Old Highway Road Water Main Connection Loop 2023 Project Acceptance and ResolutionCity of Dubuque City Council Meeting Consent Items # 09. Copyrighted January 3, 2024 ITEM TITLE: Old Highway Road Water Main Connection Loop 2023 Project Acceptance and Resolution SUMMARY: City Manager recommending City Council adoption of the attached resolution to accept the improvements and authorize the final payment for the Old Highway Road Water Main Connection Loop 2023. SUGGESTED DISPOSITION: ATTACHMENTS: Description MVM Memo RESOLUTION Accepting Public Improvement Contract for the Old Highway Road Water Main Connection Loop Project 2023 Suggested Disposition: Receive and File; Adopt Resolution(s) OHR Project Acceptance MVM Memo OHR Project Acceptance Resolution Type City Manager Memo Staff Memo Resolutions THE C DUj!BQTE Masterpiece on the Mississippi TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: Old Highway Rd Water Main Connection Loop 2023 Project Acceptance and Resolution DATE: December 22, 2023 Dubuque WAWca 914 ii 2007-2012.2013 2017*2019 Water Department Director Christopher Lester is recommending City Council adoption of the attached resolution to accept the improvements and authorize the final payment for the Old Highway Rd Water Main Connection Loop 2023. The final project construction costs are $673,871.31 which is 3.4% less than the original bid amount. I concur with the recommendation and respectfully request Mayor and City Council approval. Mic ael C. Van Milligen MCVM:sv Attachment CC' Crenna Brumwell, City Attorney Cori Burbach, Assistant City Manager Christopher Lester, Water Department Director Jenny Larson, Chief Financial Officer Charlie Gau, Water Engineering Assistant THE CITY OF DUB TE Masterpiece on the Mississippi TO: Michael C. Van Milligen, City Manager FROM: Christopher Lester, Water Department Manager DATE: December 21, 2023 RE: Old Highway Rd Water Main Connection Loop 2023 Project Acceptance and Resolution Dubuque All-Anerin City Ntl kAM1L I. Nt: I � /j.l •i 2007.2012.2013 2017*2019 INTRODUCTION The purpose of this memorandum is to request adoption of the attached resolution to accept the improvements and authorize the final payment for the Old Highway Rd Water Main Connection Loop 2023. BACKGROUND The FY23 CIP (#4281000014) Budget included funding for Old Highway Rd Water Main Connection Loop 2023. The Old Highway Road water main was planned in three phases. The first phase, completed in 2022, extended water from Radford Road west approximately 1550 lineal feet to a location near 5520 Old Highway Road. The second phase, completed in 2023, extended water main east of Seippel Road to 4,650 feet immediately past the Dubuque County Fairgrounds entrance. The third and final phase of the project will complete the connection loop between the two previously phased projects in the 4th pressure zone. DISCUSSION Sealed bids for the Old Highway Rd Water Main Connection Loop 2023 were received and publicly opened on June 13, 2023. Top Grade Excavating of Farley, Iowa submitted the apparent low bid in the amount of $697,604.00. Approximately 4,650 feet of 12-inch water main was installed in the southern ditch line along Old Highway Road near the Dubuque County Fairgrounds entrance heading west and crossing into the north side of ditch line east of Sieppel Road to make final connection and complete a 4th pressure zone loop. Additionally, as part of this project, a water main was stubbed to Cousins Road and Pine View Drive for future expansion. BUDGETIMPACT Funding for the project comes from CIP #4281000014 Old Highway Road water main installation project with a starting balance of $853,750.00. The final costs for the Old Highway Rd Water Main Connection Loop 2023 are: Description Award Final Construction Cost Estimate $697,604.00 $673,871.31 Contingency $32,640.00 $0.00 Engineering Design (Preliminary and Final) $47,200.00 $47,200.00 Bidding and Award $5,300.00 $5,300.00 Construction Engineering, inc. Inspection $19,800.00 $25,292.50 Total Estimate Project Cost $80Z544.00 $751,663.81 The construction administration and construction engineering (inspection) were completed by Origin Design of Dubuque, Iowa under a separate task order. The Task Order Adjustment is recorded under Amendment No. 1 and was approved separately to this communication. The final project construction costs are $673,871.31 which is 3.4% less than the original bid amount. ACTION TO BE TAKEN The City Council is requested to adopt the attached resolution to accept the improvements and authorize the final payment for the Old Highway Rd Water Main Connection Loop 2023. cc: Jenny Larson, Chief Financial Officer Charlie Gau, Water Engineering Assistant F.\Users\Water\ENGINEERING\ProjectsCityProjects\ProjectsACTIVE(City)\Orchard Dr.WaterSystemlmprovements_CIP7401405(2021)\Council\Acceptanceoflmprovements\Orchard DrW MExtension-MVMCouncilAcceptancel2-27-2021.docx 2 Prepared by: Christopher Lester, Water Department Manager, 901 Hawthorn 5t., Dubuque, IA 52001 (563) 589-4290 Return to Adrienne N. Breitfelder, City Clerk, 50 W. 1311 St., Dubuque, IA 52001, (563) 589-4100 RESOLUTION NO. 3-24 ACCEPTING PUBLIC IMPROVEMENT CONTRACT FOR THE OLD HIGHWAY ROAD WATER MAIN CONNECTION LOOP PROJECT 2023 WHEREAS, the public improvement contract for the Old Highway Road Water Main Connection Loop Project 2023 (the Project) has been completed by the Contractor, Top Grade Excavating of Farley, Iowa, (Contractor), the Water Department Director has examined the work and recommends that the Project be accepted; and WHEREAS, the final contract amount is $673,871.31 of which retainage in the amount $33,693.57 shall be held for 30 days after acceptance and approval, and paid at that time provided no claims from others are filed; and WHEREAS, the City Council finds that the recommendation of the Water Department Manager should be accepted. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: Section 1. The recommendation of the Water Department Director is approved, and the Project is hereby accepted. Section 2. The Chief Financial Officer is hereby directed to pay to the Contractor the balance of the final payment of $33,693.57 as provided in Iowa Code chapter 573.13. Passed, adopted, and approved this 3rd day of January, 2024. Brad '; Mayor Attest: Adrienne Breitfelder, City Clerk