Acceptance 2024 ADA Sidewalk Curb Ramp Project TwoCity of Dubuque
City Council
CONSENT ITEMS # 15.
Copyrighted
November 18, 2024
ITEM TITLE: Acceptance 2024 ADA Sidewalk Curb Ramp Project Two -
PROJECT 5421000002
SUMMARY: City Manager recommending the acceptance of the Public
Improvement Construction Contract and to authorize the
payment of the contract amount of $156,388.18 to Midwest
Concrete, of Peosta, IA, for the 2024 ADA Sidewalk Curb
Ramp Project Two.
RESOLUTION Accepting The 2024 ADA Sidewalk Curb
Ramp Project Two And Authorizing Final Payment To The
Contractor
SUGGUESTED Receive and File; Adopt Resolution(s)
DISPOSITION:
ATTACHMENTS:
1. MVM Memo
2. 1 Memo Acceptance 2024 ADA Ramp Project Two
3. 2 Acceptance Resolutions 2024 ADA Ramp Project Two
4. 3 Engineer's Certificate of Completion
Page 490 of 1454
THE CITY OF
DUBE
Masterpiece on the Mississippi
TO: The Honorable Mayor and City Council Members
FROM: Michael C. Van Milligen, City Manager
SUBJECT: 2024 ADA Sidewalk Curb Ramp Project Two
PROJECT 5421000002
DATE: November 13, 2024
Dubuque
AI WIN av
2007-2012.2013
2017*2019
City Engineer Gus Psihoyos is recommending City Council adopt the attached resolution
to accept the Public Improvement Construction Contract and to authorize the payment of
the contract amount of $156,388.18 to Midwest Concrete, of Peosta, IA, for the 2024 ADA
Sidewalk Curb Ramp Project Two.
I concur with the recommendation and respectfully request Mayor and City Council
approval.
1�,A� k�4 S��'
Mic ael C. Van Milligen
MCVM:sv
Attachment
cc: Crenna Brumwell, City Attorney
Cori Burbach, Assistant City Manager
Gus Psihoyos, City Engineer
Jon Dienst, Civil Engineer II
Arielle Swift, Public Works Director
Adam Decker, Engineering Technician
Page 491 of 1454
THE CITY OF
DUB E
Masterpiece on the Mississippi
TO: Michael C. Van Milligen, City Manager
FROM: Gus Psihoyos, City Engineer
DATE: November 5, 2024
RE: 2024 ADA Sidewalk Curb Ramp Project Two
PROJECT 5421000002
Dubuque
All -America City
2007.2012.2013
2017*2019
INTRODUCTION
The attached resolution provides for the acceptance of the public improvement
construction contract for the 2024 ADA Sidewalk Curb Ramp Project Two Project.
BACKGROUND
Since 1990, the City of Dubuque has installed pedestrian access ramps around the City
of Dubuque to conform with the American with Disabilities Act (ADA). The pedestrian
access ramps allow people with mobility difficulties to access the City's sidewalk system.
The design standards for these ramps have evolved over time as more ramps have been
installed and standards have changed.
Since 2011, The City of Dubuque follows the Accessibility Guidelines for Pedestrian
Facilities in the Public Right -of -Way. These are updated standards to use for facilities in
the public right-of-way and addressed issues brought up since the original ADA standards
were developed. The Iowa Department of Transportation has adopted the PROWAG
standards. The Federal Highway Administration (FHWA) has also adopted the standards
and requires all cities that receive federal funding to follow these standards.
The 2024 ADA Sidewalk Curb Ramp Project Two provided for the replacement of access
ramps on Fenelon Place from Burch Street to Raymond Place in conjunction with the
Public Works Asphalt Overlay program at the following locations:
Burch Street at Northern Alley, two single directional ADA sidewalk curb ramps.
Burch Street and Fenelon Place, two single directional ADA sidewalk curb ramps.
Burch Street at Southern Alley, two single directional ADA sidewalk curb ramps.
Burch Street at 3rd Street, one single directional ADA sidewalk curb ramps.
Summit Street at 5th Street, two single directional ADA curb ramps.
Summit Street at Northern Alley, two single directional ADA sidewalk curb ramps.
Summit Street at Central Alley, two single directional ADA sidewalk curb ramps.
