Maus Park Lake Pump Station Culvert Repair Project Acceptance of Public Improvements and Contract Copyrighted
May 20, 2024
City of Dubuque Consent Items # 011.
City Council Meeting
ITEM TITLE: Maus Park Lake Pump Station Culvert Repair ProjectAcceptance of
Public Improvements and Contract- Project Number: 558650003
SUM MARY: City Manager recommending City Council adopt the resolution accepting
the Public I mprovements and authorize payment of$527,942.00 to
Tschiggfrie Excavating for the Maus Park Lake Pump Station Culvert
Repair Project.
RESOLUTION Accepting the Maus Park Lake Pump Station Culvert
Repair Project and authorizing final payment to the contractor
SUGGESTED Suggested Disposition: Receive and File;Adopt Resolution(s)
DISPOSITION:
ATTACHMENTS:
Description Type
MVM Memo City Manager Memo
Staff Memo Staff Memo
Resolution Resolutions
Engineer's Certificate of Completion Supporting Documentation
Dubuque
THE CITY QF �
All-Meriea Ciry
DLT B E ; . � . �
�� � �
MaSt� Z�C� aYd t�Q Mt55ZSSZ Z zoa�•zoiz•�ai3
YP pp za��*zai�
TO: The Honorable Mayor and City Council Members
FROM: Michael C. Van Milligen, City Manager
SUBJECT: Maus Park Lake Pump Station Culvert Repair Project
Acceptance of Public Improvements and Contract
Project Number: 558650003
DATE: May 14, 2024
City Engineer Gus Psihoyos is recommending City Council adopt the resolution
accepting the Public Improvements and authorize payment of$527,942.00 to
Tschiggfrie Excavating for the Maus Park Lake Pump Station Culvert Repair Project.
I concur with the recommendation and respectfully request Mayor and City Council
approval.
v
Mic ael C. Van Milligen
MCVM:sv
Attachment
cc: Crenna Brumwell, City Attorney
Cori Burbach, Assistant City Manager
Gus Psihoyos, City Engineer
Dubuque
THE CITY OF �
pll•America Ci�
DuB E �.�K,����K�, .
� � ���
� �
Maste iece oYl the MisSisSi i zoo��zoiz�zoi3
�`P pp zoi�*zatg
TO: Michael C. Van Milligen, City Manager
FROM: Gus Psihoyos, City Engineer
SUBJECT: Maus Park Lake Pump Station Culvert Repair Project
Acceptance of Public Improvements and Contract
Project Number: 558650003
DATE: May 10, 2024
INTRODUCTION
The enclosed resolution provides for the acceptance of the Public Improvement Construction
Contract for the Maus Park Lake Pump Station Culvert Repair Project.
BACKGROUND
Prior to the construction of the floodwall, a concrete arch culvert served to drain Maus Lake
beneath what are now Canadian National (CN) mainline railroad tracks to the Mississippi
River. When the floodwall was constructed, the existing arch culvert was retrofitted with
sections of 48-inch reinforced concrete pipe at the upstream and downstream ends to extend
the pipe. The flow line of the arch culvert was filled with concrete and formed to the radius of
a 48-inch pipe. A manually operated flood gate was installed at the downstream end, and a
pumping station was constructed at Maus Lake. In May 2017, ballast subsidence under the
railroad tracks was discovered at the location of the culvert crossing. Further investigation
revealed joint openings in the concrete arch below the tracks. The joint openings were filled
with epoxy and steel plates were installed along the roof of the pipe as a temporary repair
measure until a permanent solution could be developed.
The Maus Park Lake Pump Station Culvert Repair Project (Project) involved the lining of the
culvert that allows stormwater runoff to pass from the Maus Lake ponding area, under a set
of railroad mainline tracks, through the floodwall/levee system, into the Mississippi.
Specifically, the work involved the trenchless installation of approximately 110 lineal feet of a
steel slip liner inside the existing culvert resulting in a new culvert under the railroad tracks,
partially through the levee. In addition, the work included the construction of a permanent
cofferdam and concrete apron, concrete walls, and stop log level control system on the
interior side of the floodwall/levee system to facilitate both the lining process and allow for
maintenance of the culvert once complete.
In October of 2023, the City Council adopted Resolution 324-23, awarding the construction
contract for the Maus Park Lake Pump Station Culvert Repair Project to Tschiggfrie
Excavating in the amount of$525,172.00.
