Loading...
Accepting the Foothill Court Drain Tile Project 2023 Copyrighted September 5, 2023 City of Dubuque Consent Items # 019. City Council Meeting ITEM TITLE: Accepting the Foothill Court Drain Tile Project 2023 SUM MARY: City Manager recommending City Council adopt the attached resolution to accept the public improvements and the authorize the payment of the final contract amount of$63,325.52 to Temperley Excavating Company, I nc. of East Dubuque, I L, for the Foothill Court Drain Tile Project 2023. RESOLUTION Accepting the Foothill Court Drain Tile Project 2023 and Authorizing the Payment to the Contractor SUGGESTED Suggested Disposition: Receive and File;Adopt Resolution(s) DISPOSITION: ATTACHMENTS: Description Type MVM Memo City Manager Memo Staff Memo Staff Memo Resolution Resolutions Engineer's Certificate of Completion Supporting Documentation Dubuque THE CITY QF � All-Meriea Ciry DLT B E ; . � . � �� � � MaSt� Z�C� aYd t�Q Mt55ZSSZ Z zoa�•zoiz•�ai3 YP pp za��*zai� TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: Foothill Court Drain Tile Project 2023 DATE: August 29, 2023 City Engineer Gus Psihoyos is recommending City Council adopt the attached resolution to accept the public improvements and the authorize the payment of the final contract amount of $63,325.52 to Temperley Excavating Company, Inc. of East Dubuque, IL, for the Foothill Court Drain Tile Project 2023. I concur with the recommendation and respectfully request Mayor and City Council approval. v Mic ael C. Van Milligen MCVM:sv Attachment cc: Crenna Brumwell, City Attorney Cori Burbach, Assistant City Manager Gus Psihoyos, City Engineer Jon Dienst, Civil Engineer II Luke Steger, Engineering Tech Dubuque THE CITY OF � All•pn�eriea Ci� D y i/ L 4;I1�NWLQ�N:1 Fn.J.F 1 � I � I' MAste 12CE 01Z t�1e MiS81SS1 1 zoo��zoiz�zois �P pp zoi�*zoi� TO: Michael C. Van Milligen, City Manager FROM: Gus Psihoyos, City Engineer DATE: August 25, 2023 RE: Foothill Court Drain Tile Project 2023 INTRODUCTION The enclosed resolution provides for the acceptance of the construction contract for the Foothill Court Drain Tile Project 2023. BACKGROUND The Foothill Court Drain Tile Project 2023 will reduce icing and stormwater issues on Foothill Court. The project provided for or the installation of approximately 780 LF of 6- inch solid smooth wall inside drain tile and 4-inch perforated drain tile at three locations on Foothill Ct. There were 13 outlet tie-in locations to connect 6-inch solid tile with 4-inch solid tile. Additionally, approximately 360 LF of continuous curb and gutter on the south side between Pasadena Dr and Cherbourg Ct, 135 LF of curb and gutter spot repair on the upper section of Foothill Ct above Cherbourg Ct. was replaced. Sidewalk replacement occurred in impacted areas. Also, two ADA single directional sidewalk ramps were replaced to current PROWAG standards at Foothill Ct and Cherbourg Ct. Asphalt street patching was done by the City Public Works Department. DISCUSSION The Foothill Court Drain Tile Project 2023 was completed by Temperley Excavating Company, Inc. of East Dubuque, IL in the final contract amount of $63,325.52, which is 0.44% above the original contract price of $63,047.75. The increase was due to additional sidewalk. RECOMMENDATION I recommend that the City Council accept the improvements and authorize the final payment of the contract amount of $63,325.52 to Temperley Excavating Company, Inc. for the Foothill Court Drain Tile Project 2023. BUDGET IMPACT The project cost for the Foothill Court Drain Tile Project 2023 is summarized below: Description Estimate Award Final Construction Contract $ 67,067.26 $ 63,047.75 $ 63,325.52 Contingency 6,706.73 6,706.73 0.00 Construction Administration & Inspection 11,066.10 11,066.10 9,498.83 Total Construction Cost $ 84,840.08 $ 80,820.58 $ 72,824.35 The funding is as follows: Project Fund Description Fund Amount 5586500003 Drain Tile Pro ram $ 72,824.35 ACTION TO BE TAKEN The City Council is requested to adopt the attached resolutions to accept the public improvements and the authorize the payment of the final contract amount of $63,325.52 to Temperley Excavating Company, Inc. of East Dubuque, IL, for the Foothill Court Drain Tile Project 2023. cc: Jon Dienst, Civil Engineer II Luke Steger, Engineering Tech 2 Prepared by: Kerry Bradley, City of Dubuque Engineering,50 W. 13`"Street, Dubuque, IA 52001 (563)589-4270 Return to:Adreinne N.Breitfelder,City Clerk, 50W 13h Street, Dubuque, IA 52001 (563)589-4100 RESOLUTION NO. 286-23 ACCEPTING THE FOOTHILL COURT DRAIN TILE PROJECT 2023 AND AUTHORIZING THE PAYMENT TO THE CONTRACTOR WHEREAS, the public improvement contract for the Foothill Court Drain Tile Project 2023 (the Project) has been completed by the Contractor, Temperley Excavating Company, Inc., (Contractor), the City Engineer has examined the work and recommends that the Project be accepted; and WHEREAS, the final contract amount for the Project is $63,325.52; and WHEREAS, the Contractor has previously been paid $60,159.24, leaving a balance of$3,166.28; and WHEREAS, the City Council finds that the recommendation of the City Engineer should be accepted. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: Section 1. The recommendation of the City Engineer is approved, and the Project is hereby accepted. Section 2. The Finance Director is hereby directed to pay to the Contractor the balance of the retainage of$3,166.28 as provided in Iowa Code chapter 573, and to pay such retainage in accordance with the provisions of Iowa Code chapter 573 or Iowa Code chapter 26.13. Passed, approved, and adopted this 5th day of September 2023. �J. Brad--M. a , Mayor Attest: Trish L. Gleason, Assistant City Clerk CITY ENGINEER'S CERTIFICATE OF FINAL COMPLETION OF FOOTHILL COURT DRAIN TILE PROJECT 2023 The undersigned City Engineer of the City of Dubuque, lowa, hereby certifies that he has inspected the Foothill Court Drain Tile Project 2023 has been perFormed in compliance with the terms of the Public Improvement Contract, and that the total cost of the completed work is $72,824.35. Dated this 25th day of Auqust 2023. Gus Psihoyos, City Engineer Filed in the office of the City Clerk on the 25th day of August 2023. � � __� L�r�'� Trish L. Gleason, Assistant City Clerk