Loading...
2024 Airport ADA Ramp Replacement Award Recording MemoCity of Dubuque City Council Meeting Consent Items # 012. Copyrighted August 5, 2024 ITEM TITLE: 2024 Airport ADA Ramp Replacement Award Recording Memo SUMMARY: City Manager recommending adoption of resolution to award the construction contract for the 2024 Airport ADA Ramp Replacement Project to Midwest Concrete, Inc. in the amount of $58,987.40. RESOLUTION Awarding Public Improvement Construction Contract for the 2024 Airport ADA Ramp Replacement Project SUGGESTED Suggested Disposition: Receive and File; Adopt Resolution(s) DISPOSITION: ATTACHMENTS: Description Type MVM Memo City Manager Memo Staff Memo Staff Memo Resolution Resolutions Masterpiece on the Mississippi TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: 2024 Airport ADA Ramp Replacement Award Recording Memo DATE: July 30, 2024 Dubuque hitil Mari City IIi' 2007.2012.2013 2017*2019 City Engineer Gus Psihoyos is recommending City Council adopt a resolution to award the construction contract for the 2024 Airport ADA Ramp Replacement Project to Midwest Concrete, Inc. in the amount of $58,987.40. I concur with the recommendation and respectfully request Mayor and City Council approval. Michael C. Van Milligen MCVM:sv Attachment cc: Crenna Brumwell, City Attorney Cori Burbach, Assistant City Manager Gus Psihoyos, City Engineer Bob Schiesl, Assistant City Engineer Todd Dalsing, Airport Director Masterpiece on the Mississippi TO: Michael C. Van Milligen, City Manager FROM: Gus Psihoyos, City Engineer SUBJECT: 2024 Airport ADA Ramp Replacement Award Recording Memo DATE: July 29, 2024 Dubuque All -America City 2007.2012.2013 2017*2019 INTRODUCTION The attached resolution authorizes the award of the public improvement construction contract for the 2024 Airport ADA Ramp Replacement Project. BACKGROUND The ADA ramps at the Dubuque Regional Airport Terminal and parking lot were installed approximately 10 years ago. Since that time, the plastic ADA detectable warning tiles have been worn down or have broken in spots. The detectable warning panels are no longer compliant in many areas in front of the terminal and in the parking lots. DISCUSSION The project will include the removal and replacement of ADA ramps and detectable warnings. The detectable warning panels will be replaced with cast iron plates, the same as the ones being installed on all City of Dubuque ADA curb ramp projects. The cast iron detectable warning plates are much more durable and can handle changing weather conditions and snow removal operations. This project will replace ADA ramps and detectable warning panels in 16 areas. BID RESULTS The City solicited four bids for this project. The City received sealed bids on June 20, 2024, for the Airport ADA Ramp Replacement Project. Midwest Concrete, Inc. of Peosta, Iowa, submitted the low bid in the amount of $58,987.40. Which is 6.78% below the engineer's estimate. A summary of the bid proposals received is as follows: IContractor Name Total Bid Midwest Concrete, Inc. McDermott Excavating $58,987.40 Eastern Iowa Excavating & Concrete, LLC Drew Cook & Sons Excavating, Inc. Tschiggfrie Excavating Co. $65,094.00 $68,034.00 $71,202.00 $88,508.00 RECOMMENDATION I recommend awarding the construction contract for the Airport ADA Ramp Replacement Project to Midwest Concrete, Inc. in the low bid amount of $58,987.40. BUDGET IMPACT The estimate of probable cost for the Airport ADA Ramp Replacement Project is summarized in the following table: Description Cost Estimate Award Construction $ 63,279.00 $ 58,987.40 Contingency 6,327.00 6,327.00 Engineering Design and Administration 5,000.00 5,000.00 Total Construction Cost Estimate $ 74,606.00 $ 70,314.40 The proposed project funding is summarized as follows: Project No. Fund Description Fund Amount 5128000002 Replace Warning Surface Pads $70,314.40 Total Project Funding $ 70,314.40 REQUESTED ACTION In accordance with the competitive quotation requirements of Iowa Code Section 26.14, it is necessary that the award for the Airport ADA Ramp Replacement Project to Midwest Concrete, Inc. be officially recorded in the minutes of the City Council. The City Council is requested to award the construction contract for the 2024 Airport ADA Ramp Replacement Project through the adoption of the attached resolution to Midwest Concrete, Inc. in the amount of $58,987.40. cc: Bob Schiesl, Assistant City Engineer Todd Dalsing, Airport Manager Prepared by Kerry Bradley City of Dubuque Engineering 50 W. 13'h St. Dubuque, IA 52001 (563)589-4270 Return to Adrienne N. Breitfelder City Clerk City of Dubuque, 50 W. 131h St. Dubuque, IA 52001 (563)589-4100 RESOLUTION NO. 237-24 AWARDING PUBLIC IMPROVEMENT CONSTRUCTION CONTRACT FOR THE 2024 AIRPORT ADA RAMP REPLACEMENT PROJECT Whereas, sealed informal bid proposals have been submitted by contractors for the 2024 ADA Sidewalk Curb Ramp Project Three, (the Project) and Notice to Bidders published on the City of Dubuque, Iowa website and plan room service with statewide circulation on the 7th day of June 2024; and Whereas, said sealed proposals were opened and read on the 20th day of June 2024 and it has been determined that Midwest Concrete, Inc. of Peosta, IA submitted the low bid in the amount of $58,987.40, and is the lowest responsive, responsible bidder for the Project. NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: Section 1. That a Public Improvement Construction Contract for the Project is hereby awarded to Midwest Concrete, Inc. and the City Manager is hereby directed to execute a Public Improvement Construction Contract on behalf of the City of Dubuque for the Project. Passed, adopted, and approved this 5th day of August 2024. Attest: Adrienne N. Breitfeld'r, CMC City Clerk