Loading...
Well No. 7 Rehabilitation Project 2024 - Phase 2 Award Construction ContractCity of Dubuque City Council Meeting Action Items # 08. Copyrighted September 3, 2024 ITEM TITLE: Well No. 7 Rehabilitation Project 2024 - Phase 2 Award Construction Contract SUMMARY: City Manager recommending City Council award the construction contract for the Well No.7 Rehabilitation Project 2024 — Phase 2 to Peerless Well & Pump through the adoption of the attached resolution in the amount of $291,986.00. RESOLUTION Awarding Public Improvement Construction Contract for the Well No. 7 Rehabilitation Project 2024 — Phase 2 SUGGESTED Suggested Disposition: Receive and File; Adopt Resolution(s) DISPOSITION: ATTACHMENTS: Description Type MVM Memo City Manager Memo Well No. 7 Rehabilitation Project 2024 - Phase 2 Award Staff Memo Construction Contract MVM Memo Well No. 7 Rehabilitation Project 2024 Phase 2 Award Resolutions Construction Contract Resolution Bid Tabulation Supporting Documentation Masterpiece on the Mississippi TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: Well No. 7 Rehabilitation Project 2024 - Phase 2 Award Construction Contract DATE: August 29, 2024 Dubuque All-beria city 2007.2012.2013 2017*2019 Water Department Director Christopher Lester is recommending City Council award the construction contract for the Well No.7 Rehabilitation Project 2024 — Phase 2 to Peerless Well & Pump through the adoption of the attached resolution in the amount of $291,986.00. I concur with the recommendation and respectfully request Mayor and City Council approval. Mic ael C. Van Milligen MCVM:sv Attachment cc: Crenna Brumwell, City Attorney Cori Burbach, Assistant City Manager Christopher Lester, Water Department Director Jennifer Larson, Chief Financial Officer Nick Connolly, Water Operations Supervisor Masterpiece on the Mississippi TO: Michael C. Van Milligen, City Manager FROM: Christopher Lester, Water Department Director DATE: August 26, 2024 SUBJECT: Well No. 7 Rehabilitation Project 2024 - Phase 2 Award Construction Contract Dubuque All-AmericaCity 111111 2007*2012*2013 2017*2019 INTRODUCTION The purpose of this memorandum is to request award of the Well No.7 Rehabilitation Project 2024 — Phase 2 to Peerless Well & Pump in the amount of $253,434.00 including Alternate A in the amount of $38,552.00 and the amount of $381.00/HR for additional work hours as necessary. BACKGROUND The City of Dubuque budgets for and conducts routine well maintenance. The work includes repairs and rehabilitation associated with the City's groundwater supply (wells, pumps, and motors) including source water protection of the well field and the raw water transmission lines from the wells to the treatment plant. The City draws from both shallow and deep wells and each well should be inspected routinely or when capacity drops. The current practice is to evaluate the capacity of wells annually and pull the equipment and inspect the wells every 5 years, barring any known issues. Well No. 7 is pumping below its design capacity and is pumping sand, which can lead to premature wear and tear of pump impellers, possible plugging of the well transmission main and increase overall electricity expenses. During Phase 1 of the project, the well was taken out of service and inspected by Cahoy Pump Service in December 2022, to determine what rehabilitation may be necessary along with a completion of a condition assessment of the column piping, pump, and motor. Cahoy's findings were as follows. A large volume of sediment was discovered at the bottom of the well reducing the overall well depth by 488 vertical feet. The suction pipe and strainer were missing and not attached to the pump intake. This could be for two reasons; they were either not installed or could be at the bottom of the well in the 488 feet of sediment. The shafting, couplings, column pipe and spider bearings also showed significant wear and tear, and most notably, the pump was detached from the column pipe. Based on Cahoy's findings regarding the sediment and the impact, the depth of sediment may have on the well capacity, we are looking to bid removal of the sediment and conduct a