Loading...
Update: 3000 Jackson Street, H & W BuildingCity of Dubuque City Council Meeting Action Items # 04. Copyrighted December 18, 2023 ITEM TITLE: Update: 3000 Jackson Street, H & W Building SUMMARY: City Manager providing an update on 3000 Jackson Street, H & W Building. SUGGESTED Receive and File; PresentationSuggested Disposition: DISPOSITION: ATTACHMENTS: Description Type MVM Memo City Manager Memo Staff Memo Staff Memo Report Supporting Documentation THE C DUjIBQTE Masterpiece on the Mississippi TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: Update: 3000 Jackson Street, H & W Building DATE: December 14, 2023 Dubuque WAWca 914 ii 2007-2012.2013 2017*2019 Housing & Community Development Director Alexis Steger is providing an update on 3000 Jackson Street, H & W Building. v Mic ael C. Van Milligen MCVM:sv Attachment cc: Crenna Brumwell, City Attorney Cori Burbach, Assistant City Manager Alexis Steger, Housing & Community Development Director Dubuque THE CITY OF All -America My nni K xvni , nz: a:u�ir, DUB E 2007-2012.2013 Masterpiece on the Mississippi 2017*2019 TO: Michael C. Van Milligen, City Manager Housing & Community Development Department 350 W 61h Street, Suite 312 Dubuque, Iowa 52001-4763 Office (563) 589-4230 http://www.cityofdubuque.org FROM: Alexis M. Steger, Housing and Community Development Director SUBJECT: 3000 Jackson H & W Building Update DATE: December 14, 2023 INTRODUCTION This memorandum provides a status update on the H & W project at 3000 Jackson Street. BACKGROUND December 4, 2023 staff presented a memo to update the City Council providing the following information: The bracing plans for the building should be ready for review December 15th, 2023. McClure Engineering was hired by the owner of the building, Steve Emerson, to engineer the bracing system. DISCUSSION City staff met with the following people on December 14, 2023: Steve Emerson, Owner Mike Shimkus, P.E., WHKS Timothy Patrick Earney, P.E., McClure Initial drawings of a bracing system for 3000 Jackson were provided to the city prior to the meeting. The drawings were discussed, as well as the new bracing system for Jackson Street facing wall, for which drawings were not provided. The new bracing system for the Jackson Street wall was already provided to the owner to put in place, so McClure will provide those plans to the city by Friday. More work needs to be completed by McClure to provide reasonable assurance that the bracing system will be a 12-month solution for keeping the public safe from collapse or falling debris. City staff reiterated that after the installation of the bracing system, McClure would need to be able to provide reasonable assurance that the building was stable. The level of "reasonable assurance" is not assurance that the building could never fail or collapse but is a level of assurance that the building will remain stable barring any unforeseeable circumstance. This level of assurance would mean that any other engineer with the information able to be obtained through thermal imaging, drone footage, site observations, historic photos, etc. would agree that the bracing system proposed is the proper recommendation to provide stability to protect the public. All buildings have the potential to fail, for example if a derecho, earthquake, fire, or other natural disaster occurs. No amount of Engineering can provide 100% assurance that a building will not fail, so it is important to note that the city is not looking for more than reasonable assurance of stability from McClure. Based on the need for a reasonable level of assurance, additional review of drone footage and interior photos will be completed by McClure to recheck that a west to east bracing system is not needed in conjunction with the north to south bracing system being proposed. Additionally, Steve Emerson will be in contact with the contractor within the week to discuss a timeline to remobilize the crane to the site to begin work and will also be working on a timeline for getting proper materials onsite. McClure is available to specify alternate material types should materials originally specified be on backorder or unavailable for immediate delivery to the site. RECOMMENDATION This memo is for information only. CC: Jill Connors; Economic Development Director Wally Wernimont, City Planner Michael Belmont, Asst. Housing & Comm Development Director 2 Emergency Repairs Project Name: 