Page 492 of 1454
Summit Street at Fenelon Place, two single & two double directional ADA sidewalk curb
ramps.
Summit Street at 3rd Street, two single directional ADA sidewalk curb ramps.
Gilmore Street at 5th Street, two single directional ADA sidewalk curb ramps.
Gilmore Street at Maiden Lane, two single directional ADA sidewalk curb ramps.
Gilmore Street at Cooper Place, two single directional ADA sidewalk curb ramps.
Cooper Place at Alley, two single directional ADA sidewalk curb ramps.
Cooper Place at Raymond Place, two single non -directional ADA sidewalk curb ramps.
Fenelon Place at Raymond Place, two single directional ADA sidewalk curb ramps.
DISCUSSION
The 2024 ADA Sidewalk Curb Ramp Project Two was completed by Midwest Concrete
in the final contract amount of $156,388.18 which is 1.3% above the original contract
amount of $154,422.00.
RECOMMENDATION
I recommend that the City Council accept the Public Improvements and authorized the
payment of $156,388.18 to Midwest Concrete for the 2024 ADA Sidewalk Curb Ramp
Project Two.
BUDGETIMPACT
The project cost for the 2024 ADA Sidewalk Curb Ramp Project Two is as follows:
Description
Award
Final
Construction Contract
$ 154,422.00
$ 156,388.18
Contingency
25,922.10
0.00
Construction Engineering & Inspection
29,810.42
15,638.82
Total
$210,154.52
$172,027.00
The project funding summary is as follows:
CIP No.
Fund Description
Fund Amount
5421000002
Curb Ramp Program
$ 172,027.00
Total Project Funding
$ 172,027.00
ACTION TO BE TAKEN
The City Council is requested to adopt the attached resolution to accept the Public
Improvement Construction Contract and to authorize the payment of the contract amount
of $156,388.18 to Midwest Concrete, of Peosta, IA, for the 2024 ADA Sidewalk Curb
Ramp Project Two.
Prepared By: Jon Dienst, Civil Engineer II
cc: Arielle Swift, Public Works Director
Adam Decker, Engineering Technician
2
Page 493 of 1454
Prepared by Jon Dienst City of Dubuque Engineering 50 W. 13`h St. Dubuque IA 52001 (563)589-4270
Return to Adrienne N. Breitfelder City Clerk City of Dubuque, 50 W. 131h St. Dubuque, IA 52001 (563)589-4100
RESOLUTION NO. 367-24
ACCEPTING THE 2024 ADA SIDEWALK CURB RAMP PROJECT TWO AND
AUTHORIZING FINAL PAYMENT TO THE CONTRACTOR
WHEREAS, the Public Improvement Contract for the 2024 ADA Sidewalk Curb
Ramp Project Two (the Project) has been completed by the contractor, Midwest Concrete
(Contractor), and the City Engineer has examined the work and recommends that the
Project be accepted; and
WHEREAS, the final contract amount for the Project is $156,388.18-1 and
WHEREAS, the Contractor has previously been paid $148,568.77, leaving a
balance of $7,819.41-1 and
WHEREAS, the City Council finds that the recommendation of the City Engineer
should be accepted.
NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF
DUBUQUE, IOWA:
Section 1. The recommendation of the City Engineer is approved and the
Project is hereby accepted.
Section 2. The Director of Finance and Budget is hereby directed to pay the
balance of the retainage of $7,819.41 as provided in Iowa Code chapter 573, and to pay
such retainage in accordance with the provisions of Iowa Code chapter 573 or Iowa
chapter 26.13.
Passed, approved and adopted this 18th day of November 2024.
Attest: a ,N1. C Brvanagh, Mayor
�A
Adrienne N. Breitfelder, CMC City Clerk
CITY ENGINEER'S CERTIFICATE OF FINAL COMPLETION OF THE 2024 ADA
SIDEWALK CURB RAMP PROJECT TWO
The undersigned City Engineer of the City of Dubuque, Iowa, hereby certifies that
he has inspected the 2024 ADA Sidewalk Curb Ramp Project Two and work has been
performed in compliance with the terms of the Public Improvement Contract, and that the
total cost of the completed work is $172,027.00.
Dated this 8t" day of November 2024.
Gus Psihoyos, City Engineer
Filed in the office of the City Clerk on the 81" day of November 2024.