Olympic
Heights)$ — $ — $ — $ 1,000,000 $ — $ 1,000,000 92
Source Water PFAS Reduction
Project $ 1,150,000 $ 2,300,000 $ 750,000 $ — $ — $ 4,200,000 93
Source Water PFAS Reduction
Project - Granular Activated
Carbon Filter Rehabilitation $ — $ — $ — $ 1,750,000 $ 1,750,000 $ 3,500,000 94
TOTAL $ 11,597,560 $ 13,731,290 $ 12,367,700 $ 7,923,150 $ 4,039,450 $ 49,659,150
PRGRM/
DEPT PROJECT DESCRIPTION FY 2024 FY 2025 FY 2026 FY 2027 FY 2028 TOTAL PAGE
WATER DEPARTMENT
Business Type
-45-
This page intentionally left blank.
-46-
WATER
DEPARTMENT
FISCAL YEAR 2024
BUDGET PRESENTATION
MISSION STATEMENT
Water Department
The City of Dubuque Water Department is passionate
about delivering high quality drinking water with excellent
customer service, while meeting our customers’ changing
needs with equitable and sustainable rates.
Retirements of FY2024
Insert
Image
Here
Insert
Image
Here
Kerry Leppert
Water Engineering
Assistant
7 Years of Service
Brant Schueller
Water Distribution
Supervisor
27 Years of Service
Ken Metcalf
Water Distribution
Maintenance Worker
45 Years of Service
Water Department FY24 (27.07 Full-Time Equivalents)
Recognition of Staff for Iowa DNR Certifications Obtained
Insert
Image
Here
Insert
Image
Here
Bob Childers -Water Distribution Grade 1
Marty Kass -Water Distribution Grade 1
Rob Blake -Water Distribution Grade 2
Jeff Mills -Water Distribution Grade 2
Darrin Homb -Water Distribution Grade 3
Marty Kearney -Water Distribution Grade 3
Steve Valentine -Water Distribution Grade 3
Luke Meadows -Water Treatment Grade 2 & Water Distribution Grade 1
Insert
Image
Here
Insert
Image
Here
FISCAL YEAR 2023
HIGHLIGHTS
•City Well Rehabilitation Project
•Well No. 8
◦Well Pump Rebuild
◦New Motor
◦New Column Pipe
•Contract Amount: $101,480
•Contractor: Peerless Well and Pump
•Placed back into Service: February 2023
FISCAL YEAR 2023
HIGHLIGHTS
•Water Meter Technical Upgrade
Program
•Water Meter Product Replacement of Meter
Interface Units and Registers
•5-Year Program. Initiated in FY2022.
◦In Progress
•Work Performed by Water Department Meter
Crew.
•Total Project Cost Estimate: $1,885,000
Danny Petersen installing new MIU
FISCAL YEAR 2023
HIGHLIGHTS
•Kennedy Road water main extension, 4,050 lineal feet
of 12” water main to Wildflower Ridge
•Silver Oaks Subdivision, Phase 3 (off Elmwood Drive)
•Vintage Estates Subdivision (off Kennedy Road)
•Rustic Point Subdivision Phase 2 (off Kennedy Road)
•Kennedy Court water main replacement, 600 lineal
feet of 6” water main
•Fountain Park water main replacement, 285 lineal feet
of 6” water main
•Stoneman Road, hydrants, valves, water main
extension and sections replaced, Kennedy Mall loop
connection
FUTURE
INITIATIVES
•City Well Rehabilitation
◦Well No. 7 -Pump Replacement, Motor
Replacement, and Sand/Sediment Filtration
System-Cost Estimate $500,000
FUTURE
INITIATIVES
Drinking Water Quality Improvements: PFAS
•Proposed Change to Safe Drinking Water Act
(SDWA) and the National Primary Drinking Water
Regulation (NPDWR) released March 14, 2023
◦Public Comment Period to follow
•Final Regulation for the SDWA: End of 2023
•Dubuque and PFAS
◦Iowa DNR Statewide Testing Initiate in 2022
◦Detects were found in August 2022
◦Actions taken including:
▪Taking wells off-line
▪Consulting with PFAS experts for
treatment techniques and source
changes
▪Development of a Capital Improvement
Plan -Advancing New Deep Well(s)
▪Quarterly Testing of Dubuque’s Wells
SOURCE
WATER
Shallow Wells No. 2, 3, 4, 9, & 10
SOURCE
WATER
Deep Wells No. 5, 6, 7, & 8
FUTURE
INITIATIVES
Lead Service Line Replacement Project
•Multi Year Replacement Program
for an estimated 3,257 Lead
Service Lines
•1st of 4 Phases Scheduled to
begin in FY2024
◦2 Year Construction period
per phase
◦$0 Cost to the Owner or
Tenant in Disadvantaged
Communities
•Funding: Bipartisan
Infrastructure Law monies to
Iowa State Revolving Fund Loan
Program
•90% Loan Forgiveness in
Disadvantaged Community Areas
FUTURE
INITIATIVES
•Emergency Response
◦Park Hill Standpipe Emergency Generator
Installation Project
FY 24 PROPOSED RATE INCREASE
8%
Proposed Rate
Increase over FY 23
$2.64
Monthly Bill Impact for
Average Household*
*Average Household = 6,000 Gallons/Month
RATE COMPARISON
FY24 Water Rate Comparison
2nd Lowest Rates:The Highest Water
Rate (West Des Moines)is 19.88%
Higher than Dubuque’s Rate;and the
Average Rate is 5.31%Higher than
Dubuque.
Based Average Household = 6,000 Gallons/Month
%
WATER ADMINISTRATION
•Employee Training and Development
◦Professional Development
◦On Boarding of New Employees
◦Continuing Education Programs
•Regulatory Compliance
◦Reporting, monitoring, and working with
Iowa DNR and EPA on compliance.
