Loading...
Burlington Street Water Main Improvement Project 2023: Project Acceptance and ResolutionCity of Dubuque City Council Meeting Consent Items # 07. Copyrighted May 6, 2024 ITEM TITLE: Burlington Street Water Main Improvement Project2023: Project Acceptance and Resolution SUMMARY: City Manager recommending City Council adopt the attached resolution to accept the improvements and authorize the final payment of $18,214.95 to Tschiggfrie Excavating for the Burlington Street Water Main Improvement Project. RESOLUTION Accepting Public Improvement Contract for the Burlington Street Water Main Improvement Project SUGGESTED Suggested Disposition: Receive and File; Adopt Resolution(s) DISPOSITION: ATTACHMENTS: Description Type MVM Memo City Manager Memo Burlington Water Main Project Acceptance MVM Staff Memo Memo Burlington Water Main Project Acceptance Resolution Resolutions Project Close Out Document Supporting Documentation THE C DUj!BQTE Masterpiece on the Mississippi TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: Burlington Street Water Main Improvement Project 2023 Project Acceptance and Resolution DATE: April 29, 2024 Dubuque WAWca 914 ii 2007-2012.2013 2017*2019 Water Department Director Christopher Lester is recommending City Council adopt the attached resolution to accept the improvements and authorize the final payment of $18,214.95 to Tschiggfrie Excavating for the Burlington Street Water Main Improvement Project. I concur with the recommendation and respectfully request Mayor and City Council approval. v Mic ael C. Van Milligen MCVM:sv Attachment CC' Crenna Brumwell, City Attorney Cori Burbach, Assistant City Manager Christopher Lester, Water Department Manager Jenny Larson, Chief Financial Officer Charlie Gau, Water Engineering Assistant THE CITY OF DUB TE Masterpiece on the Mississippi TO: Michael C. Van Milligen, City Manager FROM: Christopher Lester, Water Department Manager DATE: April 16, 2024 RE: Burlington Street Water Main Improvement Project 2023 Project Acceptance and Resolution Dubuque All-Anerin City Ntl kAM1L I. Nt: I � /j.l •i 2007.2012.2013 2017*2019 INTRODUCTION The purpose of this memorandum is to request adoption of the attached resolution to accept the improvements and authorize the final payment for the Burlington Street Water Main Improvement Project 2023. BACKGROUND The FY23 CIP (#4281000036) Budget included funding for Burlington Street Water Main Improvement Project. The Burlington St. water main reconstruction was started in September of 2023 with construction completed by the end of November 2023 except for landscape restoration and final seeding that needed to be completed in the spring due to the weather conditions. March 2024 the contractor completed final landscape restoration and seeding, completing the project. DISCUSSION Sealed bids for the Burlington Street Water Main Improvement Project were received and publicly opened on August 10, 2023. Tschiggfrie Excavating of