Award Maus Park Lake Pump Station Culvert Repair Project Copyrighted October 2, 2023 City of Dubuque Consent Items # 06. City Council Meeting ITEM TITLE: Award Maus Park Lake Pump Station Culvert Repair Project SUM MARY: City Manager recommending City Council adopt the resolution awarding the Public I mprovement Construction Contract for the Maus Park Lake Pump Station Culvert Repair Project in the amount of$525,172.00 to Tschiggfrie Excavating. RESOLUTION Awarding the Public I mprovement Construction Contract for the Maus Park Lake Pump Station Culvert Repair Project SUGGESTED Suggested Disposition: Receive and File;Adopt Resolution(s) DISPOSITION: ATTACHMENTS: Description Type MVM Memo City Manager Memo Staff Memo Staff Memo Resolution Resolutions Dubuque THE CITY QF � All-Meriea Ciry DLT B E ; . � . � �� � � MaSt� Z�C� aYd t�Q Mt55ZSSZ Z zoa�•zoiz•�ai3 YP pp za��*zai� TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: Maus Park Lake Pump Station Culvert Repair Project Award Public Improvement Construction Contract Project Code: 5586500032 DATE: September 27, 2023 Assistant City Engineer Robert Schiesl is recommending City Council adopt the attached resolution awarding the Public Improvement Construction Contract for the Maus Park Lake Pump Station Culvert Repair Project in the amount of $525,172.00 to Tschiggfrie Excavating. The Maus Park Lake Pump Station Culvert Repair Project (Project) involves the lining of the culvert that allows stormwater runoff to pass from the Maus Lake ponding area, under a set of railroad mainline tracks, through the floodwall/levee system, into the Mississippi. Repair of the culvert involves the trenchless installation of approximately 110 lineal feet of a steel slip liner inside the existing culvert resulting in a new culvert under the railroad tracks, partially through the levee. In addition to lining the existing culvert, the work includes the construction of a permanent cofferdam and concrete apron, concrete walls, and stop log level control system on the interior side of the floodwall/levee system which will both facilitate the lining process and allow for maintenance of the culvert once complete. I concur with the recommendation and respectfully request Mayor and City Council approval. v Mic ael C. Van Milligen MCVM:sv Attachment cc: Crenna Brumwell, City Attorney Cori Burbach, Assistant City Manager Gus Psihoyos, City Engineer Robert Schiesl, Assistant City Engineer Deron Muehring, Civil Engineer II Dubuque THE CITY OF � pll•America Ci� DuB E �.�K,����K�, . � � ��� � � Maste iece oYl the MisSisSi i zoo��zoiz�zoi3 �`P pp zoi�*zatg TO: Michael C. Van Milligen, City Manager FROM: Robert Schiesl, Assistant City Engineer SUBJECT: Maus Park Lake Pump Station Culvert Repair Project Award Public Improvement Construction Contract Project Code: 5586500032 DATE: September 27, 2023 INTRODUCTION The purpose of the memorandum is to recommend awarding the Public Improvement Construction Contract for the Maus Park Lake Pump Station Culvert Repair Project. BACKGROUND Prior to the construction of the floodwall, a concrete arch culvert served to drain Maus Lake beneath what are now Canadian National (CN) mainline railroad tracks to the Mississippi River. When the floodwall was constructed, the existing arch culvert was retrofitted with sections of 48-inch reinforced concrete pipe at the upstream and downstream ends to extend the pipe. The flow line of the arch culvert was filled with concrete and formed to the radius of a 48-inch pipe. A manually operated flood gate was installed at the downstream end, and a pumping station was constructed at Maus Lake. In May 2017, ballast subsidence under the railroad tracks was discovered at the location of the culvert crossing. Further investigation revealed joint openings in the concrete arch below the tracks. The joint openings were filled with epoxy and steel plates were installed along the roof of the pipe as a temporary repair measure until a permanent solution could be developed. The Maus Park Lake Pump Station Culvert Repair Project (Project) involves the lining of the culvert that allows stormwater runoff to pass from the Maus Lake ponding area, under a set of railroad mainline tracks, through the floodwall/levee system, into the Mississippi. Repair of the culvert involves the trenchless installation of approximately 110 lineal feet of a steel slip liner inside