Sheridan Rd Storm Sewer ReconCITY OF DUBUQUE, IOWA MEMORANDUM May 29, 2001 TO: FROM: SUBJECT: The Honorable Mayor and City Council Members Michael C. Van Milligen, City Manager Sheridan Road Storm Sewer Reconstruction Public Works Director Mike Koch is recommending acceptance of the construction contract for the Sheddan Road Storm Sewer Reconstruction Project as completed by Tschiggfrie Excavating in the final contract amount of $116,689.71. I concur with the recommendation and respectfully request Mayor and City Council approval. Michael C. Van Milligen MCVM/jh Attachment cc: Barry Lindahl, Corporation Counsel Cindy Steinhauser, Assistant City Manager Michael A. Koch, Public Works Director TO: FROM: SUBJECT: CITY OF DUBUQUE, IOWA MEMORANDUM Michael C. Van Milligen, City Manager Michael A. Koch, Public Works Director May 24, 2001 Sheddan Road Storm Sewer Reconstruction INTRODUCTION The enclosed resolutions provide for the acceptance of the construction contract for the Sheridan Road Storm Sewer Reconstruction Project. DISCUSSION Work has been completed on the project by Tschiggfrie Excavating of Dubuque, Iowa, in the final contract amount of $116,689.71. RECOMMENDATION I would recommend that the City Council accept the improvement and the final contract price be established at $116,689.71. BUDGET IMPACT A summary of the budget costs is as follows: Bid Final Construction Contract $122,841.95 $116,689.71 Contingency 13,807.68 0 Engineering 22,782.67 22,782.67 Total Project Cost $159,432.30 $139,472.38 The project will be funded through the 1% Local Option Sales Tax Fund from a Fiscal Year 1999 appropriation in the amount of $104,500. Due to the rising reinforced concrete pipe (RCP) costs and the slight increase in the scope of the project, the project cost is higher than the funds projected for the project. The remaining $34,972.38 will be funded using the General Fund from a Fiscal Year 2000 appropriation in the amount of $92,507.00 originally intended for the guniting of storm sewers. ACTION TO BE TAKEN The City Council is requested to adopt the attached resolutions accepting the improvement and establishing the final construction cost. MAK/vjd Prepared by Deron Muehdng, Civil Engineer cc: Gus Psihoyos, Assistant City Engineer Prepared by: Michael A. Koch, Public Works Director Address: 50 W. t 3th Street, Dubuque, IA 52001-4864 RESOLUTION NO. 233-01 ACCEPTING IMPROVEMENT Whereas, the contract for the Sheridan Road Storm Sewer Reconstruction Project has been completed and the City Manager has examined the work and filed his certificate stating that the same has been completed according to the terms of the contract, plans and specifications and recommends its acceptance. NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: Section 1. That the recommendation of the City Manager be approved and that said improvement be and the same is hereby accepted. BE IT FURTHER RESOLVED that the City Treasurer be and he is hereby directed to pay to the contractor from the Fiscal Year 1999 1% Local Option Sales Tax Fund and the Fiscal Year 2000 General Fund in amounts equal to the amount of this contract, less any retained pementage provided for therein. Passed, approved and adopted this 4th day of June ., 2001. Terrance M. Duggan, Mayor Attest: Jeanne F. Schneider, City Clerk Prepared by: Michael A, Koch, Public Works Director Address: $0 W. 13th Street, Dubuque, IA 52001-4864 RESOLUTION NO.234-01 FINAL ESTIMATE Whereas, the contract for the Sheridan Road Storm Sewer Reconstruction Project has been completed and the City Engineer has submitted his final estimate showing the cost thereof including the cost of estimates, notices and inspection and all miscellaneous costs; NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: Section 1. That the cost of said improvement is hereby determined to be $139,472.38 and the said amount shall be paid from the 1% Local Option Sales Tax Fund and the General Fund. Passed, approved and adopted this 4th day of June, 2001. Attest: Jeanne F. Schneider, City Clerk City of Dubuque ENGINEERING DIVISION FINAL ESTIMATE FOR: Sheridan Road Storm Sewer Reconstruction DATE: May 23, 2001 ITEM QTY. UNIT UNIT COST TOTAL COST 30" Class 2 RCP Storm Sewer 12.00 6' - 30" Flared End Section w/Trash Rack 2.00 48" Class 3 RCP Storm Sewer 724.00 48" Class 3 RCP Storm Sewer, 29 Degree Bend 1.00 36"x58.5" Arch RCP Storm Sewer 44.00 Modified 101-C Catch Basin, Complete 5.00 7'x7' Junction Box No.1, CompIete 1.00 7'×7' Junction Box No.2, Complete 1.00 Bedding Stone, 1" Clean 206.19 Limestone Backfill 1162.88 3/4" Roiled Stone Base 171.46 1-Man Riprap I6.49 AC Street Patch 105.62 Seeding w/Mulch 1555.56 Silt Fence (erosion contrci) Traffic Control 1.00 Extra Work Performed Adjustment of Sanitary Sewer Latera~ @ 3160 Sheridan Road 1.00 $69.00 $828.00 $787.00 $1,574.00 $91.00 $65,884.00 $$08.00 $808.00 $115.00 $5,060.00 $1,570.00 $7,850.00 $6,516.00 $6,516.00 $6,516.00 $6,516.00 $9.20 $1,896.95 $6.]5 $7,151.71 $10.75 $1,843.20 $20.00 $329.80 $70.00 $7,393.40 $0.55 $855.56 $2.50 $844.00 $844.00 $1,339.09 $1,339.09 TOTAL DUE CONTRACTOR ENGINEERING TOTAL CONSTRUCTION COST I hereby certify that the. abpve statement.~hows in detail the correct amount of.RI[ wor~ r~l~'~ed to coml~/eJ~ the above improvement. Michael Van Milligen, Ci~ Manager Ci~ of Dubuque,Iowa The undersigned, , contractor for the above improvement, does hereby accept the above "Total Due Contracto(', as full seffiement for a[~ claims for said improvement. $t16,689.71 $116,689.71 Michael A. Koch Public Works Director