Loading...
Update: 3000 Jackson Street, H&W BuildingCity of Dubuque City Council Meeting Action Items # 01. Copyrighted December 4, 2023 ITEM TITLE: Update: 3000 Jackson Street, H&W Building SUMMARY: City Manager is providing an update on the H & W project at 3000 Jackson Street. SUGGESTED Suggested Disposition: Receive and File DISPOSITION: ATTACHMENTS: Description MVM Memo Staff Memo - Update Type City Manager Memo Staff Memo THE C DUj!BQTE Masterpiece on the Mississippi TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: 3000 Jackson H & W Building Update DATE: November 30, 2023 Dubuque WAWca 914 ii 2007-2012.2013 2017*2019 Housing & Community Development Director Alexis Steger is providing an update on the H & W project at 3000 Jackson Street. Mic ael C. Van Milligen u[yTlui�i Attachment cc: Crenna Brumwell, City Attorney Cori Burbach, Assistant City Manager Alexis Steger, Housing and Community Development Director Jill Connors, Economic Development Director Wally Wernimont, Planning Services Director Michael Belmont, Asst. Housing & Comm Development Director Dubuque THE CITY OF All -America My nni K xvni , nz: a:u�ir, DUB E 2007-2012.2013 Masterpiece on the Mississippi 2017*2019 TO: Michael C. Van Milligen, City Manager Economic Development Department 1300 Main Street Dubuque, Iowa 52001-4763 Office (563) 589-4393 TTY (563) 690-6678 http://www.cityofdubuque.org FROM: Alexis M. Steger, Housing and Community Development Director SUBJECT: 3000 Jackson H & W Building Update DATE: November 30, 2023 INTRODUCTION This memorandum provides a status update on the H & W project at 3000 Jackson Street. BACKGROUND November 16, 2023 staff presented a memo to update the City Council providing the following information: Zinser has removed the south wall of the building that was an area of concern. After removal of this wall and some of the roofing elements, Zinser stopped construction due to concern that the building would become too unstable if they removed the roof and parapets. Zinser required an engineered bracing of the building be provided prior to any further deconstruction. The owner has an engineer working on this bracing system currently. The city does not want further deconstruction to continue until all parties have reviewed the bracing system and agreed that deconstruction efforts can continue. This includes a review by WHKS & Co hired by the city. The fall zone (road closure area) remains an area of danger to the public until the building can be stabilized, deconstructed in some areas, and then reviewed by a structural engineer to deem the building safe for the public. December 3, 2023, will mark 180 days since the first demolition/repair order was issued. If the city does not agree to provide the owner with any additional time to complete the demolition work, the city would have the ability to move forward with the demolition work. The cost would be assessed back to the property; however, the city would bear the cost of demolition until that assessment was paid. Per Iowa Code 364.12: "a city may perform the required action and assess the costs against the property for collection in the same manner as property tax" DISCUSSION The bracing plans expected to be delivered to the City of Dubuque for review were not received. The engineer from McClure was contacted directly and the following information was provided during a phone conversation on November 30, 2023: I spoke with Patrick Earney of McClure Engineering today regarding the ongoing stabilization efforts for the Dubuque Brewing and Malting Building... He conveyed that they are finalizing design of a bracing and consolidation system for the east facing wall behind the towers. He indicated that he expects to have a submittal ready in a couple of weeks (Dec 15th) Additionally, he informed me that he reviewed the condition and directed the installation of temporary shoring for the lintel on Jackson street. 1 (Mike Belmont) expressed my concern with the wood bearing blocks that were placed at the base of the temporary columns, and Patrick indicated that he would direct Steve Emerson to remove the wood blocking. 1 have requested that he provide an email stating what he has been tasked to do and where he is at in the process so that we have this information in his words. Based on this update, city staff requested the Steve Emerson (owner) and McClure attend a meeting with WHKS on December 1st to discuss options for speeding up the process. More information will be available for City Council on Monday, December 4, 2023. RECOMMENDATION This memo is for information only. CC: Jill Connors; Economic Development Director Wally Wernimont, City Planner Michael Belmont, Asst. Housing & Comm Development Director 2 1 Adrienne Breitfelder From:Patrick Earney <pearney@mcclurevision.com> Sent:Monday, December 4, 2023 4:49 PM To:Michael Belmont; sle@aspectinc.net Subject:RE: Updates Caution! This message was sent from outside your organization. Block sender Michael and Stephen, McClure engineering has been engaged by 3000 Jackson, LLC to provide engineering services for the stabilization and restoration of the structure