the existing culvert resulting in a new culvert under the railroad tracks, partially through the levee. In addition to lining the existing culvert, the work includes the construction of a permanent cofferdam and concrete apron, concrete walls, and stop log level control system on the interior side of the floodwall/levee system which will both facilitate the lining process and allow for maintenance of the culvert once complete. DISCUSSION Sealed bids for the Maus Park Lake Pump Station Culvert Repair Project were received and publicly opened on September 26, 2023. Tschiggfrie Excavating of Dubuque, lowa .i submitted the low bid in the amount of$525,172.00, which is 10.38% below the estimate of probable cost. A summary of the bid proposals received is as follows: Bidder Bid Amount Tschiggfrie Excavating $ 525,172.00 Engineering & Construction Innovations $ 669,995.00 Jim Schroeder Construction $ 686,000.00 Tricon General Construction $ 870,000.00 RECOMMENDATION I recommend awarding the Public Improvement Construction Contract for the Maus Park Lake Pump Station Culvert Repair Project in the amount of $525,172.00 to Tschiggfrie Excavating. BUDGET IMPACT The estimate of probable cost for the Maus Park Lake Pump Station Culvert Repair Project is as follows: Description Estimate Award Construction Contract $ 586,000.00 $ 525,172.00 Contingency 58,600.00 52,500.00 Engineering Design Services 67,300.00 67,300.00 Contract Admin / Construction Engineering 29,400.00 29,400.00 Total Project Cost $ 741,300.00 $ 674,372.00 The current project funding summary is as follows: Project Funding Source Amount Code 5586500032 Maus Park Culvert Restoration $ 463,940.00 5586500001 Storm Sewer Replacements 142,432.00 ��> 5586500020 Storm Sewer Improvements/Extensions 68,000.00 ��> Total Project Funding $ 674,372.00 (1) Funding if needed pending the outcome of insurance claim The Project is to be funded through a FY23 appropriation in the amount of $463,940 for Maus Park Culvert Restoration (Project 5586500032). Because the pump station and culvert were insured, the City submitted a claim (ICP047008A1) to the lowa Communities Assurance Pool (ICAP) for making permanent repairs to the culvert that will offset the City's cost. Pending the outcome of the claim, additional funds if needed will come from an FY23 appropriation in the amount of$216,000 for Storm Sewer Replacements (Project 5586500001) and an FY23 appropriation in the amount of $118,500.00 for Storm Sewer Improvements/Extensions (Project 5586500020). L ACTION TO BE TAKEN I respectfully request adoption of the attached resolution awarding the Public Improvement Construction Contract for the Maus Park Lake Pump Station Culvert Repair Project in the amount of $525,172.00 to Tschiggfrie Excavating. Attach. Prepared by Deron Muehring cc: Crenna Brumwell, City Attorney Jenny Larson, Chief Financial Officer Tony Breitbach, Purchasing and Risk Manager John Klostermann, Public Works Director Arielle Swift, Assistant Public Works Director Deron Muehring, Civil Engineer II 3 Prepared by Deron Muehring City of Dubuque Engineering 50 W 13'h St Dubuque, Iowa 52001 (563)589-4270 Return to Adrienne N. Breitfelder City of Dubuque City Clerk 50 W 13'h St Dubuque, Iowa 52001 (563)589-4100 RESOLUTION NO. 324-23 AWARDING THE PUBLIC IMPROVEMENT CONSTRUCTION CONTRACT FOR THE MAUS PARK LAKE PUMP STATION CULVERT REPAIR PROJECT WHEREAS, sealed proposals have been submitted by contractors for the Maus Park Lake Pump Station Culvert Repair Project (the Project) pursuant to Resolution No. 291-23 and Notice to Bidders published on the City of Dubuque, Iowa website and plan room service with statewide circulation on the 6th day of September 2023; and WHEREAS, said sealed proposals were opened and read on the 26th day of September 2023 and it has been determined that Tschiggfrie Excavating, Co. of Dubuque Iowa, with a low bid in the amount of $525,172.00 is the lowest responsive, responsible bidder for the Project. NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: SECTION 1. That a Public Improvement Contract for the Project is hereby awarded to Tschiggfrie Excavating Co. and the City Manager is hereby directed to execute a Public Improvement Contract on behalf of the City of Dubuque for the Project. Passed, approved, and adopted this 2nd day of October 2023. Attest: Brad M. , Mayor Trish L. Gleason, Assistant City Clerk