Loading...
Manson Rd Bridge Recon finalMEMORANDUM October 28, 2003 TO: FROM: SUBJECT: The Honorable Mayor and City Council Members Michael C. Van Milligen, City Manager Manson Road Bridge Reconstruction Project Iowa DOT No. BROS-2100 (14)--8J-31 Public Works Director Mike Koch is recommending acceptance of the Manson Road Bridge Reconstruction Project, as completed by Taylor Construction, Inc., in the final contract amount of $819,628.66. I concur with the recommendation and respectfully request Mayor and City Council approval. Michael C. Van Milligen MCVM/jh Attachment cc: Barry Lindahl, Corporation Counsel Cindy Steinhauser, Assistant City Manager Michael A. Koch, Public Works Director MEMORANDUM October 27, 2003 TO: FROM: SUBJECT: Michael C. Van Milligen, City Manager Michael A. Koch, Public Works Director ?~ ¥~ Manson Road Bridge Reconstruction Project Iowa DOT No. BROS-2100 (14)---8J-31 INTRODUCTION The enclosed resolutions provide for the acceptance of the contract for the Manson Road Bridge Reconstruction Project. DISCUSSION The Manson Road Bridge Reconstruction Project has been completed by Taylor Construction, Inc. of New Vienna, Iowa, in the final contract amount of $819,628.66. The project included the replacement of the original narrow bridge on Manson Road, which was geometrically and structurally obsolete and was posted at 12 tons, maximum loading. The bridge serves the only access into the Manson Road area, including the Twin-T mobile home park. RECOMMENDATION I recommend that the City Council accept the improvements and recommend that the final contract amount be established at $819,628.66 for the Manson Road Bridge Reconstruction Project. BUDGET IMPACT The following is a project cost summary of the completed construction contracts for the Manson Road Bridge Reconstruction Project: Award Final Geotechnical Engineering Services Archaeological Investigation Services Right-Of-Way Acquisition Construction Contract Contingency Engineering Design Services Construction Engineering Inspection 4,852.00 $ 4,852.00 6,100.00 6,100.00 113,118.00 120,023.04 785,075.00 819,628.66 113,600.00 0 50,500.00 27,375.00 75,000.00 57,100.00 Total Project Cost $1,148,245.00 $1,035,078.70 The project funding summary is as follows: Award Final Iowa DOT/FHWA HBRR Funds (80%) City Funds (20%) $ 850,000.00 298,245.00 $ 828,062.96 207,015.74 Total Project Funding $1,148,245.00 $1,035,078.70 The project will be funded from the Manson Road Bridge Capital Improvement Program carryover appropriation in the amount of $107,911 and the Fiscal Year 2003 Street Program carryover in the amount of $99,105, ACTION TO BE TAKEN The City Council is requested to adopt the attached resolutions accepting the improvement and establishing the final contract amount for the Manson Road Bridge Reconstruction Project. Prepared by Robert Schiesl, PE cc: Pauline Joyce, Administrative Services Manager Dennis Waugh, IIW Engineers & Surveyors Roger R. Walton, P.E., Local Systems Engineer, IDOT RESOLUTION NO. 425-03 ACCEPTING IMPROVEMENT Whereas, the contract for the Manson Road Bridge Reconstruction Project has been completed and the City Manager has examined the work and filed his certificate stating that the same has been completed according to the terms of the contract, plans and specifications and recommends its acceptance. NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: Section 1. That the recommendation of the City Manager be approved and that said improvement be and the same is hereby accepted. BE IT FURTHER RESOLVED that the City Treasurer be and he is hereby directed to pay to the contractor from the