Force Main Stabilization Project, USACE Partnership, Request for City Betterment Copyrighted August 7, 2023 City of Dubuque Consent Items # 022. City Council Meeting ITEM TITLE: Force Main Stabilization Project, USACE Partnership, Requestfor City Betterment SUM MARY: City Manager recommending City Council grant authorization to send a letter to the U. S. Department of the Army for the U. S. Army Corps of Engineers (USACE)to include the design and repair of sanitary sewer force main joints as part of the Force Main Stabilization Project and for the mayor to execute the letter. SUGGESTED Suggested Disposition: Receive and File;Approve DISPOSITION: ATTACHMENTS: Description Type MVM Memo City Manager Memo Staff Memo Supporting Documentation Letter Supporting Documentation Dubuque THE CITY QF � All-Meriea Ciry DLT B E ; . � . � �� � � MaSt� Z�C� aYd t�Q Mt55ZSSZ Z zoa�•zoiz•�ai3 YP pp za��*zai� TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: Force Main Stabilization Project, USACE Partnership, Request for City Betterment DATE: August 2, 2023 City Engineer Gus Psihoyos is recommending City Council grant authorization to send a letter to the U. S. Department of the Army for the U. S. Army Corps of Engineers (USACE) to include the design and repair of sanitary sewer force main joints as part of the Force Main Stabilization Project and for the mayor to execute the letter. I concur with the recommendation and respectfully request Mayor and City Council approval. v Mic ael C. Van Milligen MCVM:sv Attachment cc: Crenna Brumwell, City Attorney Cori Burbach, Assistant City Manager Gus Psihoyos, City Engineer Jenny Larson, Chief Financial Officer John Klostermann, Public Works Director Teri Goodmann, Director of Strategic Partnerships Bob Schiesl, Assistant City Engineer Steve Sampson Brown, Project Manager Deron Muehring, Civil Engineer Dubuq�e THE CITY OF � All-America Ciq� Du B E .,�r.� ��K�, , �� ��, II Maste iece on the Mississi Z zoo�tzoiz-zois �P pp zoi�*zoi� TO: Michael C. Van Milligen, City Manager FROM: Gus Psihoyos, City Engineer SUBJECT: Force Main Stabilization Project, USACE Partnership, Request for City Betterment DATE: July 31, 2023 INTRODUCTION The purpose of this memorandum is to seek authorization to send a letter to the U. S. Department of the Army for the U. S. Army Corps of Engineers (USACE) to include the design and repair of sanitary sewer force main joints as part of the Force Main Stabilization Project. BACKGROUND The City's 42-inch diameter sanitary sewer force main was constructed in 1977 with approximately 3,000 feet located along the banks of the Mississippi. It carries approximately 65 percent (65%) of the City's daily average sewer flows to the Water and Resource Recovery Center. Over the years, erosion of the banks of the Mississippi have reduced the ground cover (and protection) to the point where the pipe is exposed in a few places. Because the flow is under pressure, if the force main was to be ruptured, it would result in the discharge of thousands of gallons of untreated wastewater directly into the Mississippi. In February of 2021, the City adopted Resolution 41-21 authorizing entering into an agreement with the US Department of the Army for the USACE to proceed with a planning and design analysis to identify and evaluate alternatives and a recommendation of a coordinated and implementable solution for the Force Main Stabilization Project. In March of 2022, the USACE completed its Final Feasibility Report for the Dubuque Forced Sewer Main identifying improvements to stabilize and protect the City 42-inch force main. The recommended improvements involve the placement of approximately 3,000 linear feet of riprap revetment on the eroding bank of the Mississippi to resist erosive forces and protect the City's sanitary sewer force main. Section 14 of the Flood Control Act of 1946 (Section 14) authorizes the USACE to undertake construction, repair, restoration, and modification of emergency streambank and shoreline protection projects. In March of 2022, the design and construction of the sanitary sewer Force Main Stabilization Project was approved by the Commander for Rock Island District of the USACE in accordance with a Project Partnership Agreement provided by the USACE. Per the Agreement, the estimated cost of the project is $5,216,000, with the USACE's share projected to be $3,390,400 and the City share projected to be $1,825,600. In December of 2022, the City Council adopted Resolution 368-22 authorizing the City to enter into an agreement with the US Department of the Army for the USACE to design and contract the improvements associated with the City's sanitary sewer Force Main Stabilization Project. DISCUSSION The USACE is working to complete the 65% construction plans and contract documents for the Sanitary Sewer Force Mains Stabilization Project (the "Project"). City staff members have been afforded the opportunity to review the plans and provide input. As part of that process, the condition of exposed sewer joints was discussed. The consensus was that it would be prudent to make any necessary repairs to those joints as part of the Project. However, because the sanitary sewer joint repairs fall outside the scope of the USACE work, the cost of the joint repairs would be entirely the City's responsibility. To include the joint repairs in the contract for the Sanitary Sewer Force Mains Stabilization Project, the City must make the request to the USACE. A letter has been prepared (see attachment) for the mayor's signature to make such a request. RECOMMENDATION I recommend that the City request that repair to the exposed sanitary sewer force main pipe joints be included as part of the Sanitary Sewer Force Main Stabilization Project being designed and constructed by the USACE. BUDGET IMPACT The repair of the sanitary sewer force main joints is estimated to cost approximately $50,000. Funding for the joint repairs will be from the FY23 budget appropriation in the amount of$1,933,352 for Force Main Stabilization (Project 5581500014). ACTION TO BE TAKEN I respectfully request authorization for the mayor to execute the attached letter requesting that the U.S. Department of the Army include sanitary sewer joint repairs as part of the Force Main Stabilization Project. Prepared by Deron Muehring Cc: Crenna Brumwell, City Attorney Jenny Larson, Director of Finance and Budget John Klostermann, Public Works Director Teri Goodman, Director of Strategic Partnerships Bob Schiesl, Assistant City Engineer Steve Sampson Brown, Project Manager Deron Muehring, Civil Engineer 2 Dubuque Office of the Mayor THE CITY OF bcerd City Hall All limerieaCity 50 West I36I'Street Dubuque,{A 5200I DUB E � r www.cityfbqeorg � I 2007.2012.2013 Masterpiece on the Mississippi 2017*2019 July 31, 2023 Colonel Jesse T. Curry Commander and District Engineer ATTN: Planning, Programs and Project Management Division Clock Tower Building P.O. Box 2004 Rock Island, Illinois 61204-2004 Re: Project Partnership Agreement between the Department of the Army and the City of Dubuque for the City of Dubuque Forced Sewer Main and Mississippi River Stabilization Project The City of Dubuque Forced Sewer Main and Mississippi River Stabilization Project generally involves reestablishing the section of the west bank of the Mississippi in the vicinity of the City's 42-inch diameter sanitary sewer force main that was installed circa 1977 that has become exposed at several locations due to erosion through the years. The work generally entails placing bedding/road stone back over the force main to a depth of approximately two feet and then placing revetment stone on top and down the slope to the river bottom. This letter is to request adding the repair of a limited number of the sanitary sewer joints to the project. City staff have discussed the request with U.S. Army Corps of Engineers design team. The consensus was that it would be prudent to have the joint repairs made as part of the project. The City understands that the cost of the joint repairs will be entirely the City's responsibility as it is outside the scope of the partnership agreement. Please contact Deron Muehring at dmuehrin@cityofdubuque.org or 563.599.3117 to discuss this request. Sincerely, Brad Cavanagh Service Peop€e Integrity Responsibility innovation Teamwork