Dubuque, Iowa submitted the apparent low bid in the amount of $312,252.00. Approximately 820 feet of 6-inch water main was reconstructed on Burlington St. from Stoltz St. to the south end of Burlington St. Additionally, (2) air release structures were installed at the intersection of Burlington St. and Primrose St. to help reduce pressure surges in the water main distribution system. BUDGETIMPACT Project funding is from CIP #4281000036 Burlington Street Water Main Improvement Project with a starting balance of $440,300. The final costs for the Burlington Street Water Main Improvement Project are: Description Award Final Construction Cost $312,252.00 $351,987.11 Engineering Design (Preliminary and Final) $50,515.00 $50,515.00 Construction Engineering (Fulltime Inspection) $21,900 $29,700.00 otal Project Cost $384,667.00 $432,202.11 The construction administration and construction engineering (inspection) were completed by WHKS of East Dubuque, IL under a Professional Services Agreement. The Professional Services Agreement adjustment is recorded under Amendment No. 1 and was approved separately to this communication. Project construction was completed by Tschiggfrie Excavating, of Dubuque, IA. Final construction costs are $351,987.11 which is 12.73% higher than the original bid amount. The contract adjustments are recorded under Change Orders No. 1, No. 2, and No.3 and were also approved separately to this communication. ACTION TO BE TAKEN The City Council is requested to adopt the attached resolution to accept the improvements and authorize the final payment for the Burlington Street Water Main Improvement Project. cc: Jenny Larson, Chief Financial Officer Charlie Gau, Water Engineering Assistant 2 Prepared by: Christopher Lester Water Department Director, 901 Hawthorn St. Dubuque, IA 52001 (563) 589-4290 Return to Adrienne N. Breitfelder, City Clerk, 50 W. 13th St., Dubuque, IA 52001, (563) 589-4100 RESOLUTION NO. 106-24 ACCEPTING PUBLIC IMPROVEMENT CONTRACT FOR THE BURLINGTON STREET WATER MAIN IMPROVEMENT PROJECT WHEREAS, the public improvement contract for the Burlington Street Water Main Improvement Project (the Project) has been completed by the Contractor, Tschiggfrie Excavating of Dubuque, Iowa, (Contractor), the Water Department Director has examined the work and recommends that the Project be accepted; and WHEREAS, the final contract amount is $351,987.11 of which retainage in the amount $18,214.95 shall be held for 30 days after acceptance and approval, and paid at that time provided no claims from others are filed; and WHEREAS, the City Council finds that the recommendation of the Water Department Director should be accepted. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: Section 1. The recommendation of the Water Department Director is approved, and the Project is hereby accepted. Section 2. The Chief Financial Officer is hereby directed to pay to the Contractor the balance of the final payment of $18,214.95 as provided in Iowa Code chapter 573.13. Passed, adopted, and approved this 611, day of May, 2024. Attest: a_/'t� Adrienne N. Breitfelder, City Clerk THE CITY OF DUB E Masterpiece on the Mississippi City of Dubuque, Iowa Project Close Out Form PROJECT NAME: BURLINGTON WATER MAIN REPLACEMENT CONTRACTOR: Tschiggfrie Excavating FINAL CONTRACT AMOUNT $ 351,987.11 COUNCIL ACCEPTANCE ADDRESS: 425 Julien Dubuque Dr. DATE: 6-May-24 CITY, STATE, ZIP: IA 52003 LINE REFERENCE BID ITEM DESCRIPTION CONTRACT PREVIOUS TOTAL TO DATE I I CURRENT TOTAL TO DATE NO. NUMBER QUANTITY UNIT UNIT COST I QUANTITY AMOUNT QUANTITY AMOUNT QUANTITY AMOUNT COMP. Division 2010 - Earthwork, Subgrade, and Subbase 1 2010-108-D-1 Topsoil, On -site 25.00 CY $ 19.00 22.75 $ 432.25 2 2010-108-J-0 Subbase, Modified Subbase - Gradation 14 860.00 TON $ 19.00 972.35 $ 18,474.65 Sub Total $ 18,906.90 Division 3010 -Trench Excavation and Backfill 3 3010-108-A-0 Bedding Material, 1" Commercial Clean Stone 185.00 TON $ 26.00 212.61 $ 5,527.86 4 3010-108-C-0 Trench Foundation - 3" Breaker 100.00 TON $ 17.00 $ 5 3010-108-D-0 Replacement of Unsuitable Backfill Material Gradation 12a 750.00 TON $ 17.00 1501.46 $ 25,524.82 6 5010-108-A-1 Division 5010 - Pipe and Fittings Water Main, Trenched, DIP, 6" 820.00 LF $ 61.00 Sub Total 820.09 $ 31,052.68 $ 50,025.49 7 5010-108-A-1 Water Main, Trenched, DIP, 12" 10.00 LF $ 180.00 8.25 $ 1,485.00 8 5010-108-E-1 Water Service, Pipe, Copper, 3/4" 50.00 LF $ 120.00 99.76 $ 11,971.20 9 5010-108-E-2 Water Service, Corporation, 3/4" 20.00 EA $ 910.00 20.00 $ 18,200.00 10 5010-108-E-3 Water Service, Curb Stop and Box, 3/4" 5.00 EA $ 1,100.00 7.00 $ 7,700.00 11 Water Service, Curb Stop Box, Clean and Adjust to Grade 20.00 EA $ 820.00 12.00 $ 9,840.00 12 4010-108-T-0 Fittings, DI Bend, 45 Deg, 6" 8.00 EA $ 560.00 10.00 $ 5,600.00 13 4010-108-T-0 Fittings, DI Bend, 90 Deg, 6" 1.00 EA $ 600.00 $ 14 5010-108-C-1 Fittings, DI Tee, 6x6 2.00 EA $ 880.00 1.00 $ 880.00 15 4010-108-T-0 Fittings, DI Sleeve, 6" 5.00 EA $ 570.00 4.00 $ 2,280.00 16 4010-108-T-0 Fittings, DI Sleeve, 12" 2.00 EA $ 1,300.00 2.00 $ 2,600.00 17 5010-108-C-2 Fittings by Weight, DI 250.00 LBS $ 12.00 $ 18 5010-108-F-0 Water Main Abandonment, Cap 6.00 EA $ 630.00 6.00 $ 3,780.00 19 5020-108-A-0 Division 5020 - Valves, Fire Hydrants, and Appurtenances Valve, Gate, 6" 6.00 EA $ 2,200.00 Sub Total 5.00 $ 114,361.69 $ 11,000.00 20 5020-108-J-0 Fire Hydrant Removal, Delivery to Water Dept. 1.00 EA $ 740.00 1.00 $ 740.00 21 5020-108-C-0 Fire Hydrant Assembly 1.00 EA $ 7,900.00 1.00 $ 7,900.00 22 5020-108-A-2 Valve, Air Relase Valve & Vacuum, 2" 2.00 EA $ 81800.00 2.00 $ 17,600.00 23 6010-108-A-0 Division 6010 - Structures for Sanitary and Storm Sewers Air Release Valve Manhole 2.00 EA $ 8,200.00 Sub Total 2.00 $ 37,240.00 $ 16,400.00 24 6010-108-E-0 Manhole Adjustment, Minor 1.00 EA $ 1,600.00 $ Sub Total $ 16,400.00 Division 7010 - Portland Cement Concrete Pavement 25 