3000 Jackson St. Project Location: Dubuque, IA Client: Steve Emmerson Client Location: Cedar Rapids, IA 12/14/23 McClure Project: #2023001288 I hereby certify that these calculations were prepared by me or under my direct supervision. I am a duly licensed Professional Engineer under the laws of the State of Iowa I Wft4 2001 W Broadway Columbia, MO 65203 %�% Timothy Patrick Earney, PE Mc C L U R E TM Iowa Certificate of Authority No. 23983 NO: 26887 Your vision. Engineered here. Expires: December 31, 2024 III% 14 December, 2023 MCC L U RE- - Mr. Steve Emerson ENGINEERING CO. 3000 Jackson, LLC 221 2nd Ave SE Cedar Rapids, IA 52401 1901 Pennsylvania Drive Columbia, MO 65202 P 573.814.1568 RE: Emergency Stabilization of 3000 Jackson St. www.mecresults.com 0 2 I— w N_ 0 Ln 0 N N Z w U 3 0 N w 3 0 V) 0 Z X x D 0 U) 3 0 Z De LO a W 0 Se F-- 110 LU Z 0 0 3 0 fN w 3 0 Z Dear Steve, The following pages detail stabilization work to be completed at the southwest section of the brewery complex located at 3000 Jackson St. in Dubuque Iowa. Based on visual observations by McClure, we believe that these details address the most immediately concerning damage to the structure that affects the global stability only. There are obviously many other concerns with the structure, and it continues to deteriorate due to its current exposed condition. The observation that the repairs noted here are the most immediately needed is based only on visual observations made to the structure in August and October of this year. There is potentially unseen deterioration or damage - particularly at the interior of multi-wythe masonry walls - that could be structurally compromised now, but are unobservable without performing selective demolition. During our site observations, McClure directed the selective demolition of several portions of the exterior walls that were unstable and had potential to fall onto the public right of way. During our follow-up visit in October, this work was observed to have been performed adequately. We further directed the installation of temporary support columns within the large, two -bay wide window on the west facade (inside and out). This work was performed, however a 2x wood member was placed flat -wise on the window sill below these jacks. This member is crushing resulting in the jacks loosening and should be removed so that the jacks bear directly on the masonry. The repairs shown herein are not intended to be permanent and are only intended to shore up the structure in its current state. New, permanent work will be required once a full restoration is undertaken. As such, these repairs are not designed to be used for more than one to two years before it may be necessary to repair them due to exposure. It is understood, however, that you will begin a full restoration within the next 12 months. Respectfully Timothy P Earn, PE MCCLURE" making lives better Project: BY: —�@ ------ A Date. °®�Z... .. Description: B �� [� �� �"�/®� CS Page: FACE2FACE COMMUNICATION HOW: PURPOSE I PICTURE I PLAN I PART WHAT: CHANGES OBJECTIVES REASONS I EFFECT LISTEN: HONOR ECHO I ASK RESPOND www.mecresults.com Project: 3avJAei s-Q - -- B � M c C L U R E �" � _ Date: Descri tion: �lS,� ��0� �Td00LOA�� making lives better P � Page:�--- Moil / d F®R A FACKFACE COMMUNICATION HOW: PURPOSE I PICTURE I PLAN I PART WHAT: CHANGES ( OBJECTIVES I REASONS I EFFECT LISTEN: HONOR I ECHO I ASK I RESPOND www.mecresults.com .3000 J, c is 59 McCLURE- Ffl making lives heap iA,44 L' PfT/D�L (f 6 t0r1f, 'p Tt- 67 x C-dA4p Tq F.`1'6 N ■ FACE2FACE COMMUNICATION HOW: PURPOSE I PICTURE I PLAN I PART WHAT: CHANGES I OBJECTIVES REASONS I EFFECT LISTEN: HONOR I ECHO I ASK RESPOND -ems - G !;V 13A51� L 05, /Vi !a,' ! L i TO - copra /t (2 iZov(r SL A r3 x et,C t rr Tc Frr '`X0T It x( - o,'.54-p 1 5112es %O 3Cw,S x 3 "' PO g1'*7-o-r,4L L crrH//4 qm It r www.mecresults.com % McCLURE" n,okinq liv�,s 3000 OActcs¢� .l mom ME Ell iga! EfAad NONE WWI 15 0 ion rrElmo ME M OMEN0mom No NNE ONSOME MENEM wom NEW "MOEN SEEN ME No No M ME MMMMMMMOINMNMM No ME mommommomommomommommom....mom ENO ISO M ONE ME u iiiiiu ■■ ONION i mmoommommommoommmom moommommommommommoom mommmmmo IN moommommmmmmmom mommommoommoom ...ommommoommoom ............. Emosommom moommilmomm 0 No ME FACLYI-AL-t k UMMU►VII.AIIUN HOW: PURPOSE I PICTURE I PLAN I PART WHAT: CHANGES I OBJECTIVES REASONS I EFFECT LISTEN: HONOR I ECHO I ASK RESPOND www.mecresults.com