Fiscal Year 2003 Street Construction Fund in amount equal to the amount of his contract, less any retained percentage provided for therein. Passed, approved and adopted this 3rd day of November, 2003. Terrance M. Duggan, Mayor Jeanne F. Schneider, CMC, City Clerk RESOLUTION NO. 426-03 FINAL ESTIMATE Whereas, the contract for the Manson Road Bridge Reconstruction Project has been completed and the City Engineer has submitted his final estimate showing the cost thereof including the cost of estimates, notices and inspection and all miscellaneous costs. NOW THEREFORE, BE iT RESOLVED BY THE CiTY COUNCIL OF THE CITY OF DUBUQUE, IOWA: Section 1. That the cost of said improvement is hereby determined to be $1,035,078.70 and the said amount shall be paid from the Fiscal Year 2003 Street Construction Fund of the City of Dubuque, Iowa. Passed, approved and adopted this 3rd dayof November, ,2003: Jeanne F. Schneider, CMC, City Clerk City of Dubuque - Engineering Division Final Payment Form PAYMENT NO: Council Final PROIECT NgME: Manson Road Bridge Reconstruction Project CONTRACTOR: Taylor Consa'uefion, Inc. BID ITEM UNIT DA~: 284)c{-03 CONTRACT AMOUNT: $785,074.83 UNIT COST QUANTIqD/ AMOUNT EARNED TO DATE TO DATE 21014)850001 Clearing and Gmbbing 2 2 I02-2625000 Embankment in Place 3 2102-2713070 Excavation, Class 13, Roadway and Borrow 4 2104-2713020 Excavation, Class 13, Channel 5 2105-8425015 Topsoil, Strip, Salvage and Spread 6 2115-0100000 McdifiedSubbase 7 2213-7100400 Relocation of Mail Boxes 8 2301-0685100 BridgaApproaehSecfion S.Y. 9 2301-1033070 Standard or St/p form Portland Cement S.Y. Pavemem, Class C, Class 3, DuraNligL 7 iu. I0 23034)236428 Asphalt Cement I1 23034)431756 AsphaltCementConereteBinderCourse Type B, 3/4 in. mix, 60% crushed paflicles 12 2305-0450504 Asphalt Cement Concrete Surface Course, Type A, 1/2 in. Mix 45% Cxushed Part, No Special Frier Req. 13 2303-9093000 Driveway, Asphalt Cement Concrete 14 2314-8257000 DustContcolSurfaceTreaanent 15 2315-8275025 Surfacing, Driveway, Class A Crushed Stone 16 2401-6745625 Removal of Existing Bridge 17 2402-2720000 Excavation, Class 20 18 2402-2721000 Exeavation, CDss21 19 24034)100010 StmeturalConcrete0~ridge) 20 2404-7775000 Reinforcing Steel 21 2404-7775005 ReinforciugSteel, Epoxy Coaled 22 2407-0580142 Beams, Pretensioned Prestressed Concrete, LXA42 23 2407-0580150 Beams, Pretensioned Prestressed Concrete, LXA50 24 2408-7800000 Slructural Steel 25 2414-6424II0 Conerete Barrier Railing 26 2414-6675010 Steel Pipe Sidewalk Railing 27 24164)100015 Aprons, Concrete, 15 in. Dia. 28 2416-0100021 Aprons~Conerete, 21in. Dia. 29 24174)225015 Aprons Metal, 15in. Dia. 30 2417-I040015 Culvert, Corrugated Metal Entrance Pipe, 15 in. Dim 31 2501-5425042 Piles, Drive Steel Bear~g, I-[P 10 x 42 32 2501-5550042 Piles, FurulshSteelBearing,HP I0x42 33 2501-6335010 Prebored Holes 34 2502-8212014 Subdrain Longitudinal, 4 in. Dia. 35 25034480500 Storm SewerUtility Access, RA-50 36 2503-7325015 Sewer Pipe, 2000D Storm, 15 in. Dim 37 2503-7325018 Sewer Pipe, 2000D Storm, i8 in. Dia. 38 2503-7325021 SewerPipe, 2000DStorm, 21in. Dia. 39 2507-3250005 Eng~eering Fabric 40 2507-6800060 RevelmenL Class E, Riprap 41 2510-6745850 RemovalofPavement 42 2512-1725256 Curb and Gutter, P.C. Concrete, 2.5 R. L.F. 43 25134)471046 Concrete Barrier, Approach, RE46 Each 44 2515-2475006 Driveway, P.C. Concrete, 6 in. 45 2515-2475106 Drivesvay Reinforced P.C. Concrete, 6 in. 46 2515-6745600 Removal of Paved Driveway 47 2516-6745877 Removal of Retaining Walls and Footings 48 2518-6910000 Safely Closure Acre $2,200.00 2.10 $4,620.00 C.Y. $3.25 22939.00 $74,551.75 