7010-108-E-0 Curb and Gutter, 30" (Width), 6" (Thickness) 525.00 LF $ 45.00 455.63 $ 20,503.35 Sub Total $ 20,503.35 Division 7020 - Hot Mix Asphalt Pavement 26 7020-108-A-0 HMA Pavement by Ton 285.00 TON $ 130.00 329.02 $ 42,772.60 Sub Total $ 42,772.60 A $ 22.75 $ 432.25 91.00% $ 972.35 $ 18,474.65 113.06 Sub Total $ 18,906.90 $ 212.61 $ 5,527.86 114.92% $ 1501.46 $ 25,524.82 200.19% Sub Total $ 31,052.68 $ 820.09 $ 50,025.49 100.01 $ 8.25 $ 1,485.00 82.50% $ 99.76 $ 11,971.20 199.52% $ 20.00 $ 18,200.00 100.00% $ 7.00 $ 7,700.00 140.00% $ 12.00 $ 9,840.00 60.00% $ 10.00 $ 5,600.00 125.00% $ 1.00 $ 880.00 50.00 $ 4.00 $ 2,280.00 80.00% $ 2.00 $ 2,600.00 100.00% $ 6.00 $ 3,780.00 100.00% Sub Total $ 114,361.69 $ 5.00 $ 11,000.00 83.33% $ 1.00 $ 740.00 100.00 $ 1.00 $ 7,900.00 100.00% $ 2.00 $ 17,600.00 100.00% Sub Total $ 37,240.00 $ 2.00 $ 16,400.00 100.00 Sub Total $ 16,400.00 $ 455.63 $ 20,503.35 86.79% Sub Total $ 20,503.35 $ 329.02 $ 42,772.60 115.45% Sub Total $ 42,772.60 Division 7030 - Sidewalks, Shared Use Paths, and Driveways 27 7030-108-A-0 Removal of Sidewalk 13.00 SY $ 8.30 1.20 $ 9.96 $ 1.20 $ 9.96 9.23 % 28 7030-108-E-0 PCC, Sidewalk, 4" (Thickness) 13.00 SY $ 60.00 1.76 $ 105.60 $ 1.76 $ 105.60 13.54 % 29 7030-108-E-0 PCC, Sidewalk, 6" (Thickness) 10.00 SY $ 120.00 1.20 $ 144.00 $ 1.20 $ 144.00 12.00 % 30 7030-108-G-0 Detectable Warning 20.00 SF $ 49.00 $ $ $ 31 7030-108-H-1 Driveway, Paved, PCC, 6" (Thickness) 10.00 SY $ 97.00 8.77 $ 850.69 $ 8.77 $ 850.69 87.70 % Sub Total $ 1,110.25 Sub Total $ 1,110.25 Division 7040 - Pavement Rehabilitation 32 7040-108-H-0 Pavement -Removal 1321.00 SY $ 7.10 1430.62 $ 10,157.40 $ 1430.62 $ 10,157.40 108.30% Sub Total $ 10,157.40 Sub Total $ 10,157.40 Division 8030 - Temporary Traffic Control 33 8030-108-A-0 Temporary Traffic Control 1.00 LS $ 5,800.00 1.00 $ 5,800.00 $ 1.00 $ 5,800.00 100.00% Sub Total $ 5,800.00 Sub Total $ 5,800.00 IDOT Division 2524 -Traffic Signing 34 Existing Sign, Remove and Reinstall, As Per Plan 1.00 EA $ 320.00 $ $ $ Sub Total $ Sub Total $ Division 9010 - Seeding 35 9010-108-B-0 Hydraulic - Seeding, Fertilizing, and Mulching, Type 1 0.05 AC $ 21,600.00 0.02 $ 432.00 0.03 $ 648.00 0.05 $ 1,080.00 100.00% Sub Total $ 432.00 Sub Total $ 1,080.00 Division 9040 - Erosion and Sediment Control 36 9040-108-A-2 Stormwater Pollution Prevention Plan (SWPPP) Management 1.00 LS $ 1,700.00 1.00 $ 1,700.00 $ 1.00 $ 1,700.00 100.00% 37 9040-108-D-1 Filter Socks, 8" 250.00 LF $ 3.20 162.50 $ 520.00 $ 162.50 $ 520.00 65.00 % 38 9040-108-D-2 Filter Socks, Removal 250.00 LF $ 0.22 162.50 $ 35.75 $ 162.50 $ 35.75 65.00 % Sub Total $ 2,255.75 Sub Total $ 2,255.75 Division 11,010 - Construction Survey 39 11010-108-A-0 Construction Survey 1.00 LS $ 3,400.00 1.00 $ 3,400.00 $ 1.00 $ 3,400.00 100.00% Sub Total $ 3,400.00 Sub Total $ 3,400.00 Division 11,020 - Mobilization 40 11020-108-A-0 Mobilization 1.00 LS $ 13,000.00 1.00 $ 13,000,00 $ 1.00 $ 13,000.00 100.00% Sub