•Capital Improvement Planning
◦Project development including
budgeting, initiation, and award through
construction completion.
WATER TREATMENT PLANT OPERATIONS
•Water Production and Treatment
◦Regulatory Compliance
◦Water Quality -Consumer Confidence
•Source Water Protection
◦Wells and the Well field
◦Treatment Plant
•Water Storage and Pumping Facility
Operation and Maintenance
•Reliable Data Access and Reporting
◦SCADA Communications
WATER PLANT OPERATIONS
Water Treatment Plant Condition
Assessment and Plant Improvements with
Strand Associates.
Updated Plant Information:
•Well Capacity: 14.0 to 17.5 MGD
•Plant Capacity: 12.6 to 13.6 MGD
•Peak Day Demand : 9.13 MGD
(Routine Operations June 2021)
•Peak Day Demand : 10.7 MGD* (Large
Main Break November 2017)
•Average Day Demand: 7.0 MGD
Eagle Point Water Treatment Plant
WATER PLANT OPERATIONS
WATER DISTRIBUTION
•Operation and Maintenance
•Emergency Response
•Inspection
•General Construction
•Service Line Main Taps
•Water Main Installation
•Meter Management
•Backflow Prevention
•Development Review
WATER DISTRIBUTION
WATER
DISTRIBUTION
*FY 2023 to date:
67 Service Taps
New Connections
result from
community growth
such as new housing,
businesses, and
industry.
WATER
DISTRIBUTION
Starting in FY20, the Water
Distribution Meter Crew
assumed all responsibility
for:
•meter repairs,
•testing,
•change outs, and
•service calls, which were
originally handled by
Utility Billing.
Backflow Prevention Program
•Administered internally.
•Administrative fee $25/device.
•FY2024 Revenue Forecast:
◦$79,325
◦Based on projected 3,173
devices.
Jeff Mills performs backflow recertification testing
FY 2024
RECOMMENDED
IMPROVEMENT
REQUESTS
1.Creation of One Additional Water Distribution Maintenance
Worker Position
Estimated Cost: $80,931 (Recurring)
2.Elimination of Water Meter Repair Worker II and Addition of a
Water Meter Foreperson (Internal Promotion)
Estimated Cost : $8,681 (Recurring)
3. Upgrade Ruggedized Cell Phone to Smartphone for Eagle
Point Water Treatment Plant Operator (Staffed 24/7/365)
Estimated Purchase Price : $586 (Non-Recurring)
Project FY 24 Cost Project Cost
Water Main Replacements -Streets $544,500 $686,920
McFadden Property Water Main Extension $553,410 $553,410
Private Lead Service Line Replacement $5,348,150 $32,196,000
Green Alley Water Main Improvements $306,000 $306,000
Park Hill Pump Station Emergency Backup Generator $30,000 $205,000
Water Treatment Plant Boiler Replacements $100,000 $336,000
Fire Hydrant Assembly Relocation/Replacement for
Sidewalk Program $20,000 $20,000
Water Treatment Plant Roof Replacement $125,000 $235,000
West End Annexation Study and Implementation Phase
1 $700,000 $700,000
FY 24 CAPITAL IMPROVEMENT PROJECTS (Continued)
Water Department
Project FY 24 Cost Total Project Cost
Water Meter Replacement Program $567,500 $1,885,000
W.32nd Water Main Extension $216,000 $216,000
Source Water PFAS Reduction Project $1,150,000 $4,200,000
Wells, Well Field, and Raw Transmission Piping Repair $180,000 $455,500
Water Treatment Plant Condition Assessment and
Master Plan $200,000 $200,000
Water Main Replacements -Sanitary Sewer Program -
Custer & Auburn Streets $132,000 $1,103,000
SCADA & Comms Improvements $1,075,000 $1,075,000
Public Lead Line Water Main Replacement $350,000 $350,000
FY 24 CAPITAL IMPROVEMENT PROJECTS
Water Department
PERFORMANCE MEASURES
WATER DEPARTMENT
Goals that are on track:
# of Regulatory Compliance
Violations, Target Zero (0)
# of Completed Annual Training
hours to support CEUs, reported
in staff hours
% of Projects Completed within
the Program Budget
Goals Improving:
# of Breaks per 100 miles of
Pipe
O&M Costs for Water
Distribution per 100 miles of
pipe
Operation of 10% of
Distribution System Valves
Annually
THANK YOU
www.cityofdubuque.org/water
Discounted City Utilities Program
The City offers income-qualified residential customers
a reduction in monthly fees for all four City utilities
(water, sanitary sewer, refuse collection, and storm
water) of up to 50% of the base rate. Customers
must submit an application for consideration and
applications are renewed on an annual basis.
Learn more and fill out a short application at:
www.cityofdubuque.org/utilitiesdiscount
or call 563.589.4144
You may be eligible for
DISCOUNTED OR FREE
INTERNET through the
Affordable Connectivity
Program (ACP).
Struggling to
afford internet?
How It Works
ACP gives a discount on your household’s monthly internet service. Participating
internet service providers will apply this discount directly to your service plan.
If eligible, your household can receive:
• $30 per month discount on wireless internet plans and a free phone
• OR $30 per month discount on wired internet service to your home
• One-time discount of up to $100 for a laptop, tablet, or desktop computer.
A small fee will be required.
Your household may be eligible if someone in the household:
• Receives SNAP, Medicaid, or other government benefits, or
• Meets income guidelines, or
• Goes to a school where they receive free or reduced-price lunch and breakfast.
Find out if you qualify and how to
participate at acp.cityofdubuque.org
If you don’t have access to a computer or internet to apply, free access is available at Carnegie-Stout Public Library.