2023 Asphalt Overlay Ramp Project Four Copyrighted May 1, 2023 City of Dubuque Consent Items # 05. City Council Meeting ITEM TITLE: 2023 Asphalt Overlay Ramp Project Four SUM MARY: City Manager recommending City Council adopt a resolution awarding the construction contract for the 2023 Asphalt Overlay Ramp Project Four to Valentine Construction Co., LLC in the amount of$71,949.35. RESOLUTION Awarding Public Improvement Contract for the 2023 Asphalt Overlay Ramp Project Four SUGGESTED Suggested Disposition: Receive and File;Adopt Resolution(s) DISPOSITION: ATTACHMENTS: Description Type MVM Memo City Manager Memo Staff Memo Staff Memo Resolution Resolutions Dubuque THE CITY QF � All-Meriea Ciry DLT B E ; . � . � �� � � MaSt� Z�C� aYd t�Q Mt55ZSSZ Z zoa�•zoiz•�ai3 YP pp za��*zai� TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: 2023 Asphalt Overlay Ramp Project Four DATE: April 26, 2023 City Engineer Gus Psihoyos is recommending City Council adopt a resolution awarding the construction contract for the 2023 Asphalt Overlay Ramp Project Four to Valentine Construction Co., LLC in the amount of $71,949.35. I concur with the recommendation and respectfully request Mayor and City Council approval. � Mic ael C. Van Milligen MCVM:sv Attachment cc: Crenna Brumwell, City Attorney Cori Burbach, Assistant City Manager Gus Psihoyos, City Engineer John Klostermann, Public Works Director Jon Dienst, Civil Engineer II Dubuque THE CITY OF � All•Ameriea Ciq DU B E .,�{��� :,�� ,. , � ��,, I I Maste 12C2 OYl t�le M1SS1551 1 zao�•zoiz•zai3 � pp zoi�*zoi� TO: Michael C. Van Milligen, City Manager FROM: Gus Psihoyos, City Engineer DATE: April 24, 2023 RE: 2023 Asphalt Overlay Ramp Project Four INTRODUCTION The attached resolution authorizes the award of the public improvement construction contract for the 2023 Asphalt Overlay Ramp Project Four. BACKGROUND Since 1990, the City of Dubuque has installed pedestrian access ramps around the City of Dubuque to conform with the American with Disabilities Act (ADA). The pedestrian access ramps allow people with mobility difficulties to access the City's sidewalk system. The design standards for these ramps have evolved over time as more ramps have been installed and standards have changed. Since 2011, The City of Dubuque has followed the "Proposed Accessibility Guidelines for Pedestrian Facilities in the Public Right-of-Way." These are updated standards to use for facilities in the public right-of-way and addressed issues brought up since the original ADA standards were developed. The lowa Department of Transportation has adopted the PROWAG standards. The Federal Highway Administration (FHWA) has also adopted the standards and requires all cities that receive federal funding to follow these standards. DISCUSSION The 2023 Asphalt Overlay Ramp Project Four will provide for the replacement of fourteen (14) access ramps at 6 intersections in conjunction with the Public Works Asphalt Overlay program at the following locations: Judson Dr at Asbury Rd, two single directional ramps. Judson Dr at Vail Trail Ct, two single and one double directional ramp. Judson Dr at Powers Ct, two single directional ramps. Judson Dr at Judson Ct, two single directional ramps. Judson Dr at Sundown Ct, two single directional ramps. Judson Dr at Hillcrest Rd, two single directional ramps. BID RESULTS The City received bids on April 13, 2023, for the 2023 Asphalt Overlay Ramp Project Four. Valentine Construction Co., LLC of Dubuque, IA, submitted the low bid in the amount of $71,949.35 which is 7.54% below the engineer's estimate. A summary of the bid proposals received is as follows: Contractor Name Total Bid Valentine Construction Co., LLC $ 71,949.35 Midwest Concrete, Inc. $ 73,500.50 BCD Contractors $ 76,189.25 RECOMMENDATION I recommend awarding the contract for the 2023 Asphalt Overlay Ramp Project Four to Valentine Construction Co., LLC in the amount of$71,949.35. BUDGET IMPACT The estimate of probable costs for the 2023 Asphalt Overlay Ramp Project Four is as follows: Description Cost Estimate Award Construction $ 77,818.75 $ 71,949.35 Contingency 7,781.88 7,781.88 Engineering Design and Administration 12,840.09 12,840.09 Total Construction Cost Estimate $ 98,440.72 $ 92,571.32 The funding summary is as follows: Pro'ect No. Fund Description Fund Amount 5421000002 Curb Ramp Program $ 92,571.32 ACTION TO BE TAKEN The City Council is requested to award the construction contract for the 2023 Asphalt Overlay Ramp Project Four through the adoption of the attached resolution to Valentine Construction Co., LLC in the amount of$71,949.35. cc: John Klostermann, Public Works Director Jon Dienst, Civil Engineer II 2 Prepared by Kerry Bradley, City of Dubuque Engineering, 50 W. 13th St. Dubuque, IA 52001 (563)589-4270 Return to Adrienne N.Breitf&der City Clerk City of Dubuque, 50 W. 13th St. Dubuque, IA 52001 (563)589-4100 RESOLUTION NO. 123-23 AWARDING PUBLIC IMPROVEMENT CONTRACT FOR THE 2023 ASPHALT OVERLAY RAMP PROJECT FOUR Whereas, sealed proposals have been submitted by contractors for the 2023 Asphalt Overlay Ramp Project Four, (the Project) and Notice to Bidders published on the City of Dubuque, Iowa website and plan room service with statewide circulation on the 29th day of March 2023; and Whereas, said sealed proposals were opened and read on the 13th day of April 2023 and it has been determined that Valentine Construction Co., LLC of Dubuque, IA submitted the low bid in the amount of $71 ,949.35, and is the lowest responsive, responsible bidder for the Project. NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: Section 1. That a Public Improvement Contract for the Project is hereby awarded to Valentine Construction Co., LLC and the City Manager is hereby directed to execute a Public Improvement Contract on behalf of the City of Dubuque for the Project. Passed, adopted, and approved this 1st day of May2023. rad a. Ca agh, Mayor Attest: Trish Gleason, Assistant City Clerk