Althauser St. Retaining Wall Repair Project Copyrighted October 16, 2023 City of Dubuque Consent Items # 021. City Council Meeting ITEM TITLE: Althauser St. Retaining Wall Repair Project SUMMARY: City Manager recommending City Council award the Public Improvement Construction Contract for the Althauser St. Retaining Wall Repair Project to Tschiggfrie Excavating Co. in the low bid amount of$144,004.50. RESOLUTIONAwarding Public ImprovementConstruction Contractfor the Althauser St. Retaining Wall Repair Project SUGGESTED Suggested Disposition: Receive and File;Adopt Resolution(s) DISPOSITION: ATTACHMENTS: Description Type MVM Memo City Manager Memo Staff Memo Staff Memo Resolution Resolutions Dubuque THE CITY QF � All-Meriea Ciry DLT B E ; . � . � �� � � MaSt� Z�C� aYd t�Q Mt55ZSSZ Z zoa�•zoiz•�ai3 YP pp za��*zai� TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: Althauser St. Retaining Wall Repair Project DATE: October 9, 2023 City Engineer Gus Psihoyos is recommending City Council award the Public Improvement Construction Contract for the Althauser St. Retaining Wall Repair Project to Tschiggfrie Excavating Co. in the low bid amount of $144,004.50. This Althauser St. Retaining Wall Repair Project involves the reconstruction of an existing concrete/stone retaining wall near 902 Althauser Street. The project includes a new 80 cubic yard reinforced concrete retaining wall with a textured face, HMA street pavement and PCC driveway pavement. There is a small amount of chain link fence to be removed and replaced in the yard below the retaining wall. All disturbed turf is to be seeded. I concur with the recommendation and respectfully request Mayor and City Council approval. � Mic ael C. Van Milligen MCVM:sv Attachment cc: Crenna Brumwell, City Attorney Cori Burbach, Assistant City Manager Gus Psihoyos, City Engineer Jon Dienst, Civil Engineer II John Klostermann, Public Works Director Dubuque THE CITY OF � All•Ameriea Ciq DU B E .,�{��� :,�� ,. , � ��,, I I Maste 12C2 OYl t�le M1SS1551 1 zao�•zoiz•zai3 � pp zoi�*zoi� TO: Michael C. Van Milligen, City Manager FROM: Gus Psihoyos, City Engineer DATE: October 6, 2023 RE: Althauser St. Retaining Wall Repair Project INTRODUCTION The purpose of this memorandum is to provide the City Council with information related to the recommendation for awarding the Public Improvement Construction Contract for the Althauser St. Retaining Wall Repair Project. DISCUSSION This Althauser St. Retaining Wall Repair Project involves the reconstruction of an existing concrete/stone retaining wall near 902 Althauser Street. The project includes a new 80 cubic yard reinforced concrete retaining wall with a textured face, HMA street pavement and PCC driveway pavement. There is a small amount of chain link fence to be removed and replaced in the yard below the retaining wall. All disturbed turF is to be seeded. BID RESULTS Through the competitive bid process, the City received sealed bids on September 28, 2023, for the Althauser St. Retaining Wall Repair Project. Tschiggfrie Excavating Co. of Dubuque, IA, submitted the low bid in the amount of $144,004.50 which is 0.20% below the engineer's estimate. A summary of the bid proposals received is as follows: Contractor Name Total Bid Tschiggfrie Excavating Co. $ 144,004.50 McDermott Excavating $ 156,474.00 Eastern lowa Excavating & Concrete LLC $ 205,219.50 RECOMMENDATION I recommend awarding the construction contract for the Althauser St. Retaining Wall Repair Project to Tschiggfrie Excavating Co. in the low bid amount of$144,004.50. BUDGET IMPACT The estimate of probable cost for the Althauser St. Retaining Wall Repair Project is summarized in the following table as follows: Description Cost Estimate Award Construction $ 144,295.00 $ 144,004.50 Contingency 14,429.50 14,429.50 Engineering Design and Administration 23,808.68 23,808.68 Total Construction Cost Estimate $ 182,533.18 $ 182,242.68 The proposed project funding is summarized as follows: Pro'ect No. Fund Description Fund Amount 5524000003 Stone Retaining Walls $ 182,242.68 ACTION TO BE TAKEN In accordance with lowa Code Section 380.4, I respectfully request that the City Council award the Public Improvement Construction Contract for the Althauser St. Retaining Wall Repair Project to Tschiggfrie Excavating, Co. through the adoption of the attached resolution. cc: John Klostermann, Public Works Director Jon Dienst, Civil Engineer II 2 Prepared by Kerry Bradley,City of Dubuque Engineering,50 W. 13th St. Dubuque, IA 52001 (563)589-4270 Return to Adrienne N. Breitfelder City C4erk City of Dubuque, 50 W. 13th St.Dubuque, IA 52001 (563)589-4100 RESOLUTION NO. 339-23 AWARDING PUBLIC IMPROVEMENT CONSTRUCTION CONTRACT FOR THE ALTHAUSER ST. RETAINING WALL REPAIR PROJECT Whereas, sealed proposals have been submitted by contractors for the Althauser St. Retaining Wall Repair Project, (the Project) and Notice to Bidders published on the City of Dubuque, Iowa website and plan room service with statewide circulation on the 14th day of September 2023. Whereas, said sealed proposals were opened and read on the 28th day of September 2023 and it has been determined that Tschiggfrie Excavating, Co. of Dubuque, IA submitted the low bid in the amount of $144,004.50, and is the lowest responsive, responsible bidder for the Project. NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: Section 1. That a Public Improvement Construction Contract for the Project is hereby awarded to Tschiggfrie Excavating, Co. and the City Manager is hereby directed to execute a Public Improvement Construction Contract on behalf of the City of Dubuque for the Project. Passed, adopted, and approved this 16th day of October 2023. Bad M. C,iav�nagh, Mayor Attest: Trish L. Gleason, Assistant City Clerk