Seippel Road Water Main Relocation Project - Acceptance of Public Improvement Construction ContractCity of Dubuque City Council Meeting Consent Items # 09. Copyrighted March 4, 2024 ITEM TITLE: Seippel Road Water Main Relocation Project -Acceptance of Public Improvement Construction Contract SUMMARY: City Manager recommending City Council adopt the attached resolution to accept the improvements and to authorize the payment of the contract amount of $175,308.58 to Horsfield Construction, I nc. for the Seippel Road Water Main Relocation Project. RESOLUTION Accepting the Seippel Road Water Main Relocation Project and authorizing the payment to the contractor SUGGESTED Suggested Disposition: Receive and File; Adopt Resolution(s) DISPOSITION: ATTACHMENTS: Description Type MVM Memo City Manager Memo Staff Memo Staff Memo Resolution Resolutions Engineer's Certificate of Completion Supporting Documentation THE C DUj!BQTE Masterpiece on the Mississippi TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: Seippel Road Water Main Relocation Project Acceptance of Public Improvement Construction Contract Project Code: 7402594,4281000025, 4281000040 DATE: February 29, 2024 Dubuque WAWca 914 ii 2007-2012.2013 2017*2019 Assistant City Engineer Robert Schiesl is recommending City Council adopt the attached resolution to accept the improvements and to authorize the payment of the contract amount of $175,308.58 to Horsfield Construction, Inc. for the Seippel Road Water Main Relocation Project. I concur with the recommendation and respectfully request Mayor and City Council approval. v Mic ael C. Van Milligen MCVM:sv Attachment CC' Crenna Brumwell, City Attorney Cori Burbach, Assistant City Manager Gus Psihoyos, City Engineer Robert Schiesl, Assistant City Engineer Jenny Larson, Chief Financial Officer Chris Lester, Water Department Director THE COF DtUB E Masterpiece on the Mississippi TO: Michael C. Van Milligen, City Manager Gus Psihoyos, City Engineer FROM: Robert Schiesl, Assistant City Engineer SUBJECT: Seippel Road Water Main Relocation Project Acceptance of Public Improvement Construction Contract Project Code: 7402594,4281000025, 4281000040 DATE: February 27, 2024 INTRODUCTION Dubuque All -America City Il 2007•2012.2013 2017*2019 The enclosed resolution provides for the acceptance of the public improvement construction contract for the Seippel Road Water Main Relocation Project. BACKGROUND The Iowa Department of Transportation (Iowa DOT) recently completed the new US Highway 20 Swiss Valley interchange project. As part of the US Highway 20 safety improvements, Priority 1 access control was implemented along the corridor between the Old Highway intersection and the new Swiss Valley interchange, requiring all existing at -grade access locations be eliminated. This resulted in the original landfill access on US20 being removed and a new frontage road access (Airborne Road) was created. The new Airborne Road connects directly to Seippel Road, near the Southwest Arterial interchange. Now completed, Airborne Road is under the jurisdiction of the City as a local public street. DISCUSSION For the past several construction seasons, the Engineering and Water Department have collaborated with the Iowa DOT to reroute impacted water main and construct new water main along Seippel Road, Cottingham Road and North Cascade Road. The new water main is now fully operational and provides the City with a more resilient and sustainable water distribution system. The Seippel Road Water Main Relocation Project was completed by Horsfield Construction, Inc. of Epworth, IA in the final contract amount of $175,308.58 which is a 66% increase from the original contract amount of $105,351.50. The contract increase ($69,957) is due to adding two (2) 16-inch gate valves ($20,510) and adding a 140 foot 24-inch steel casing pipe ($47,331) under the SW Arterial near Chesterfield Road to support a future water main crossing. The cost to install the 24-inch steel casing pipe under the SW Arterial prior to the highway being paved provided a significant benefit and cost savings to the City, saving approximately $300,000 versus directionally drilling a casing pipe through rock and shale at a future date. RECOMMENDATION I recommend that the City Council accept the improvements and authorize the payment of the contract amount of $175,308.58 to Horsfield Construction, Inc. for the Seippel Road Water Main Relocation Project. BUDGETIMPACT The project cost summary for the Seippel Road Water Main Relocation Project is summarized below: Description Cost Estimate Award Final Construction $126,200.00 $105,351.50 $175,308.58 Total Construction Cost $126,200.00 $105,351.50 F$175,308.58 The proposed project funding is summarized as follows: Project Code Fund Description Fund Amount 7402594 SW Arterial - Water Main Extension $ 94,321.82 4281000025 Airborne Road WM Extension 33,655.96 4281000040 Chesterfield Drive Water Main 47,330.80 Total Project Funding $175,308.58 REQUESTED ACTION The City Council is requested to adopt the attached resolution to accept the improvements and to authorize the payment of the contract amount of $175,308.58 to Horsfield Construction, Inc. for the Seippel Road Water Main Relocation Project. CC' Jenny Larson, Chief Financial Officer Chris Lester, Water Dept Manager F:\PROJECTS\SOUTHWEST ARTERIAL\Interchange - US20 Paving (44)\Watermain Relocation - Landfill Road\Council & Staff Documents\Acceptance Prepared by Robert Schiesl City of Dubuque En 'fneerin 50 W. 131" St. Dubuque, IA 52001 563 589-4270 Return to Adrienne N. Sreitfelder City Clerk City of Dubuque, 50 W. 13" St. Dubuque, IA 52001 (563)589-4100 RESOLUTION NO. 53-24 ACCEPTING THE SEIPPEL ROAD WATER MAIN RELOCATION PROJECT AND AUTHORIZING THE PAYMENT TO THE CONTRACTOR WHEREAS, the public improvement contract for the Seippel Road Water Main Relocation Project, (the Project) has been completed by the Contractor, Horsfield Construction, Inc. (Contractor), the City Engineer has examined the work and recommends that the Project be accepted; and WHEREAS, the final contract amount for the Project is $175,308.58; and WHEREAS, the Contractor has previously been paid $94,321.82, leaving a balance of $80,986.76; and WHEREAS, the City Council finds that the recommendation of the City Engineer should be accepted. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: SECTION 1. The recommendation of the City Engineer is approved, and the Project is hereby accepted. SECTION 2. The Finance Director is hereby directed to pay to the Contractor the balance of the retainage of $80,986.76 as provided in Iowa Code chapter 573, and to pay such retainage in accordance with the provisions of Iowa Code chapter 573 or Iowa Code chapter 26.13. Passed, approved, and adopted this 4th day of March 2024. pw Imo' . • m. ; c� • Attest: Adrienne N. Breitfelder, City Clerk CITY ENGINEER'S CERTIFICATE OF FINAL COMPLETION OF SEIPPEL ROAD WATER MAIN RELOCATION PROJECT The undersigned City Engineer of the City of Dubuque, Iowa, hereby certifies that he has inspected the Seippel Road Water Main Relocation Project has been performed in compliance with the terms of the Public Improvement Contract, and that the total cost of the completed work is $175,308.58. Dated this 27t" day of February 2024. Gus Psihoyos, City Engineer Filed in the office of the City Clerk on the 27t" day of February 2024. N-)-,0 71" 6, � L �.' - Adrienne N. Breitfelder, City Clerk