Acceptance 2023 Asphalt Overlay Curb Ramp Project 2City of Dubuque City Council Meeting Consent Items # 015. Copyrighted June 20, 2023 ITEM TITLE: Acceptance 2023 Asphalt Overlay Curb Ramp Project 2 SUMMARY: City Manager recommending City Council adopt the resolution to accept the public improvements and authorize the payment of the final contract amount of $103,316.73 to Midwest Concrete, Inc. of Peosta, IA, for the 2023 Asphalt Overlay Curb Ramp Project 2. RESOLUTION Accepting the 2023 Asphalt Overlay Curb Ramp Project 2 and authorizing the payment to the contractor SUGGESTED Suggested Disposition: Receive and File; Adopt Resolution(s) DISPOSITION: ATTACHMENTS: Description Type MVM Memo City Manager Memo Staff Memo Staff Memo Resolution Resolutions Engineer's Certificate of Completion Staff Memo THE C DUj!BQTE Masterpiece on the Mississippi TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: 2023 Asphalt Overlay Curb Ramp Project 2 DATE: June 13, 2023 Dubuque WAWca 914 ii 2007-2012.2013 2017*2019 City Engineer Gus Psihoyos is recommending City Council adopt the resolution to accept the public improvements and the authorize the payment of the final contract amount of $103,316.73 to Midwest Concrete, Inc. of Peosta, IA, for the 2023 Asphalt Overlay Curb Ramp Project 2. The 2023 Asphalt Overlay Curb Ramp Project 2 provided for the replacement of twenty- four access ramps and one storm intake replacement at eight intersections in conjunction with the Public Works asphalt overlay program. I concur with the recommendation and respectfully request Mayor and City Council approval. k�4 Mic ael C. Van Milligen MCVM:sv Attachment CC' Crenna Brumwell, City Attorney Cori Burbach, Assistant City Manager Gus Psihoyos, City Engineer Jon Dienst, Civil Engineer II Luke Steger, Engineering Tech THE CITY OF DUB E Masterpiece on the Mississippi TO: Michael C. Van Milligen, City Manager FROM: Gus Psihoyos, City Engineer DATE: June 12, 2023 RE: 2023 Asphalt Overlay Curb Ramp Project 2 Dubuque All•Merin City 2007-2012.2013 2017*2019 INTRODUCTION The enclosed resolution provides for the acceptance of the construction contract for the 2023 Asphalt Overlay Access Ramp Project 2. BACKGROUND The 2023 Asphalt Overlay Curb Ramp Project 2 provided for the replacement of twenty- four access ramps and one storm intake replacement at eight intersections in conjunction with the Public Works asphalt overlay program in following locations: Highland Park Dr. at Arbor Hills Dr., four double directional ramps. Highland Park Dr. at Castle Woods Ln., two single and one double directional ramp. Brandywine Park Dr. at Castle Woods Ln., two single directional ramps. Wilderness Rd. at Castle Woods Ln., two single directional ramps. Brandywine Park Dr, at Huntington Dr., two single directional ramps. Wilderness Rd. at Huntington Dr., two single directional ramps. Saint Anne Dr. at Flora Park Rd., two single directional ramps and one storm intake. Saint Anne Dr. at Bristol Dr., two single directional ramps DISCUSSION The 2023 Asphalt Curb Ramp Project 2 was completed by Midwest Concrete, Inc. of Peosta, Iowa in the final contract amount of $103,316.73, which is 1.63% above the original contract price of $101,661.83. The increase was due to a slight increase in quantities. RECOMMENDATION I recommend that the City Council accept the improvements and authorize the final payment of the contract amount of $103,316.73 to Midwest Concrete, Inc. for the 2023 Asphalt Overlay Curb Ramp Project 2. BUDGETIMPACT The project cost for the 2023 Asphalt Overlay Curb Ramp Project 2 is summarized below: Description Estimate Award Final Construction Contract $109,832.99 $ 101,661.83 $ 103,316.73 Contingency 10,983.30 10,983.30 0.00 Construction Administration & Inspection 18,122.44 18,122.44 15,497.51 Total Construction Cost $ 138,938.73 $ 130,767.57 $ 118,814.24 The funding is as follows: Project Fund Description Fund Amount 5421000002 Curb Ramp Program $ 118,814.24 ACTION TO BE TAKEN The City Council is requested to adopt the attached resolutions to accept the public improvements and the authorize the payment of the final contract amount of $103,316.73 to Midwest Concrete, Inc. of Peosta, IA, for the 2023 Asphalt Overlay Curb Ramp Project 2. cc: Jon Dienst, Civil Engineer II Luke Steger, Engineering Tech 2 Prepared by: Kerry Bradley, City of Dubuque Engineering,50 W. 1 V Street Dubuque, [A 52001 563 589-4270 Return to: Adreinne N. Brei#elder, City Clerk, 50W 131h Street, Dubuque, IA 52001 (563)589-4100 RESOLUTION NO. 194-23 ACCEPTING THE 2023 ASPHALT OVERLAY CURB RAMP PROJECT 2 AND AUTHORIZING THE PAYMENT TO THE CONTRACTOR WHEREAS, the public improvement contract for the 2023 Asphalt Overlay Curb Ramp Project 2 (the Project) has been completed by the Contractor, Midwest Concrete, Inc., (Contractor), the City Engineer has examined the work and recommends that the Project be accepted; and WHEREAS, the final contract amount for the Project is $103,316.73; and WHEREAS, the Contractor has previously been paid $98,150.89, leaving a balance of $5,165.84; and WHEREAS, the City Council finds that the recommendation of the City Engineer should be accepted. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: Section 1. The recommendation of the City Engineer is approved, and the Project is hereby accepted. Section 2. The Finance Director is hereby directed to pay to the Contractor the balance of the retainage of $5,165.84 as provided in Iowa Code chapter 573, and to pay such retainage in accordance with the provisions of Iowa Code chapter 573 or Iowa Code chapter 26.13. Passed, approved, and adopted this 201h day of June 2023. Attest: Adrienne N. Breitfelder, CMC City Clerk Brad . gy CrCagh, Mayor CITY ENGINEER'S CERTIFICATE OF FINAL COMPLETION OF 2023 ASPHALT OVERLAY CURB RAMP PROJECT 2 The undersigned City Engineer of the City of Dubuque, Iowa, hereby certifies that he has inspected the 2023 Asphalt Overlay Curb Ramp Project 2 has been performed in compliance with the terms of the Public Improvement Contract, and that the total cost of the completed work is $118,814.24. Dated this 12t" day of June 2023. Gus Psihoyos, City Engineer Filed in the office of the City Clerk on the 12t" day of June 2023. Adrienne N. Breitfelder, City Clerk