Award Recording Memo 2024 ADA Sidewalk Curb Ramp Project Two Copyrighted May 20, 2024 City of Dubuque Consent Items # 014. City Council Meeting ITEM TITLE: Award Recording Memo 2024 ADA Sidewalk Curb Ramp Project Two SUM MARY: City Manager recommending City Council adopt a resolution awarding the construction contract for the 2024 ADA Sidewalk Curb Ramp Project Two through the adoption of the attached resolution to Midwest Concrete, I nc. in the amount of$154,422.00. RESOLUTION Awarding Public Improvement Contract for the 2024 ADA Sidewalk Curb Ramp Project Two SUGGESTED Suggested Disposition: Receive and File;Adopt Resolution(s) DISPOSITION: ATTACHMENTS: Description Type MVM Memo City Manager Memo Staff Memo Staff Memo Resolution Resolutions Dubuque THE CITY QF � All-Meriea Ciry DLT B E ; . � . � �� � � MaSt� Z�C� aYd t�Q Mt55ZSSZ Z zoa�•zoiz•�ai3 YP pp za��*zai� TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: Award Recording Memo 2024 ADA Sidewalk Curb Ramp Project Two DATE: May 14, 2024 City Engineer Gus Psihoyos is recommending City Council adopt a resolution awarding the construction contract for the 2024 ADA Sidewalk Curb Ramp Project Two through the adoption of the attached resolution to Midwest Concrete, Inc. in the amount of $154,422.00. The 2024 ADA Sidewalk Curb Ramp Project Two will provide for the replacement of access ramps on Fenelon Place from Burch Street to Raymond Place in conjunction with the Public Works Asphalt Overlay program at the following locations: Burch Street at Northern Alley, two single directional ADA sidewalk curb ramps. Burch Street and Fenelon Place, two single directional ADA sidewalk curb ramps. Burch Street at Southern Alley, two single directional ADA sidewalk curb ramps. Burch Street at 3rd Street, one single directional ADA sidewalk curb ramps. Summit Street at 5th Street, two single directional ADA curb ramps. Summit Street at Northern Alley, two single directional ADA sidewalk curb ramps. Summit Street at Central Alley, two single directional ADA sidewalk curb ramps. Summit Street at Fenelon Place, two single & two double directional ADA sidewalk curb ramps. Summit Street at 3rd Street, two single directional ADA sidewalk curb ramps. Gilmore Street at 5th Street, two single directional ADA sidewalk curb ramps. Gilmore Street at Maiden Lane, two single directional ADA sidewalk curb ramps. Gilmore Street at Cooper Place, two single directional ADA sidewalk curb ramps. Cooper Place at Alley, two single directional ADA sidewalk curb ramps. Cooper Place at Raymond Place, two single non-directional ADA sidewalk curb ramps. Fenelon Place at Raymond Place, two single directional ADA sidewalk curb ramps. I concur with the recommendation and respectfully request Mayor and City Council approval. v Mic ael C. Van Milligen MCVM:sv Attachment cc: Crenna Brumwell, City Attorney Cori Burbach, Assistant City Manager Gus Psihoyos, City Engineer Arielle Swift Public Works Director Jon Dienst, Civil Engineer II 2 Dubuque THE CITY OF � All•Ameriea Ciq DU B E .,�{��� :,�� ,. , � ��,, I I Maste 12C2 OYl t�le M1SS1551 1 zao�•zoiz•zai3 � pp zoi�*zoi� TO: Michael C. Van Milligen, City Manager FROM: Gus Psihoyos, City Engineer DATE: May 13, 2024 RE: Award Recording Memo 2024 ADA Sidewalk Curb Ramp Project Two INTRODUCTION The attached resolution authorizes the award of the public improvement construction contract for the 2024 ADA Sidewalk Curb Ramp Project Two. BACKGROUND Since 1990, the City of Dubuque has installed pedestrian access ramps around the City of Dubuque to conform with the American with Disabilities Act (ADA). The pedestrian access ramps allow people with mobility difficulties to access the City's sidewalk system. The design standards for these ramps have evolved over time as more ramps have been installed and standards have changed. Since 2011, The City of Dubuque follows the Accessibility Guidelines for Pedestrian Facilities in the Public Right-of-Way. These are updated standards to use for facilities in the public right-of-way and addressed issues brought up since the original ADA standards were developed. The lowa Department of Transportation has adopted the PROWAG standards. The Federal Highway