pumping drawdown test to determine the well capacity, followed by installation of a replacement pump, motor and well appurtenances. Following sediment removal and the pump test, the city and contractor will review the specified replacement pump and motor and confirm the pump and motor sizing based on the available capacity of the well, including confirmation of the pump depth, suitable sand prevention method, and create a future well maintenance schedule. The scope and bidding documents were prepared, and the project was publicly bid. DISCUSSION On August 22, 2024, the City received one bid for the Well No. 7 Rehabilitation Project- Phase 2. The bid was submitted by Peerless Well & Pump of Dubuque, IA. The base bid amount is $253,434.00. Funds are available to also award Alternate A in the amount of $38,552.00, for a total bid amount of $291,986.00. During a well rehabilitation project, it is not uncommon to run into unforeseen conditions, therefore each bidder was also asked to provide an amount per hour for additional work hours that may be necessary. The low bidder rate is $381.00/HR. The base bid plus alternate A is $291,986.00, which is 39% lower than the engineer's estimate of $480,000. BUDGET IMPACT The estimate of probable cost for the project is summarized as follows: Description Estimate Construction Contract $480,000 Contingency $48,000 Contract Admin / Limited Construction Engineering $12,000 Total Project Cost $540,000 The funding summary is: CIP Funding Source Amount 4281000006 Wells/Well Field Rehab $ 540,000 Total Project Funding $ 540,000 ACTION TO BE TAKEN I respectfully request that the City Council award the construction contract for the Well No.7 Rehabilitation Project 2024 — Phase 2 to Peerless Well & Pump through the adoption of the attached resolution in the amount of $291,986.00. cc: Jennifer Larson, Chief Financial Officer Nick Connolly, Water Operations Supervisor F:\Users\Water\ENGINEERING\Projects - City Projects\Projects - ACTIVE (City)\Well 7 Rehab\Council\Award\Well No7 Rehabilitation Phase 2 - AWARD Memo 8-23-2024.doc 2 Prepared by Christopher Lester, Water Department,1902 Hawthorne St. Dubuque IA 52001 (563) 589-4291 Return to Adrienne N. Breitfelder City Clerk City of Dubuque, 50 W. 13th St. Dubuque, IA 52001 (563) 589-4100 RESOLUTION NO. 282-24 AWARDING PUBLIC IMPROVEMENT CONSTRUCTION CONTRACT FOR THE WELL NO. 7 REHABILITATION PROJECT 2024 — PHASE 2 WHEREAS, sealed proposals have been submitted by contractors for the Well No. 7 Rehabilitation Project 2024 - Phase 2, (the Project) pursuant to Resolution No. 245-24 and Notice to Bidders published on the City of Dubuque, Iowa website and plan room service wide circulation on the 6th day of August 2024; and WHEREAS, said sealed proposal was opened and read on the 22nd day of August 2024 and it has been determined that Peerless Well & Pump of Dubuque, Iowa submitted low bid in the amount of $253,434.00, plus Alternate A in the amount of $38,552.00, with an hourly rate of $381.00/HR, and is the lowest responsive, responsible bidder for the Project. NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL FO THE CITY OF DUBUQUE, IOWA. SECTION 1. That a Public Improvement Construction Contract for the Project is hereby awarded to Peerless Well & Pump and the City Manager is hereby directed to execute a Public Improvement Construction Contract on behalf of the City of Dubuque for the Project. Passed, adopted and approved this 3rd day of September 2024. Attest: Adrienne N. Breitfelder, City Clerk Masterpiece on the Mississippi BID TABULATION SUMMARY SHEET UNIT PRICE BID Project: Location: Date: Time: CIP No.: Project Name Conference Room B, City Hall, Dubuque, IA 000-0000 Bid Company Bid Bond 10% Section 00450 Bidder Status Form Section 00460 Contractor Background Infromation Section 00470 OR 00471 Addendums 0-0-0-0 Section 00400.11 Base Bid Alternate 1 Alternate 2 Basis of Award Section 00400.5 (Insert Alt. Title) (Insert Alt. Title) Base Bid + Alt's 0+0 Section 00400.6 Section 00400.6 1 Peerless Well & Pump $ 30,113.00 $253,434.00 $38,552.00 $381.00/HR $291,986.00 2 $0.00 3 $0.00 4 $0.00 5 $0.00 6 $0.00 7 $0.00 8 $0.00 9 $0.00 10 $0.00