Loading...
Acceptance 2024 ADA Sidewalk Curb Ramp Project OneCity of Dubuque City Council CONSENT ITEMS # 14. Copyrighted November 18, 2024 ITEM TITLE: Acceptance 2024 ADA Sidewalk Curb Ramp Project One SUMMARY: City Manager recommending the acceptance of the Public Improvement Construction Contract and to authorize the payment of the contract amount of $97,023.35 to Midwest Concrete, of Peosta, IA, for the 2024 ADA Sidewalk Curb Ramp Project One RESOLUTION Accepting The 2024 ADA Sidewalk Curb Ramp Project One And Authorizing Final Payment To The Contractor SUGGUESTED Receive and File; Adopt Resolution(s) DISPOSITION: ATTACHMENTS: 1. MVM Memo 2. 1 Memo Acceptance 2024 ADA Ramp Project One 3. 2 Acceptance Resolutions 2024 ADA Ramp Project One 4. 3 Engineer's Certificate of Completion Page 484 of 1454 THE CITY OF DUBE Masterpiece on the Mississippi TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: 2024 ADA Sidewalk Curb Ramp Project One PROJECT 5421000002 DATE: November 14, 2024 Dubuque AI WIN av 2007-2012.2013 2017*2019 City Engineer Gus Psihoyos is recommending City Council adopt the attached resolution to accept the Public Improvement Construction Contract and to authorize the payment of the contract amount of $97,023.35 to Midwest Concrete, of Peosta, IA, for the 2024 ADA Sidewalk Curb Ramp Project One. I concur with the recommendation and respectfully request Mayor and City Council approval. 1�,A� k�4 S��' Mic ael C. Van Milligen MCVM:sv Attachment cc: Crenna Brumwell, City Attorney Cori Burbach, Assistant City Manager Gus Psihoyos, City Engineer Jon Dienst, Civil Engineer II Arielle Swift, Public Works Director Adam Decker, Engineering Technician Page 485 of 1454 THE CITY OF DUB E Masterpiece on the Mississippi TO: Michael C. Van Milligen, City Manager FROM: Gus Psihoyos, City Engineer DATE: November 5, 2024 RE: 2024 ADA Sidewalk Curb Ramp Project One PROJECT 5421000002 Dubuque All -America City ­ 2007.2012.2013 2017*2019 INTRODUCTION The attached resolution provides for the acceptance of the public improvement construction contract for the 2024 ADA Sidewalk Curb Ramp Project One Project. BACKGROUND Since 1990, the City of Dubuque has installed pedestrian access ramps around the City of Dubuque to conform with the American with Disabilities Act (ADA). The pedestrian access ramps allow people with mobility difficulties to access the City's sidewalk system. The design standards for these ramps have evolved over time as more ramps have been installed and standards have changed. Since 2011, The City of Dubuque follows the Accessibility Guidelines for Pedestrian Facilities in the Public Right -of -Way. These are updated standards to use for facilities in the public right-of-way and addressed issues brought up since the original ADA standards were developed. The Iowa Department of Transportation has adopted the PROWAG standards. The Federal Highway Administration (FHWA) has also adopted the standards and requires all cities that receive federal funding to follow these standards. The 2024 ADA Sidewalk Curb Ramp Project One provided for the replacement of access ramps on Bluff Street from 10th to 12th Street in conjunction with the Public Works Asphalt Overlay program at the following locations: Bluff Street and 12th Street, four non -directional ADA sidewalk curb ramps. 12th Street and Locust Street, two non -directional ADA sidewalk curb ramps. Bluff Street and 11th Street, four non -directional ADA sidewalk curb ramps. Bluff Street and 10th Street, four single directional ADA sidewalk curb ramps. Page 486 of 1454 DISCUSSION The 2024 ADA Sidewalk Curb Ramp Project One was completed by Midwest Concrete in the final contract amount of $97,023.35 which is 1.7% below the original contract amount of $98,703.00. RECOMMENDATION I recommend that the City Council accept the Public Improvements and authorized the payment of 97,023.35 to Midwest Concrete for the 2024 ADA Sidewalk Curb Ramp Project One. BUDGETIMPACT The project cost for the 2024 ADA Sidewalk Curb Ramp Project One is as follows: Description Award Final Construction Contract $ 98,703.00 $ 97,023.35 Contingency 19,219.20 0.00 Construction Engineering & Inspection 22,102.08 9,702.34 Total $140,024.28 $106,725.69 The project funding summary is as follows: CIP No. Fund Description Fund Amount 5421000002 Curb Ramp Program $ 106,725.69 Total Project Funding $ 106,725.69 ACTION TO BE TAKEN The City Council is requested to adopt the attached resolution to accept the Public Improvement Construction Contract and to authorize the payment of the contract amount of $97,023.35 to Midwest Concrete, of Peosta, IA, for the 2024 ADA Sidewalk Curb Ramp Project One. Prepared By: Jon Dienst, Civil Engineer II M. Arielle Swift, Public Works Director Adam Decker, Engineering Technician 2 Page 487 of 1454 Prepared by Jon Dienst City of Dubuque Engineering 50 W. 131h St. Dubuque IA 52001 (563)589-4270 Return to Adrienne N. Breitfelder City Clerk City of Dubuque, 50 W. 13" St. Dubuque, IA 52001 (563)589-4100 RESOLUTION NO. 366-24 ACCEPTING THE 2024 ADA SIDEWALK CURB RAMP PROJECT ONE AND AUTHORIZING FINAL PAYMENT TO THE CONTRACTOR WHEREAS, the Public Improvement Contract for the 2024 ADA Sidewalk Curb Ramp Project One (the Project) has been completed by the contractor, Midwest Concrete (Contractor), and the City Engineer has examined the work and recommends that the Project be accepted; and WHEREAS, the final contract amount for the Project is $97,023.35; and WHEREAS, the Contractor has previously been paid $92,172.18, leaving a balance of $4,851,17; and WHEREAS, the City Council finds that the recommendation of the City Engineer should be accepted. NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: Section 1. The recommendation of the City Engineer is approved and the Project is hereby accepted. Section 2. The Director of Finance and Budget is hereby directed to pay the balance of the retainage of $4,851.17 as provided in Iowa Code chapter 573, and to pay such retainage in accordance with the provisions of Iowa Code chapter 573 or Iowa chapter 26.13. Passed, approved and adopted this 18th day of November 2024 Brad NK- j.vanagh, Mayor Attest: n Adrienne N. Breitfelder, CMC City Clerk CITY ENGINEER'S CERTIFICATE OF FINAL COMPLETION OF THE 2024 ADA SIDEWALK CURB RAMP PROJECT ONE The undersigned City Engineer of the City of Dubuque, Iowa, hereby certifies that he has inspected the 2024 ADA Sidewalk Curb Ramp Project One and work has been performed in compliance with the terms of the Public Improvement Contract, and that the total cost of the completed work is $106,725.69. Dated this 8t" day of November 2024. Gus Psihoyos, City Engineer Filed in the office of the City Clerk on the 81" day of November 2024. i �I I i Pop It Adrienne N. Breitfelder, CIVIC City Clerk Page 489 of 1454