Maus Park Lake Pump Station Culvert Repair Project
Copyrighted September 18, 2023 City of Dubuque Public Hearings # 06. City Council Meeting ITEM TITLE: Maus Park Lake Pump Station Culvert Repair Project SUMMARY: Proof of Publication on notice of public hearing to considerapproving the plans, specifications, form of contract, and construction estimate of $586,000.00 for the Maus Park Lake Pump Station Culvert Repair Project and City Manager recommending approval. RESOLUTION Approval of Plans, Specifications, Form of Contract, and Estimated Cost for the Maus Park Lake Pump Station Culvert Repair Project SUGGESTED Suggested Disposition: Receive and File;Adopt Resolution(s) DISPOSITION: ATTACHMENTS: Description Type MVM Memo City Manager Memo Staff Memo Staff Memo Resolution Resolutions Dubuque THE CITY QF � All-Meriea Ciry DLT B E ; . � . � �� � � MaSt� Z�C� aYd t�Q Mt55ZSSZ Z zoa�•zoiz•�ai3 YP pp za��*zai� TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: Maus Park Lake Pump Station Culvert Repair Project Project #5586500032 DATE: September 12, 2023 City Engineer Gus Psihoyos is recommending City Council adopt the attached resolution approving the plans, specifications, form of contract, and construction estimate of $586,000.00 for the Maus Park Lake Pump Station Culvert Repair Project. The Maus Park Lake Pump Station Culvert Repair Project (Project) involves the lining of the culvert that allows stormwater runoff to pass from the Maus Lake ponding area, under a set of railroad mainline tracks, through the floodwall/levee system, into the Mississippi. Repair of the culvert involves the trenchless installation of approximately 110 lineal feet of a steel slip liner inside the existing culvert resulting in a new culvert under the railroad tracks, partially through the levee. In addition to lining the existing culvert, the work includes the construction of a permanent cofferdam and concrete apron, concrete walls, and stop log level control system on the interior side of the floodwall/levee system which will both facilitate the lining process and allow for maintenance of the culvert once complete. The City has a pending claim (ICP047008A1) into the lowa Communities Assurance Pool (ICAP) for making the permanent repairs to the culvert that will offset the City's cost to a certain extent as determined by ICAP. I concur with the recommendation and respectfully request Mayor and City Council approval. � Mic ael C. Van Milligen MCVM:sv Attachment cc: Crenna Brumwell, City Attorney Cori Burbach, Assistant City Manager Gus Psihoyos, City Engineer Deron Muehring, Civil Engineer II Jenny Larson, Chief Financial Officer Tony Breitbach, Purchasing and Risk Manager John Klostermann, Public Works Director Arielle Swift, Assistant Public Works Director Dubuque THE CITY OF � pll•America Ci� DuB E �.�K,����K�, . � � ��� � � Maste iece oYl the MisSisSi i zoo��zoiz�zoi3 �`P pp zoi�*zatg TO: Michael C. Van Milligen, City Manager FROM: Gus Psihoyos, City Engineer SUBJECT: Maus Park Lake Pump Station Culvert Repair Project Project #5586500032 DATE: September 8, 2023 INTRODUCTION The attached resolution is in reference to the public hearing for the Maus Park Lake Pump Station Culvert Repair Project. BACKGROUND Prior to the construction of the floodwall, a concrete arch culvert served to drain Maus Lake beneath what are now Canadian National (CN) mainline railroad tracks to the Mississippi River. When the floodwall was constructed, the existing arch culvert was retrofitted with sections of 48-inch reinforced concrete pipe at the upstream and downstream ends to extend the pipe. The flow line of the arch culvert was filled with concrete and formed to the radius of a 48-inch pipe. A manually operated flood gate was installed at the downstream end, and a pumping station was constructed at Maus Lake. In May 2017, ballast subsidence under the railroad tracks was discovered at the location of the culvert crossing. Further investigation revealed joint openings in the concrete arch below the tracks. The joint openings were filled with epoxy and steel plates were installed along the roof of the pipe as a temporary repair measure until a permanent solution could be developed. DISCUSSION The Maus Park Lake Pump Station Culvert Repair Project (Project) involves the lining of the culvert that allows stormwater runoff to pass from the Maus Lake ponding area, under a set of railroad mainline tracks, through the floodwall/levee system, into the Mississippi. Repair of the culvert involves the trenchless installation of approximately 110 lineal feet of a steel slip liner inside the existing culvert resulting in a new culvert under the railroad tracks, partially through the levee. In addition to lining the existing culvert, the work includes the construction of a permanent cofferdam and concrete apron, concrete walls, and stop log level control system on the interior side of the floodwall/levee system which will both facilitate the lining process and allow for maintenance of the culvert once complete. The City has a pending claim (ICP047008A1) into the lowa Communities Assurance Pool (ICAP) for making the permanent repairs to the culvert that will offset the City's cost to a certain extent as determined by ICAP. .i The estimate of probable costs for the Project is as follows: Construction Contract $586,000 Contingency 58,600 Engineering 96,700 Total Project Cost $741,300 PROJECT SCHEDULE The schedule for the Project is as follows: Initiate Public Bidding Process September 5, 2023 Publish Notice to Bidders, Advertise for Bids September 6, 2023 Publish Public Hearing Notice on Plans & Specs September 8, 2023 Public Hearing on Plans & Specifications September 18, 2023 Receipt of Bids (Bid Letting) September 26, 2023 Award Construction Contract October 2, 2023 Final Completion April 5, 2024 RECOMMENDATION I recommend approval of the plans, specifications, form of contract, and construction estimate of$586,000.00 for the Maus Park Lake Pump Station Culvert Repair Project. BUDGET IMPACT The Project is to be funded through a FY23 appropriation in the amount of $463,940 for Maus Park Culvert Restoration (Project 5586500032). Because the pump station and culvert were insured, the City submitted a claim (ICP047008A1) into the lowa Communities Assurance Pool (ICAP) for making the permanent repairs to the culvert that will offset the City's cost to a certain extent. If needed, additional funds will be used from an FY23 appropriation in the amount of $216,000 for Storm Sewer Replacements (Project 5586500001) and an FY23 appropriation in the amount of $118,500 00 for Storm Sewer Improvements/Extensions (Project 5586500020). ACTION TO BE TAKEN I respectfully request adoption of the attached resolution approving the plans, specifications, form of contract, and construction estimate of $586,000.00 for the Maus Park Lake Pump Station Culvert Repair Project through the adoption of the attached resolution. Attach. Prepared by Deron Muehring cc: Crenna Brumwell, City Attorney Jenny Larson, Chief Financial Officer Tony Breitbach, Purchasing and Risk Manager John Klostermann, Public Works Director Arielle Swift, Assistant Public Works Director Deron Muehring, Civil Engineer II 2 Prepared by Deron Muehrinq City of Dubuque Engineering 50 W 131m St Dubuque, Iowa 52001 (5631589-4270 Return to Adrienne N.Breitfelder City of Dubuque City Clerk 50 W 13th St Dubuque, Iowa 52001 (563)589-4100 RESOLUTION NO. 313-23 APPROVAL OF PLANS, SPECIFICATIONS, FORM OF CONTRACT, AND ESTIMATED COST FOR THE MAUS PARK LAKE PUMP STATION CULVERT REPAIR PROJECT NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: That the proposed plans, specifications, form of contract and estimated cost for the Maus Park Lake Pump Station Culvert Repair Project in the estimated amount of $586,000.00, are hereby approved. Passed, adopted, and approved this 18th day of September 2023. radM. Gav•n , Mayor Attest: Trish L. Gleason, Assistant City Clerk 0 STATE OF IOWA SS: DUBUQUE COUNTY CERTIFICATE OF PUBLICATION I, Kathy Goetzinger, a Billing Clerk for Woodward Communications, Inc., an Iowa corporation, publisher of the Telegraph Herald, a newspaper of general circulation published in the City of Dubuque, County of Dubuque and State of Iowa; hereby certify that the attached notice was published in said newspaper on the following dates: 09/08/2023 and for which the charge is 42.50 at-i76 izAeLt___ Subscribed to b fore m , a Notary Pu Vic in and for Dubuque County, Iowa, this 8th day of September, 2023 Notary Pub in and for Dubuque County, Iowa. �p1A[ JANET K. PAPE 7 Commission Number 199659 My Commission Expires 12/11/2025 Ad text : CITY OF DUBUQUE, IOWA OFFICIAL NOTICE NOTICE OF PUBLIC HEARING ON PLANS, SPECIFICATIONS, FORM OF CONTRACT, AND ESTIMATED COST FOR THE MAUS PARK LAKE PUMP STATION CULVERT REPAIR PROJECT NOTICE IS HEREBY GIVEN: The City Council of the City of Dubuque, Iowa will hold a public hearing on the proposed plans, specifications, form of contract and estimated cost for the Maus Park Lake Pump Station Culvert Repair Project, in accordance with the provisions of Chapter 26, Code of Iowa, at 6:30 p,m., on the 18th day of September 2023, in the Historic Federal Building Council Chambers (second floor), 350 West 6th Street, Dubuque, Iowa. Said proposed plans, specifications, form of contract and estimated cost are now on file in the office of the City Engineer. At said hearing any interested person may appear and file objections thereto. The scope of the Project is as follows: Project consists of the construction of permanent cofferdam and concrete apron, concrete walls and stop log level control, trenchless installation of approximately 110 lineal feet of segmental steel slip liner with pressure grouted annular space. At the meeting, the City Council will receive oral and written comments from any resident or property owner of said City on the above action. The official agenda will be posted the Friday before the meeting and will contain public input options. The City Council agenda can be accessed at https://cityofdubuque.novusagenda.com/AgendaPublic/ Written comments regarding the above public hearings may be submitted to the City Clerk's Office via email at ctyclerk©cityofdubuque.org or by mail to City Clerk's Office, City Hall, 50 W.'13th St., Dubuque, IA 52001, or by contacting the City Clerks Office at 563=589=4100 before said time of public hearing. At the said time and place of public hearings the City Council will receive any written comments. Copies of supporting documents for the public hearings are on file in the City Clerk's Office and may be viewed Monday through Friday between 8:00 a.m. and 5:00 p.m, Individuals with limited English proficiency, vision, hearing, or speech impairments requiring special assistance should contact the City Clerk's Office at (563) 589-4100, ctyclerk@cityofdubuque.org as soon as feasible. Deaf or hard -of -hearing individuals can use Relay Iowa by dialing 711 or (800) 735-2942. ' Trish L. Gleason, Assistant City Clerk It 9/8