ITEM TITLE: 3000 Jackson Dubuque Brewing and Malting Project Update
SUMMARY: City Manager submitting a status update on the Dubuque Brewing and
Malting project at 3000 Jackson Street.
SUGGESTED Suggested Disposition: Receive and File
DISPOSITION:
ATTACHMENTS:
Description Type
MVM Memo City Manager Memo
Staff Memo Staff Memo
THE C
DUj!BQTE
Masterpiece on the Mississippi
TO: The Honorable Mayor and City Council Members
FROM: Michael C. Van Milligen, City Manager
SUBJECT: 3000 Jackson Dubuque Brewing and Malting Project Update
DATE: March 28, 2024
Dubuque
WAWca 914
ii
2007-2012.2013
2017*2019
Housing & Community Development Director Alexis Steger is submitting a status update
on the Dubuque Brewing and Malting project at 3000 Jackson Street.
v
Mic ael C. Van Milligen
MCVM:sv
Attachment
CC' Crenna Brumwell, City Attorney
Cori Burbach, Assistant City Manager
Alexis Steger, Housing & Community Development Director
Jill Connors; Economic Development Director
Wally Wernimont, Planning Services Director
Michael Belmont, Asst. Housing & Comm Development Director
Dubuque
THE CITY OF
All-Amerin Ciq
nxixxv,v nz.ur«o
UB E 11111.1
2007*2012*2013
Masterpiece on the Mississippi 2017*2019
TO: Michael C. Van Milligen, City Manager
Housing & Community
Development Department
350 W 61" Street, Suite312
Dubuque, Iowa 52001-4763
Office (563) 589-4230
http://www.cityofdubuque.org
FROM: Alexis M. Steger, Housing and Community Development Director
SUBJECT: 3000 Jackson, Dubuque Brewing and Malting Building Update
DATE: March 28, 2024
INTRODUCTION
This memorandum provides a status update on the Dubuque Brewing and Malting project
at 3000 Jackson Street.
BACKGROUND
On March 18, 2024, staff presented a memo to update the City Council providing the
following information:
Zinser, the construction company hired by the owner, has submitted the following
timeline:
Mobilize and setup equipment March 11 — March 15
Demolition of building — March 18 — April 5th
Cleanup of site April 8 — April 12
The electrical contractor completed relocation of internal electric service that enters the 3000
Jackson building that is scheduled for demolition but serves a portion of the building used by
Prairie Farms. Alliant Energy could not schedule removal of existing overhead powerlines until that
internal work was completed. Now that it is complete, Alliant is scheduling the removal of existing
power lines during the week of March 25, 2024.
A plumbing contractor has scheduled water and sewer disconnects for Monday March 18th
A large excavator has been brought on site; however, the crane will not be delivered until after
Alliant has removed the overhead powerlines.
DISCUSSION
The water and sewer utilities have been disconnected.
On Sunday, March 24, Prairie Farms was able to shut down their operations to complete the
electric service switch over. The service to Prairie Farms has been relocated and re -energized.
Alliant Energy converted an overhead electrical service line that fed a residence at 3035 Jackson
Street to an underground service. The underground portion of the service has been completed and
Alliant anticipates finalizing the switch -over on Friday March 28. That will complete Alliant Energy's
preparation work for the deconstruction.
The owner is awaiting final sign off from DMASWA, which is dependent on clearance
documentation from the asbestos abatement. The City is also waiting for a current Insurance
certificate from the contractor.
RECOMMENDATION
This memo is for information only.
Prepared By: Michael Belmont, Asst. Housing & Comm Development Director
CC: Jill Connors; Economic Development Director
Wally Wernimont, City Planner