C.Y. $2.00 932.00 $I,864.00 C.Y. $4.00 800.00 $3;200.00 C.Y. $3.00 1405.00 $4,215.00 C.Y. $15.00 1521.73 $22,825.95 Each $48.05 8.00 $384.40 $65.30 133.32 $8,705.80 $31.50 1005.63 $31,677.35 Ton $170~0 64.65 $10,990.50 Ton $28.70 796.63 $22,863.28 Ton $34.22 346.61 $11,860.99 S.Y. $17.70 604.63 $10,701.95 Ton $1 IA0 385.93 $4,399.60 Lump $5,000~0 1.00 $5~00.00 C.Y. $25.00 92.00 $2,300.00 C.Y. $150.00 189.90 $28,485.00 C.Y. $250.00 382.60 $95,650.00 Lb. $0.50 32617.00 $16,308.50 Lb. $0.60 48005.20 $28,803.12 Each $5,500.00 12.0 $66,000.00 Each $6,200.00 6.00 $37~00.00 Lb. $2.25 4378.30 $9,851.18 L.F. $35.00 284.00 $9,940.00 LF. $29.90 141.60 $4,233.84 Each $284.00 I~0 $284.00 Each $326.70 1.00 $326.70 Each $111.75 4.00 $447.00 LF. $21.35 55.00 $1,I74.25 L.F. $1.00 1661.90 $1,661.90 L.F. $20.00 1770.30 $35~06.00 L.F. $35.00 96.00 $3,360.00 L.F. $9.15 550.00 $5,032.50 Each $1,594.40 1.00 $I,594.40 L~:. $40.90 280.00 $11,452.00 L.F. $43.60 582.70 $25,405.72 L.F. $50.65 30.00 $1,519.50 S.Y. $1.80 1692.70 $3,046.86 Ton [ $t2.35 I013.40 $12,515A9 S.Y. i $1.00 3850.00 $3,850.00 $9.90 1983.30 $19,634.67 $1,109.00 4.00 $4,436.00 S.Y. : $39.00 185.41 $7~230.99 S.Y. $43.55 234.17 $10,!98.10 S.Y. $7.40 467.90 $3,462.46 Lump ~ $100.00 1.00 $100.00 Each $245.00 2.00 $490.00 49 251%3275045 50 251%3300139 51 2519-6745630 52 2525-2&38030 53 2525-2638031 54 2526-8285000 55 2528-8445110 56 2528-8445112 57 2528-8445114 58 25334980005 59 2535-2000440 Fence, Chain Link, 72 in. Height Fence, Field, Type 39 Removal of Existing Fence Silt Fence Silff Fence for Ditch Cheeks Consmacfion Survey Traffic Control Flaggers Pilot Cars Mobilization Modular Block Retaining Wall 60 2599-9999005 ~atchBasin, I01B 61 2599-9999005 Catch Basin, 104B 62 2601-2634100 Mulching 63 2601-2636043 Seeding and Fertilizing (Rural) 64 2601-2636044 Seeding and Fertilizing (Urban) 65 2601-2639010 Sodding 66 2601-2642100 Stabilizing Crop - Seeing and Fertilizing Sta. $2,495.00 1.55 $3,862.26 Stm $500.00 DELETE Sta. $300.00 2A0 $720.00 L.F. $1.70 474.00 $805.80 L.F. $6.00 DELETE Lump $14,536.00 1.00 $14,536.00 Lmnp $1,500.00 1.00 $1,500.00 Day $205.00 DELETE Day $305.00 DELETE Lump $40,000.00 1.00 $40,000.00 S.F. $18.38 553.03 $10,164.69 Each $1,535.00 7.00 $10,745.00 Each $2,888.45 2.00 $5,776.90 Acre $2,000.00 0.96 $1,928.00 Acre $2,000.00 DELETE Acre $2,300.00 0.96 $2,217.20 SQ $50.00 381.73 $19,086.40 Acre $2,000.00 DELETE ADD CHANGE ORDER - EXTILA WORK ITEM UNIT GNIT COST QUANTE~ AMOUNT ,~MLNED TO DATE TO DATE 67 EWO S~abalization Stone, 3" Breaker 68 EWO Additional Consa~cfion Survey Staking 69 EWO PCC Test Cylinders 70 EWO Piles, Weld 71 EWO Reinforcing Steel, Additional, Unit Cost Increase 72 EWO Silt Fence, Remove & D/spose Ton $13.42 2266.24 $30,412.94 Ltmap $5,423.00 1.00 $5,423.00 Each $2.65 28.00 $74.20 Each $200.00 3.00 $600.00 Lb. $0.04 2038.00 $81.52 L.F. $1.70 474.00 $805.80 TOTAL DUE CONTRACTOR: Geoteehnical Engineering Services Archaeologieul Investigation Services Right-of-Way Acquisition Engineering Design Services Construction Engineering Inspection TOTAL CONSTRUCTION COST: $819,628.66 I $4,852.00 $6,100.00 $120,023.04 $27,375.0~0 $57,100.00 I51,035,07TM CERTIFICATE OF THE CITY MANAGER: correct am un o all work u/red to complete the above improvement. APPROVED: Mieimet Van Milligen, City Manager City of Dubuque, Iowa APEROVED: Michael A. Koch, Public Works Director City of Dubuque, Iowa CERTIFICATE OF THE CONTRACTOR: Theundeaulgnod, ~I~]}~/~_ ~J~F{A~'~/t ~ contractor for the above improvement, does hereby accept the above "Total Due Contractor", as full settlement for ail claims for said improvement. DATE: