Loading...
Signed Contract_Top Grade Excavating, Inc. for the Old Highway Road Water Main Connection LoopCity of Dubuque City Council Meeting Consent Items # 019. Copyrighted December 18, 2023 ITEM TITLE: Signed Contract(s) SUMMARY: MSA Professional Services, Inc for the Creek Crossing Restoration; Origin Design Co. for the Old Highway Road Water Main Connection Loop; Top Grade Excavating, Inc. for the Old Highway Road Water Main Connection Loop; Tschiggfrie Excavating for the Burlington Water Main I mprovements. SUGGESTED Suggested Disposition: Receive and File DISPOSITION: ATTACHMENTS: Description Type Creek Crossing Restoration Supporting Documentation Old Highway Road Water Main Connection Loop Supporting Documentation Old Highway Road Water Main Connection Loop -Top Supporting Documentation Grade Excavating Burlington Water Main Improvements Supporting Documentation CHANGE ORDER Change Order No: 2 Final Date: October 31, 2023 Agreement Date: June 20, 2023 Owner: City of Dubuque Project: Old Highway Road Water Main Connection Loop No. 23059 Contractor: Tob Grade Excavatiniz_ Inc. Description of Change: Contract adjustment based on total quantities of work performed (see attached) ($29,961.09) TOTAL CHANGE ORDER NO. 2 FINAL ($29,961.09) Justification for Change: Contract reduction based on measurements of installed quantities. Change in Contract Price: The amount of the contract will be DECREASED by this change order by the sum of Twenty -Nine Thousand Nine Hundred Sixty -One Dollars and Nine Cents ($ 29,961.09) Adjustment in Amount of Contract: 1. Amount of Original Contract $ 697,604.00 2. Net due to all previous change orders $ 6,228.40 3. Amount of contract not including this change order $ 703,832.40 4. Reduction to contract due to this change order $ (29,961.09) 5. Amount of contract including this change order $ 673,871.31 Change Order Conditions: The contract completion period established by the original contract and previous change orders will remain unchanged. The final completion date is October 31, 2023. Work performed under this change order will be subject to all the requirements as stated herein and in the contract documents and all change orders. The Contractor expressly agrees that he will place under coverage of his Contractor's Improvement Bond and insurance all work covered by this change order. All work performed under this change order shall be performed in accordance with the requirements of this change order, the plans, the specifications, and the contract documents. City of Dubuque Old Highway Road Water Main Connection Loop Change Order No. 2 FINAL Recommended for Acceptance: ORIGIN DESIGN CO. Page 2 Thereby certify that this engineering document was prepared by me or o/V under my direct personal supervision and that I am a duly licensed Professional Engineer under the laws of the State of Iowa. ZU 60 '-�- MARC 0. 0 FOR ORIGIN DESIGN CO. Z RUDEN 19249 5 11/9/20223 Marc Ruden, P.E. Date 10WA License Number 19249 My license renewal date is December 31, 2024 Pages or sheets covered by this seal: Change Order No. 2 FINAL Accepted and/or Requested: CONTRACTOR TOP RI -A NAME Jason Vorwald TITLE Vice President EXCAVATING DATE I/ - /a - Z0 2- Signature Accepted and/or Requested: OWNER CITY OF DUBUQUE, IOWA BY Sig ature NAME: Michael Van Milligen TITLE: City Manager DATE: 12/07/2023 THE CITY OF DUB E Masterpiece on the Mississippi To: Tschiggfrie Excavating 425 Julien Dubuque Dr. Dubuque, IA 52003 City of Dubuque Water Department 1902 Hawthorne St. Dubuque, IA 52001 (563) 589-4291 Change Order Form CHANGE ORDER NO: 3 ISSUE DATE: 11/27/2023 PROJECT NAME: Burlington Water Main Improvements PROJECT No: 9337.00 Jurisdictional Representative: Name and Address Chris Lester Water Department Director City of Dubuque 1902 Hawthorne Street Dubuque, IA. 52001 Contractor Representative: (Name and Address) Ben Kramer Tschiggfrie Excavating 425 Julien Dubuque Drive Dubuque, IA 52003 The Contract is chanaed as follows: Initiated By: Owner X Contractor Engineer Change Order No: 3 Change Order Date: 9/28/23 - 11/7/23 Original Conract Amount: $ 312,252.00 Previous Change Orders: $ 26,678.89 Current Change Order: $ 5,767.60 New Contract Amount: $ 344,698.49 Adjustment made to CIP Number(s): 601-42-0000-81-810-4270-00-01-67990 This change order includes additional work performed throughout the duration of the project. An itemized list of the work is included on the attached sheet. Total Dollar Amount of this Change Order: $ This Change Order is not Valid Until Signed by Owner and Contractor 5,767.60 Recommended T I1 �� P.E. /Project Manager 11/27/2023 Engineer - Name/Title Date Approved Project Manager 11/27/2023 Contractor Representative - Name/Title Date Approved k��' 436�-� City Manager 12/04/2023 Jurisdictional Repr sentative - Name / Titl-e Date Page 1 of 1 Change Order 3 - Additional Water Distrubution Construction Services Item Description Date Performed I Quantity I Unit Unit Cost I Amount Rock Excavation at Stoltz Realignment 9/28/2023 12.22 CY $80.00 $977.60 Existing Valve Box Replacement at Stoltz Tie -In 10/10/2023 1 LS $350.00 $350.00 Change 6" Tee to Anchoring Tee 10/16/2023 1 EA $40.00 $40.00 Remove Existing Buried Air Release Manhole - STA 3+80 10/18/2023 1 EA $500.00 $500.00 Additional 2" SS Pipe for Air Release Vent Relocations 10/19/2023 70 LF $45.00 $3,150.00 Replace Old/Rusted Curb Stops for the Park Outside Project Limits 11/7/2023 11 EA $750.00 $750.00 Totall $5,767.60