Loading...
Signed Contract_Tschiggfrie Excavating Change Order No. 2 for the Burlington Water Main Improvement ProjectCity of Dubuque City Council Meeting Consent Items # 021. Copyrighted December 4, 2023 ITEM TITLE: Signed Contract(s) SUMMARY: Tschiggfrie Excavating Change Order No. 2 for the Burlington Water Main Improvements project. SUGGESTED Suggested Disposition: Receive and File DISPOSITION: ATTACHMENTS: Description Type Burlington Water Main Improvements project Supporting Documentation THE CITY OF DUB E Masterpiece on the Mississippi To: Tschiggfrie Excavating 425 Julien Dubuque Dr. Dubuque, IA 52003 City of Dubuque Water Department 1902 Hawthorne St. Dubuque, IA 52001 (563) 589-4291 Change Order Form CHANGE ORDER NO: 2 ISSUE DATE: 11/21/2023 PROJECT NAME: Burlington Water Main Improvements PROJECT No: 9337.00 Jurisdictional Representative: Name and Address Chris Lester Water Department Director City of Dubuque 1902 Hawthorne Street Dubuque, IA. 52001 Contractor Representative: (Name and Address) Ben Kramer Tschiggfrie Excavating 425 Julien Dubuque Drive Dubuque, IA 52003 The Contract is chanaed as follows: Initiated By: Owner X Contractor Engineer Change Order No: 2 Change Order Date: 10/30/2023 Original Conract Amount: $ 312,252.00 Previous Change Orders: $ 9,341.60 Current Change Order: $ 17,337.29 New Contract Amount: $ 338,930.89 Adjustment made to CIP Number(s): 610-55-5510-80-815-5501-00-01-67990 The work includes two spot repairs on existing 8" sanitary sewer main. Two 4" service lines were also replaced. See attached Table for a cost breakdown Total Dollar Amount of this Change Order: $ 17, 337.29 This Change Order is not Valid Until Signed by Owner and Contractor Recommended T I—� P.E. / Project Manaaer Engineer - Name/Title Approved d^Al hLA Contractor Representative - Name/Title 11/21/2023 Date 11 /21 /2023 Date I ZI,rk,4 1/0-- �1� City Manager 11/27/2023 Jurisdiction I Representative - NamV/ Title Date Page 1 of 1 Change Order 2 - Sanitary Spot Repairs Item Description Quantity I Unit I Unit Cost I Amount Subbase, Modified Subbase - Gradation 14 27 TON $19.00 $513.00 Bedding Material, 1" Commercial Clean Stone 11.6 TON $26.00 $301.60 Replacement of Unsuitable Backfill Material Gradation 12a 229.7 TON $17.00 $3,904.90 Sanitary Sewer Gravity Main, Trenched 8" 16.9 LF $48.00 $811.20 Sanitary Sewer Service Point Repair 2 EA $4,300.00 $8,600.00 Sanitary Sewer Gravity Main, Trenched 4" Service/Connection 4.5 LF $76.00 $342.00 Sanitary Sewer Service Wye 8"A" 2 EA $630.00 $1,260.00 HMA Pavement by TON 10 TON $130.00 $1,300.00 Pavement - Removal 42.9 SY $7.10 $304.59 Total $17,337.29