DISCUSSION
The Maus Park Lake Pump Station Culvert Repair Project has been completed by Tschiggfrie
Excavating of Dubuque, lowa, in the amount of$527,942.00 which is a 0.53% increase over
the original contract amount of $525,172.00 at the time of award.
.i
RECOMMENDATION
I recommend acceptance of the Public Improvements and authorize payment of$527,942.00
to Tschiggfrie Excavating for the Maus Park Lake Pump Station Culvert Repair Project.
BUDGET IMPACT
The estimate of probable cost for the Maus Park Lake Pump Station Culvert Repair Project
is as follows:
Description Estimate Award Final
Construction Contract $586,000.00 $525,172.00 $527,942.00
Contingency 58,600.00 52,500.00 0.00
Engineering 96,700.00 126,700.00 $142,000.00
Total Project Cost $ 741,300.00 $ 704,372.00 $669,942.00
The current project funding summary is as follows:
Project Funding Source Amount
Code
5586500032 Maus Park Culvert Restoration $ 463,940.00
5586500001 Storm Sewer Replacements 142,432.00 ��)
5586500020 Storm Sewer Improvements/Extensions 68,000.00 ��)
Total Project Funding $ 674,372.00
(1) Funding if needed pending the outcome of insurance claim
The Project is to be funded through an FY24 appropriation in the amount of $463,940 for
Maus Park Culvert Restoration (Project 5586500032). Because the pump station and culvert
were insured, the City submitted a claim (ICP047008A1)to the lowa Communities Assurance
Pool (ICAP)for making permanent repairs to the culvert that will offset the City's cost. Pending
the outcome of the claim, additional funds if needed will come from an FY24 appropriations
for Storm Sewer Replacements (Project 5586500001) and for Storm Sewer
Improvements/Extensions (Project 5586500020).
ACTION TO BE TAKEN
I respectfully request adoption of the attached resolution accepting the Public Improvement
Construction Contract and to authorize final payment in the amount of $527,942.00 to
Tschiggfrie Excavating for the Maus Park Lake Pump Station Culvert Repair Project.
Attach.
Prepared by Deron Muehring
cc: Crenna Brumwell, City Attorney
Jenny Larson, Chief Financial Officer
Tony Breitbach, Purchasing and Risk Manager
Arielle Swift, Public Works Director
Deron Muehring, Water& Resource Recovery Center Director
L
.--r
Prepared by: Deron Muehring, City of Dubuque Engineering, 50 W. 1Th Street Dubuque, IA 52001 583 589.4270
Return to: Adrienne N. Sreitfelder, City Clerk, 50W 131h Street, Dubuque, IA 52001 (563)589-4100
RESOLUTION NO. 133-24
ACCEPTING THE MAUS PARK LAKE PUMP STATION CULVERT REPAIR PROJECT
AND AUTHORIZING FINAL PAYMENT TO THE CONTRACTOR
Whereas, the Public Improvement Contract for the Maus Park Lake Pump Station
Culvert Repair Project (the Project) has been completed by Tschiggfrie Excavating (the
Contractor), and the City Engineer has examined the work and that the Project be
accepted; and
Whereas, the final contract amount for the Project is $527,942.00; and
Whereas, the Contractor has previously been paid $501,544.90, leaving a balance
of $26,397.10; and
Whereas, the City Council finds that the recommendation of the City Engineer
should be accepted.
NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY
OF DUBUQUE, IOWA:
Section 1. The recommendation of the City Engineer is approved and the Project
is hereby accepted.
Section 2. The Chief Financial Officer is hereby directed to pay to the Contractor
the balance of the retainage of $26,397.10 as provided in Iowa Chapter 573, and to pay
such retainage only in accordance with the provisions of Iowa Code Chapter 573 or Iowa
Code Chapter 26.13.
Passed, approved and adopted this 20th day of May, 20
Attest:
Adrienne Breitfelder, CMC, City Clerk
Ric W. Jones/Wvor Pro Tern
CITY ENGINEER'S CERTIFICATE OF FINAL COMPLETION OF THE MAUS LAKE
PUMP STATION CULVERT REPAIR PROJECT
The undersigned City Engineer of the City of Dubuque, lowa, hereby certifies that
he has inspected the Maus Lake Pump Station Culver Repair Project and work has been
perFormed in compliance with the terms of the Public Improvement Contract, and that the
total cost of the completed work is $669,942.00.
Dated this 13t" day of May 2024.
Gus Psihoyos, City Engineer
Filed in the office of the City Clerk on the 13t" day of May 2024.