Administration (FHWA) has also adopted the standards and requires all cities that receive federal funding to follow these standards. DISCUSSION The 2024 ADA Sidewalk Curb Ramp Project Two will provide for the replacement of access ramps on Fenelon Place from Burch Street to Raymond Place in conjunction with the Public Works Asphalt Overlay program at the following locations: Burch Street at Northern Alley, two single directional ADA sidewalk curb ramps. Burch Street and Fenelon Place, two single directional ADA sidewalk curb ramps. Burch Street at Southern Alley, two single directional ADA sidewalk curb ramps. Burch Street at 3rd Street, one single directional ADA sidewalk curb ramps. Summit Street at 5th Street, two single directional ADA curb ramps. Summit Street at Northern Alley, two single directional ADA sidewalk curb ramps. Summit Street at Central Alley, two single directional ADA sidewalk curb ramps. Summit Street at Fenelon Place, two single & two double directional ADA sidewalk curb ramps. Summit Street at 3rd Street, two single directional ADA sidewalk curb ramps. Gilmore Street at 5th Street, two single directional ADA sidewalk curb ramps. Gilmore Street at Maiden Lane, two single directional ADA sidewalk curb ramps. Gilmore Street at Cooper Place, two single directional ADA sidewalk curb ramps. Cooper Place at Alley, two single directional ADA sidewalk curb ramps. Cooper Place at Raymond Place, two single non-directional ADA sidewalk curb ramps. Fenelon Place at Raymond Place, two single directional ADA sidewalk curb ramps. BID RESULTS The City received bids on May 3, 2024, for the 2024 ADA Sidewalk Curb Ramp Project Two. Midwest Concrete, Inc. of Peosta, IA, submitted the low bid in the amount of $154,422.00 which is 10.64% below the engineer's estimate. A summary of the bid proposals received is as follows: Contractor Name Total Bid Midwest Concrete, Inc. $154,422.00 Valentine Construction Co., LLC $162,537.00 Larson Construction Co. Inc. $182,662.00 Tschiggfrie Excavating $223,983.80 RECOMMENDATION I recommend awarding the contract for the 2024 ADA Sidewalk Curb Ramp Project Two to Midwest Concrete, Inc. in the amount of$154,422.00. BUDGET IMPACT The estimate of probable costs for the 2024 ADA Sidewalk Curb Ramp Project Two is as follows: Description Cost Estimate Award Construction $ 172,814.00 $ 154,422.00 Contingency 25,922.10 25,922.10 Engineering Design and Administration 29,810.42 29,810.42 Total Construction Cost Estimate $ 228,546.52 $210,154.52 The funding summary is as follows: Project No. Fund Description Fund Amount 5421000002 Curb Ramp Program $ 210,154.52 ACTION TO BE TAKEN The City Council is requested to award the construction contract for the 2024 ADA Sidewalk Curb Ramp Project Two through the adoption of the attached resolution to Midwest Concrete, Inc. in the amount of$154,422.00. 2 cc: Arielle Swift Public Works Director Jon Dienst, Civil Engineer II 3 Prepared by ferry Bradley. City of Dubuque Engineering, 50 W. 13th St. Dubuque, IA 52001 (563)589-4270 Return to Adrienne N, Breitfelder City Clerk City of Dubuque, 50 W. 13th St. Dubuque, IA 52001 (563)589-4100 RESOLUTION NO. 136-24 AWARDING PUBLIC IMPROVEMENT CONTRACT FOR THE 2024 ADA SIDEWALK CURB RAMP PROJECT TWO Whereas, sealed proposals have been submitted by contractors for the 2024 ADA Sidewalk Curb Ramp Project Two, (the Project) and Notice to Bidders published on the City of Dubuque, Iowa website and plan room service with statewide circulation on the 231d day of April 2024; and Whereas, said sealed proposals were opened and read on the 3rd day of May 2024 and it has been determined that Midwest Concrete, Inc. of Dubuque, IA submitted the low bid in the amount of $154,422.00, and is the lowest responsive, responsible bidder for the Project. NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: That a Public Improvement Contract for the Project is hereby awarded to Midwest Concrete, Inc. and the City Manager is hereby directed to execute a Public Improvement Contract on behalf of the City of Dubuque for the Project. Passed, adopted, and approved this 20th day of May 202 Ric W. Jonps; Mayor Pro Tern Attest: e�v� &-"I Adrienne N. Breitfelder, CMC, City Clerk