Accepting the 2023 Asphalt Overlay Ramp Project 4 Copyrighted September 18, 2023 City of Dubuque Consent Items # 013. City Council Meeting ITEM TITLE: Accepting the 2023 Asphalt Overlay Ramp Project4 SUM MARY: City Manager recommending City Council adopt the attached resolution to accept the public improvements and the authorize the payment of the final contract amount of$75,838.62 to Valentine Construction, Co. LLC of Dubuque, IA, for the 2023 Asphalt Overlay Curb Ramp Project 4. RESOLUTION Accepting the 2023 Asphalt Overlay Curb Ramp Project 4 and Authorizing the Payment to the Contractor SUGGESTED Suggested Disposition: Receive and File;Adopt Resolution(s) DISPOSITION: ATTACHMENTS: Description Type MVM Memo City Manager Memo Staff Memo Staff Memo Resolution Resolutions Engineer's Certificate of Completion Supporting Documentation Dubuque THE CITY QF � All-Meriea Ciry DLT B E ; . � . � �� � � MaSt� Z�C� aYd t�Q Mt55ZSSZ Z zoa�•zoiz•�ai3 YP pp za��*zai� TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: 2023 Asphalt Overlay Curb Ramp Project 4 DATE: September 12, 2023 City Engineer Gus Psihoyos is recommending City Council adopt the attached resolution to accept the public improvements and the authorize the payment of the final contract amount of $75,838.62 to Valentine Construction, Co. LLC of Dubuque, IA, for the 2023 Asphalt Overlay Curb Ramp Project 4. I concur with the recommendation and respectfully request Mayor and City Council approval. v Mic ael C. Van Milligen MCVM:sv Attachment cc: Crenna Brumwell, City Attorney Cori Burbach, Assistant City Manager Gus Psihoyos, City Engineer Jon Dienst, Civil Engineer II Luke Steger, Engineering Tech Dubuque THE CITY OF � All•pn�eriea Ci� D y i/ L 4;I1�NWLQ�N:1 Fn.J.F 1 � I � I' MAste 12CE 01Z t�1e MiS81SS1 1 zoo��zoiz�zois �P pp zoi�*zoi� TO: Michael C. Van Milligen, City Manager FROM: Gus Psihoyos, City Engineer DATE: September 11, 2023 RE: 2023 Asphalt Overlay Curb Ramp Project 4 INTRODUCTION The enclosed resolution provides for the acceptance of the construction contract for the 2023 Asphalt Overlay Access Ramp Project 4. BACKGROUND The 2023 Asphalt Overlay Ramp Project Four will provide for the replacement of fourteen (14) access ramps at 6 intersections in conjunction with the Public Works Asphalt Overlay program at the following locations: Judson Dr at Asbury Rd, two single directional ramps. Judson Dr at Vail Trail Ct, two single and one double directional ramp. Judson Dr at Powers Ct, two single directional ramps. Judson Dr at Judson Ct, two single directional ramps. Judson Dr at Sundown Ct, two single directional ramps. Judson Dr at Hillcrest Rd, two single directional ramps. DISCUSSION The 2023 Asphalt Curb Ramp Project 4 was completed by Valentine Construction, Co. LLC of Dubuque, lowa in the final contract amount of $75,838.62, which is 5.41% above the original contract price of $71,949.35. The increase was due to additional quantities encountered, including beam curb, manhole adjustments and 6" sidewalk. RECOMMENDATION I recommend that the City Council accept the improvements and authorize the final payment of the contract amount of $75,838.62 to Valentine Construction, Co. LLC for the 2023 Asphalt Overlay Curb Ramp Project 4. BUDGETIMPACT The project cost for the 2023 Asphalt Overlay Curb Ramp Project 4 is summarized below: Description Cost Estimate Award Final Construction $ 77,818.75 $ 71,949.35 $ 75,838.62 Contingency 7,781.88 7,781.88 0.00 Engineering Design and Administration 12,840.09 12,840.09 11,375.79 Total Construction Cost Estimate $ 98,440.72 $ 92,571.32 $87,214.41 The funding is as follows: Project Fund Description Fund Amount 5421000002 Curb Ramp Program $ 87,214.41 ACTION TO BE TAKEN The City Council is requested to adopt the attached resolution to accept the public improvements and the authorize the payment of the final contract amount of $75,838.62 to Valentine Construction, Co. LLC of Dubuque, IA, for the 2023 Asphalt Overlay Curb Ramp Project 4. cc: Jon Dienst, Civil Engineer II Luke Steger, Engineering Tech 2 Prepared by: Kerry Bradley,City of Dubuque Engineering,50 W. 13'Street, Dubuque, IA 52001 (563)589-4270 Return to:Adreinne N.Breitfelder, City Clerk, 50 W 13'h Street, Dubuque, IA 52001 (563)589-4100 RESOLUTION NO. 308-23 ACCEPTING THE 2023 ASPHALT OVERLAY CURB RAMP PROJECT 4 AND AUTHORIZING THE PAYMENT TO THE CONTRACTOR WHEREAS, the public improvement contract for the 2023 Asphalt Overlay Curb Ramp Project 4 (the Project) has been completed by the Contractor, Valentine Construction Co. LLC, (Contractor), the City Engineer has examined the work and recommends that the Project be accepted; and WHEREAS, the final contract amount for the Project is $75,838.62; and WHEREAS, the Contractor has previously been paid $72,046.69, leaving a balance of$3,791.93; and WHEREAS, the City Council finds that the recommendation of the City Engineer should be accepted. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: Section 1. The recommendation of the City Engineer is approved, and the Project is hereby accepted. Section 2. The Finance Director is hereby directed to pay to the Contractor the balance of the retainage of$3,791 .93 as provided in Iowa Code chapter 573, and to pay such retainage in accordance with the provisions of Iowa Code chapter 573 or Iowa Code chapter 26.13. Passed, approved and adopted this 1891 day of September, 2023. Brad M. Cavan , Mayor`- Attest: Trish L. Gleason, Assistant City Clerk CITY ENGINEER'S CERTIFICATE OF FINAL COMPLETION OF 2023 ASPHALT OVERLAY CURB RAMP PROJECT 4 The undersigned City Engineer of the City of Dubuque, lowa, hereby certifies that he has inspected the 2023 Asphalt Overlay Curb Ramp Project 4 has been performed in compliance with the terms of the Public Improvement Contract, and that the total cost of the completed work is $87,214.41. Dated this 11t" day of September 2023. Gus Psihoyos, City Engineer Filed in the office of the City Clerk on the 11 th day of September 2023. Y l _��L�Y � L' Trish L. Gleason, Assistant City Clerk