2024 ADA Sidewalk Curb Ramp Project Four Award Recording MemoCity of Dubuque City Council Meeting Consent Items # 08. Copyrighted June 3, 2024 ITEM TITLE: 2024 ADA Sidewalk Curb Ramp Project Four Award Recording Memo SUMMARY: City Manager recommending City Council adopt a resolution awarding the construction contract for the 2024 ADA Sidewalk Curb Ramp Project Four to Drew Cook & Sons Excavating Co. in the amount of $109,878.25. RESOLUTION Awarding Public Improvement Contract for the 2024 ADA Sidewalk Curb Ramp Project Four SUGGESTED Suggested Disposition: Receive and File; Adopt Resolution(s) DISPOSITION: ATTACHMENTS: Description Type MVM Memo City Manager Memo Staff Memo Staff Memo Resolution Resolutions THE CITY DUOF B TEE Masterpiece on the Mississippi TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: 2024 ADA Sidewalk Curb Ramp Project Four Award Recording Memo DATE: May 29, 2024 Dubuque All -America City IN 2007.2012.2013 2017*2019 City Engineer Gus Psihoyos is recommending City Council adopt a resolution awarding the construction contract for the 2024 ADA Sidewalk Curb Ramp Project Four to Drew Cook & Sons Excavating Co. in the amount of $109,878.25. The 2024 ADA Sidewalk Curb Ramp Project Four will provide for the replacement of access ramps on 3rd Street from Parkway to Alpine Street areas in conjunction with the Public Works Asphalt Overlay program at the following locations: 3rd Street and Parkway Street, two directional ADA sidewalk curb ramps. 3rd Street and College Street, four non -directional ADA sidewalk curb ramps. 3rd Street and Glen Oak Street, two non -directional ADA sidewalk curb ramps. 3rd Street and Roland Street, two non -directional and one directional ADA sidewalk curb ramps. 3rd Street and Alley between Roland & Booth two directional ADA sidewalk curb ramps. 3rd Street and Booth Street, four non -directional ADA sidewalk curb ramps. 3rd Street and Alley between Booth & Nevada, two directional ADA sidewalk curb ramps. 3rd Street and Nevada Street, four non -directional ADA sidewalk curb ramps. 3rd Street and Alley between Nevada & Alpine, two directional ADA sidewalk curb ramps. I concur with the recommendation and respectfully request Mayor and City Council approval. k�k A & Mich el C. Van Milligen MCVM:sv Attachment cc: Crenna Brumwell, City Attorney Cori Burbach, Assistant City Manager Gus Psihoyos, City Engineer Arielle Swift, Public Works Director Jon Dienst, Civil Engineer II THE C DUUB--*--FE Masterpiece on the Mississippi TO: Michael C. Van Milligen, City Manager FROM: Gus Psihoyos, City Engineer DATE: May 28, 2024 RE: 2024 ADA Sidewalk Curb Ramp Project Four Award Recording Memo INTRODUCTION Dubuque AII•Ameriea M 1 I I I 2007-2012.2013 2017*2019 The attached resolution authorizes the award of the public improvement construction contract for the 2024 ADA Sidewalk Curb Ramp Project Four. BACKGROUND Since 1990, the City of Dubuque has installed pedestrian access ramps around the City of Dubuque to conform with the American with Disabilities Act (ADA). The pedestrian access ramps allow people with mobility difficulties to access the City's sidewalk system. The design standards for these ramps have evolved over time as more ramps have been installed and standards have changed. Since 2011, The City of Dubuque follows the Accessibility Guidelines for Pedestrian Facilities in the Public Right -of -Way. These are updated standards to use for facilities in the public right-of-way and addressed issues brought up since the original ADA standards were developed. The Iowa Department of Transportation has adopted the PROWAG standards. The Federal Highway Administration (FHWA) has also adopted the standards and requires all cities that receive federal funding to follow these standards. DISCUSSION The 2024 ADA Sidewalk Curb Ramp Project Four will provide for the replacement of access ramps on 3rd Street from Parkway to Alpine Street areas in conjunction with the Public Works Asphalt Overlay program at the following locations: 3rd Street and Parkway Street, two directional ADA sidewalk curb ramps. 