at the same address. We have directed the recent selective demolition to remove unstable portions of the exterior façade, and we have directed the installation of the temporary supports at the large opening on the west façade where the header has deflected vertically. We understand that this bracing is currently resting on a horizontal wood plate which could allow for some crushing. This plate will be removed soon so that the added supports (inside and out) will bear directly on masonry. McClure Engineering is currently working on developing a system to provide lateral support for the southwest corner of 3000 Jackson St. We are currently designing some compression bracing for the existing masonry shear wall highlighted in the snip below. Further, we are designing diagonal bracing for the frame one bay to the east of the wall to further stabilize this wing and prevent some twisting that was observed. This bracing will provide a longer-term stabilization to the observed distress in this area of the structure. Respectfully, PATRICK EARNEY, P.E.*, S.E.** PROJECT MANAGER Your vision. Engineered here. 2001 W Broadway | Columbia, MO 65203 D: (573) 234-2647 | O: (573) 814-1568 ext. 2229 | C: (573) 268-2615 *AL, CA, CT, FL, IA, IN, MI, MO, NJ, OH, PA, SC, SD, TX **CA, DC, IL, MA, NC, NE, OK, OR, VT, WA From: Michael Belmont <Mbelmont@cityofdubuque.org> Sent: Thursday, November 30, 2023 11:04 AM To: Patrick Earney <pearney@mcclurevision.com> Subject: RE: Updates Patrick, 2 Can you provide something in writing (can be in an email) indicating what you have been asked to design, and where you are at in the process. Per our conversation, can you also note that you have analyzed and directed the temporary bracing for the lintel along Jackson Street and indicate if it has been installed per your direction. Please include in this narrative your intent to request that the timber bearing blocks be removed/replaced. Also, I would like to set up a conference call with our engineering consultant, Michael Shimkus from WHKS, so that he can ask questions to you directly. As I mentioned on the phone, we are trying to get to a point where we can all have confidence that the building has been stabilized and that the danger to the public has been mitigated. Thanks, Michael Belmont Assistant Director, Building Code Official Housing and Community Development City of Dubuque Office: 563 690 6087 mbelmont@cityofdubuque.org Federal Building I 350 W. 6th St. Dubuque IA, 52001 From: Patrick Earney <pearney@mcclurevision.com> Sent: Wednesday, November 29, 2023 4:27 PM To: Michael Belmont <Mbelmont@cityofdubuque.org> Cc: Steve Emerson <sle@aspectinc.net>; Alexis Steger <Asteger@cityofdubuque.org> Subject: RE: Updates sophospsmartbannerend Michael, I saw that you called. I’m working towards another deadline today, but I will call you tomorrow morning. Regards, 3 PATRICK EARNEY, P.E.*, S.E.** PROJECT MANAGER Your vision. Engineered here. 2001 W Broadway | Columbia, MO 65203 D: (573) 234-2647 | O: (573) 814-1568 ext. 2229 | C: (573) 268-2615 *AL, CA, CT, FL, IA, IN, MI, MO, NJ, OH, PA, SC, SD, TX **CA, DC, IL, MA, NC, NE, OK, OR, VT, WA From: Steve Emerson <sle@aspectinc.net> Sent: Wednesday, November 29, 2023 3:28 PM To: Alexis Steger <Asteger@cityofdubuque.org> Cc: Michael Belmont <Mbelmont@cityofdubuque.org>; Patrick Earney <pearney@mcclurevision.com> Subject: Re: Updates Yes. Michael. Please reach out to Patrick directly. I was thinking you already had his contact. I pasted it below and copied him on this email PATRICK EARNEY, P.E.*, S.E.** PROJECT MANAGER Your vision. Engineered here. 2001 W Broadway | Columbia, MO 65203 D: (573) 234-2647 | O: (573) 814-1568 ext. 2229 | C: (573) 268-2615 *AL, CA, CT, FL, IA, IN, MI, MO, NJ, OH, PA, SC, SD, TX **CA, DC, IL, MA, NC, NE, OK, OR, VT, WA SLE On Nov 29, 2023, at 1:00 PM, Alexis Steger <Asteger@cityofdubuque.org> wrote: Can you provide the contact information for the Engineer that is working on these? It may be easier to have Mike Belmont talk to them about what is coming to be able to provide that update to the City Council. Thank you, Alexis From: Steve Emerson <sle@aspectinc.net> Sent: Wednesday, November 29, 2023 12:58 PM To: Alexis Steger <Asteger@cityofdubuque.org> Cc: Michael Belmont <Mbelmont@cityofdubuque.org> Subject: Re: Updates sophospsmartbannerend I have communicated this to the engineer. They tell me they are doing their internal review to the calculations and resolves. I am told I should have them right away and reach out to them morning and night. As soon as i have them I will forward them on. 4 SLE On Nov 29, 2023, at 12:47 PM, Alexis Steger <Asteger@cityofdubuque.org> wrote: Steve, We were expecting the engineer’s information on the bracing system for 3000 Jackson Street last week, before the Holiday break. We have not seen the information transmitted to us and we need an update from you on the timeline/delay. Mike Belmont has called you to get an update and hasn’t received any return calls. It is imperative that we hear from you today. Thank you, Alexis M. Steger Housing & Comm Development Director City of Dubuque 563.589.4230