Total $ 13,000.00 Sub Total $ 13,000.00 Division 11,030 -Temporary Services During Construction 41 11030-108-A-0 Maintenance of Postal Service 1.00 LS $ 500.00 1.00 $ 500.00 $ 1.00 $ 500.00 100.00% 42 11030-108-B-0 Maintenance of Solid Waste Collection 1.00 LS $ 500.00 1.00 $ 500.00 $ 1.00 $ 500.00 100.00% Sub Total $ 1,000.00 Sub Total $ 1,000.00 Division 11,050 - Concrete Washout 43 11050-108-A-0 Concrete Washout 1.00 LS $ 500.00 1.00 $ 500.00 $ 1.00 $ 500.00 100.00% Sub Total $ 500.00 Sub Total $ 500.00 BASE AMOUNT EARNED TO DATE: $ 319,540.62 90.78% [ C.O. CHANGE ORES N0. (Change Order DeDscription) DATEHANGE ORDERPREVIOUS %EARNED EVIOU AMOUNT % EARNED URRENTAMOUNT % EARNEDOTAL TO DATE 1 Sink Hole Repair 10/16/23 $ 9,341.60 100.00% $ 9,341.60 $ 100.00% $ 9,341.60 2 Sanitary Sewer Spot Repair 11/21/23 $ 17,337.29 100.00% $ 17,337.29 $ 100.00% $ 17,337.29 3 Additional Requested Water Main Work 11/27/23 $ 5,767.60 100.00% $ 5,767.60 $ 100.00% $ 5,767.60 4 $ $ $ $ 5 $ $ $ $ Total Change Order Amount to Date: $ 32,446.49 Change Order Amount Earned to Date: $ 32,446.49 PAYMENTS PREVIOUSLY APPROVED: 1 $ 177,310.75 8 $ - 2 $ 156,461.41 9 $ - 3 $ 10 $ 4 $ 11 $ 5 $ 12 $ 6 $ 13 $ 7 $ 14 $ Retainage $ 18,214.95 TOTAL PAYMENTS FORWARDED: $ 351,987.11 Total Amount Inc. Change Orders Earned to Date: $ 351,987.11 CIP Earned to Date Retainage Ret. Release Amount to Date Encumbranc 4281000036 $ 334,649.82 $ 16,700.09 $ $ 317,301.73 $ (0.i -80- $ 17,337.29 $ 866.86 $ $ 16,470.43 $ 815-5501-00-01- $ $ $ $ $ 67990 $ $ $ $ $ Total $ 351,987.11 $ 17,566.95 $ $ 333,772.16 $ (0.i Project Engineering Cost Summary Project Engineering Costs Total Eng. CIP Staff Consultant Cost 4281000036 + $ 79,715.00 $ 79,715.00 -80- + $ 500.00 $ 500.00 815-5501-00-01- $ _ + $ _ $ _ 67990 $ + $ $ Total: $ $ 80,215.00 $ 80,215. 00 Project Cost / Funding Summary Construction Materials Total Eng. City Material Total Project CIP CIP Costs Stored On -Site Cost Cost Cost Funding 4281000036 $ 334,649.82 $ $ 79,715.00 $ 414,364.82 $ 440,300.00 -80- $ 17,337.29 $ $ 500.00 $ 17,837.29 $ 815-5501-00-01- $ _ $ _ $ _ $ _ $ _ 67990 $ $ $ $ $ $ $ $ $ $ Total: $ 351,987.11 $ $ 80,215.00 $ $ 432,202.11 $ 440,300.00 Total Amount Earned: $ 351,987.11 Stored Materials: $ - Final Contract Amount: $ 351,987.11 Total Engineering: $ 80.215.00 Total City Material Cost: $ - Total Project Cost: $ 432,202,11 CERTIFICATE OF THE JURISDICTION: I hereby certify that the above statement shows i detail the correct amount of all work required to complete the above improvement. APPROVED: Michael Van Milligen, City Manager City of Dubuque, Iowa APPROVED: Christopher Lester, Water Department Director City of Dubuque, Iowa CERTIFICATE OF THE CONTRACTOR: The undersigned, Tschiggfrie Excavating contractor for the above improvement, does hereby accept the above "Total Due Contractor', as full settlement for all claims for said improvement, CONTRACTOR: Tschiggf6e Excavating BY: E TITLE: DATE: �/ — c�.`—