Loading...
City Hall Annex Roof Replacement ProjectCity of Dubuque City Council Cd91Z6*1=1ZkikI=1►yi1-1110 Copyrighted November 4, 2024 ITEM TITLE: City Hall Annex Roof Replacement Project - Project Code: 5565000001 SUMMARY: City Manager recommending City Council adopt the attached resolution to accept the Public Improvement Construction Contract and to authorize the payment of the contract amount of $182,160.00 to Giese Roofing Company for the City Hall Annex Roof Replacement Project. RESOLUTION Accepting The City Hall Annex Roof Replacement Project And Authorizing Final Payment To The Contractor SUGGUESTED Receive and File; Adopt Resolution(s) DISPOSITION: ATTACHMENTS: 1. MVM Memo 2. City Hall Annex Roof Replacement Project - Staff Acceptance MEMO 3. City Hall Annex Roof Replacement Project - Council Acceptance RESOLUTION 4. City Hall Annex Roof Replacement Project - Engineer's Certificate of Completion Page 151 of 2498 THE C DUj!BQTE Masterpiece on the Mississippi TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: City Hall Annex Roof Replacement Project Project Code: 5565000001 DATE: October 30, 2024 Dubuque AIFAWca Ciq ni I 2007-2012.2013 2017*2019 City Engineer Gus Psihoyos is recommending City Council adopt the attached resolution to accept the Public Improvement Construction Contract and to authorize the payment of the contract amount of $182,160.00 to Giese Roofing Company for the City Hall Annex Roof Replacement Project. I concur with the recommendation and respectfully request Mayor and City Council approval. Mic ael C. Van Milligen MCVM:sv Attachment cc: Crenna Brumwell, City Attorney Cori Burbach, Assistant City Manager Gus Psihoyos, City Engineer Page 152 of 2498 THE CF DU�j--B E Masterpiece on the Mississippi TO: Michael C. Van Milligen, City Manager FROM: Gus Psihoyos, City Engineer DATE: October 30, 2024 SUBJECT: City Hall Annex Roof Replacement Project Project Code: 5565000001 INTRODUCTION Dubuque III-Americe City I� 2007•2012.2013 2017*2019 The attached resolution provides for the acceptance of the public improvement construction contract for the City Hall Annex Roof Replacement Project. BACKGROUND The City Hall annex roof on the building was more than 20 years old and was in a significant state of deterioration. The Facilities Management Team (FMT) had twice over that past 3 months hired roofing contractors to patch the existing roof to prevent water from leaking into the building. That work was only marginally successful and during heavy intensity rain events water still leaked into the building. Since the top floor of the Annex is home of the City's Information Services Department, water leaking in the building can lead to a critical disruption of services. During a heavy rain event the computer training lab and two employee workspaces became temporarily unusable. In response to permanently addressing the active roof leaks, the FMT expedited receiving emergency informal bid quotations from two local contractors for replacing the roof on the building. The based bid solicited pricing to replace the roof in kind with a single ply ketone ethylene ester flexible membrane product that provided a 20-year warranty. The bid documents also required pricing for an alternative bid to provide a metal roof with a 20-year warranty but would have a 50-year life expectancy. Based on the bid results, since the cost differential between the base bid and the alternate bid was only 8% while the life expectancy of the alternate bid roof is 30 additional years longer, Giese Roofing Company was awarded the alternate bid. Replacement of the roof has been coordinated with the Planning Services Department to ensure compliance with Historic Preservation District requirements. DISCUSSION The City Hall Annex Roof Replacement Project was completed by Giese Roofing Company in the final contract amount of $182,160.00 which is a 4.8% decrease above the original contract amount of $191,395.00. Page 1 of 2 Page 153 of 2498 RECOMMENDATION I recommend that the City Council accept the Public Improvements and authorize the payment of $182,160.00 to Giese Roofing Company of the City Hall Annex Roof Replacement Project. BUDGET IMPACT The project cost for the City Hall Annex Roof Replacement is $182,160.00 and will be funded as follows: Funding Code Funding Description Award Final 5565000001 City Annex Roof Replacement $ 82,500 $ 82,413.02 5565000008 City Annex Window Replacement 75,000 75,000.00 60-650-5505-00-01-63100 City Hall Building Maintenance 4,975 4,116.43 60-650-5505-00-01-63100 City Annex Building Maintenance 13,775 13,775.00 60-650-5505-00-01-65045 City Annex Building Maintenance 8,000 6,855.55 Total Project Funding: $191,395 $182,160.00 ACTION TO BE TAKEN The City Council is requested to adopt the attached resolution to accept the Public Improvement Construction Contract and to authorize the payment of the contract amount of $182,160.00 to Giese Roofing Company for the City Hall Annex Roof Replacement Project. Prepared by: Kerry Bradley, Project Support Specialist cc: Justin Hogan, Facilities Manager Page 2 of 2 Page 154 of 2498 Prepared by Kerry Bradley City of Dubuque Engineering 50 W. 13'h St Dubuque IA 52001 (563)589-4270 Return to Adrienne N. Breitfelder City Clerk City of Dubuque, 50 W. 13'h St. Dubuque, IA 52001 (563)589-4100 RESOLUTION NO. 345-24 ACCEPTING THE CITY HALL ANNEX ROOF REPLACEMENT PROJECT AND AUTHORIZING FINAL PAYMENT TO THE CONTRACTOR WHEREAS, the Public Improvement Contract for the City Hall Annex Roof Replacement Project (the Project) has been completed by the contractor, Giese Roofing Co. (Contractor), and the City Engineer has examined the work and recommends that the Project be accepted; and WHEREAS, the final contract amount for the Project is $182,160.00; WHEREAS, the Contractor has previously been paid $173,052.00, leaving a balance of $9,108.00; and WHEREAS, the City Council finds that the recommendation of the City Engineer should be accepted. NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: SECTION 1. The recommendation of the City Engineer is approved, and the Project is hereby accepted. SECTION 2. The Director of Finance and Budget is hereby directed to pay the balance of the retainage of $9,108.00 as provided in Iowa Code chapter 573, and to pay such retainage in accordance with the provisions of Iowa Code chapter 573 or Iowa chapter 26.13. Passed, approved and adopted this 4th day of November 2024. Attest: Adrienne N. Breitfelder, City Clerk CITY ENGINEER'S CERTIFICATE OF FINAL COMPLETION OF THE CITY HALL ANNEX ROOF REPLACEMENT PROJECT The undersigned City Engineer of the City of Dubuque, Iowa, hereby certifies that he has inspected the City Hall Annex Roof Replacement Project and work has been performed in compliance with the terms of the Public Improvement Contract, and that the total cost of the completed work is $182,160.00. Dated this 30t" day of October 2024. Gus Psihoyos, City Engineer Filed in the office of the City Clerk on the 30t" day of October 2024. Adrienne N. Breitfelder, CIVIC City Clerk Page 156 of 2498