3rd Street and College Street, four non -directional ADA sidewalk curb ramps. 3rd Street and Glen Oak Street, two non -directional ADA sidewalk curb ramps. 3rd Street and Roland Street, two non -directional and one directional ADA sidewalk curb ramps. 3rd Street and Alley between Roland & Booth two directional ADA sidewalk curb ramps. 3rd Street and Booth Street, four non -directional ADA sidewalk curb ramps. 3rd Street and Alley between Booth & Nevada, two directional ADA sidewalk curb ramps. 311 Street and Nevada Street, four non -directional ADA sidewalk curb ramps. 3rd Street and Alley between Nevada & Alpine, two directional ADA sidewalk curb ramps. BID RESULTS The City received bids on May 17, 2024, for the 2024 ADA Sidewalk Curb Ramp Project Four. Drew Cook & Sons Excavating Co. of Dubuque, IA, submitted the low bid in the amount of $109,878.25 which is 25.32% below the engineer's estimate. A summary of the bid proposals received is as follows: Contractor Name Total Bid Drew Cook & Sons Excavating Co. $109,878.25 Valentine Construction Co., LLC $117,574.00 Midwest Concrete, Inc. $158,696.30 Tschiggfrie Excavating $128,514.00 RECOMMENDATION Through the competitive quotation process for public improvements, I recommend awarding the contract for the 2024 ADA Sidewalk Curb Ramp Project Four to Drew Cook & Sons Excavating Co. in the amount of $109,878.25. BUDGETIMPACT The estimate of probable costs for the 2024 ADA Sidewalk Curb Ramp Project Four is as follows: Description Cost Estimate Award Construction $ 147,131.00 $ 109,878.25 Contingency 22,069.65 22,069.65 Engineering Design and Administration 25,380.10 25,380.10 Total Construction Cost Estimate $ 194,580.75 $ 157,328.00 The funding summary is as follows: Project No. Fund Description Fund Amount 5421000002 ±::::Curb Ramp Program $ 157,328.00 ACTION TO BE TAKEN In accordance with the competitive quotation requirements of Iowa Code, Section 26.14, it is necessary that the award for the 2024 ADA Sidewalk Curb Ramp Project Four be officially recorded in the minutes of the City Council. The City Council is requested to award the construction contract for the 2024 ADA Sidewalk Curb Ramp Project Four through the adoption of the attached resolution to Drew Cook & Sons Excavating Co. in the amount of $109,878.25. E cc: Arielle Swift Public Works Director Jon Dienst, Civil Engineer II Prepared by Kerry Bradley, City of Dubu ue En_qineerin% 50 W. 13th St. Dubuque, IA 52001 563 589-4270 Return to Adrienne N. Breitfelder City Clerk City of Dubuque, 50 W. 13th St. Dubuque, IA 52001 (563)589-4100 RESOLUTION NO. 160-24 AWARDING PUBLIC IMPROVEMENT CONTRACT FOR THE 2024 ADA SIDEWALK CURB RAMP PROJECT FOUR Whereas, sealed informal bid proposals have been submitted by contractors for the 2024 ADA Sidewalk Curb Ramp Project Four, (the Project) and Notice to Bidders published on the City of Dubuque, Iowa website and plan room service with statewide circulation on the 31d day of May 2024; and Whereas, said sealed proposals were opened and read on the 17th day of May 2024 and it has been determined that Drew Cook & Sons Excavating Co. of Dubuque, IA submitted the low bid in the amount of $109,878.00, and is the lowest responsive, responsible bidder for the Project. NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: Section 1. That a Public Improvement Contract for the Project is hereby awarded to Drew Cook & Sons Excavating Co. and the City Manager is hereby directed to execute a Public Improvement Contract on behalf of the City of Dubuque for the Project. Passed, adopted, and approved this 3rd day of June 2024. _f Brad M. anagh, Mayor Attest: Adrienne N. Breitfelder, OMC City Clerk