Acceptance 2024 ADA Sidewalk Curb Ramp Project TwoCity of Dubuque City Council CONSENT ITEMS # 15. Copyrighted November 18, 2024 ITEM TITLE: Acceptance 2024 ADA Sidewalk Curb Ramp Project Two - PROJECT 5421000002 SUMMARY: City Manager recommending the acceptance of the Public Improvement Construction Contract and to authorize the payment of the contract amount of $156,388.18 to Midwest Concrete, of Peosta, IA, for the 2024 ADA Sidewalk Curb Ramp Project Two. RESOLUTION Accepting The 2024 ADA Sidewalk Curb Ramp Project Two And Authorizing Final Payment To The Contractor SUGGUESTED Receive and File; Adopt Resolution(s) DISPOSITION: ATTACHMENTS: 1. MVM Memo 2. 1 Memo Acceptance 2024 ADA Ramp Project Two 3. 2 Acceptance Resolutions 2024 ADA Ramp Project Two 4. 3 Engineer's Certificate of Completion Page 490 of 1454 THE CITY OF DUBE Masterpiece on the Mississippi TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: 2024 ADA Sidewalk Curb Ramp Project Two PROJECT 5421000002 DATE: November 13, 2024 Dubuque AI WIN av 2007-2012.2013 2017*2019 City Engineer Gus Psihoyos is recommending City Council adopt the attached resolution to accept the Public Improvement Construction Contract and to authorize the payment of the contract amount of $156,388.18 to Midwest Concrete, of Peosta, IA, for the 2024 ADA Sidewalk Curb Ramp Project Two. I concur with the recommendation and respectfully request Mayor and City Council approval. 1�,A� k�4 S��' Mic ael C. Van Milligen MCVM:sv Attachment cc: Crenna Brumwell, City Attorney Cori Burbach, Assistant City Manager Gus Psihoyos, City Engineer Jon Dienst, Civil Engineer II Arielle Swift, Public Works Director Adam Decker, Engineering Technician Page 491 of 1454 THE CITY OF DUB E Masterpiece on the Mississippi TO: Michael C. Van Milligen, City Manager FROM: Gus Psihoyos, City Engineer DATE: November 5, 2024 RE: 2024 ADA Sidewalk Curb Ramp Project Two PROJECT 5421000002 Dubuque All -America City ­ 2007.2012.2013 2017*2019 INTRODUCTION The attached resolution provides for the acceptance of the public improvement construction contract for the 2024 ADA Sidewalk Curb Ramp Project Two Project. BACKGROUND Since 1990, the City of Dubuque has installed pedestrian access ramps around the City of Dubuque to conform with the American with Disabilities Act (ADA). The pedestrian access ramps allow people with mobility difficulties to access the City's sidewalk system. The design standards for these ramps have evolved over time as more ramps have been installed and standards have changed. Since 2011, The City of Dubuque follows the Accessibility Guidelines for Pedestrian Facilities in the Public Right -of -Way. These are updated standards to use for facilities in the public right-of-way and addressed issues brought up since the original ADA standards were developed. The Iowa Department of Transportation has adopted the PROWAG standards. The Federal Highway Administration (FHWA) has also adopted the standards and requires all cities that receive federal funding to follow these standards. The 2024 ADA Sidewalk Curb Ramp Project Two provided for the replacement of access ramps on Fenelon Place from Burch Street to Raymond Place in conjunction with the Public Works Asphalt Overlay program at the following locations: Burch Street at Northern Alley, two single directional ADA sidewalk curb ramps. Burch Street and Fenelon Place, two single directional ADA sidewalk curb ramps. Burch Street at Southern Alley, two single directional ADA sidewalk curb ramps. Burch Street at 3rd Street, one single directional ADA sidewalk curb ramps. Summit Street at 5th Street, two single directional ADA curb ramps. Summit Street at Northern Alley, two single directional ADA sidewalk curb ramps. Summit Street at Central Alley, two single directional ADA sidewalk curb ramps. Page 492 of 1454 Summit Street at Fenelon Place, two single & two double directional ADA sidewalk curb ramps. Summit Street at 3rd Street, two single directional ADA sidewalk curb ramps. Gilmore Street at 5th Street, two single directional ADA sidewalk curb ramps. Gilmore Street at Maiden Lane, two single directional ADA sidewalk curb ramps. Gilmore Street at Cooper Place, two single directional ADA sidewalk curb ramps. Cooper Place at Alley, two single directional ADA sidewalk curb ramps. Cooper Place at Raymond Place, two single non -directional ADA sidewalk curb ramps. Fenelon Place at Raymond Place, two single directional ADA sidewalk curb ramps. DISCUSSION The 2024 ADA Sidewalk Curb Ramp Project Two was completed by Midwest Concrete in the final contract amount of $156,388.18 which is 1.3% above the original contract amount of $154,422.00. RECOMMENDATION I recommend that the City Council accept the Public Improvements and authorized the payment of $156,388.18 to Midwest Concrete for the 2024 ADA Sidewalk Curb Ramp Project Two. BUDGETIMPACT The project cost for the 2024 ADA Sidewalk Curb Ramp Project Two is as follows: Description Award Final Construction Contract $ 154,422.00 $ 156,388.18 Contingency 25,922.10 0.00 Construction Engineering & Inspection 29,810.42 15,638.82 Total $210,154.52 $172,027.00 The project funding summary is as follows: CIP No. Fund Description Fund Amount 5421000002 Curb Ramp Program $ 172,027.00 Total Project Funding $ 172,027.00 ACTION TO BE TAKEN The City Council is requested to adopt the attached resolution to accept the Public Improvement Construction Contract and to authorize the payment of the contract amount of $156,388.18 to Midwest Concrete, of Peosta, IA, for the 2024 ADA Sidewalk Curb Ramp Project Two. Prepared By: Jon Dienst, Civil Engineer II cc: Arielle Swift, Public Works Director Adam Decker, Engineering Technician 2 Page 493 of 1454 Prepared by Jon Dienst City of Dubuque Engineering 50 W. 13`h St. Dubuque IA 52001 (563)589-4270 Return to Adrienne N. Breitfelder City Clerk City of Dubuque, 50 W. 131h St. Dubuque, IA 52001 (563)589-4100 RESOLUTION NO. 367-24 ACCEPTING THE 2024 ADA SIDEWALK CURB RAMP PROJECT TWO AND AUTHORIZING FINAL PAYMENT TO THE CONTRACTOR WHEREAS, the Public Improvement Contract for the 2024 ADA Sidewalk Curb Ramp Project Two (the Project) has been completed by the contractor, Midwest Concrete (Contractor), and the City Engineer has examined the work and recommends that the Project be accepted; and WHEREAS, the final contract amount for the Project is $156,388.18-1 and WHEREAS, the Contractor has previously been paid $148,568.77, leaving a balance of $7,819.41-1 and WHEREAS, the City Council finds that the recommendation of the City Engineer should be accepted. NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: Section 1. The recommendation of the City Engineer is approved and the Project is hereby accepted. Section 2. The Director of Finance and Budget is hereby directed to pay the balance of the retainage of $7,819.41 as provided in Iowa Code chapter 573, and to pay such retainage in accordance with the provisions of Iowa Code chapter 573 or Iowa chapter 26.13. Passed, approved and adopted this 18th day of November 2024. Attest: a ,N1. C Brvanagh, Mayor �A Adrienne N. Breitfelder, CMC City Clerk CITY ENGINEER'S CERTIFICATE OF FINAL COMPLETION OF THE 2024 ADA SIDEWALK CURB RAMP PROJECT TWO The undersigned City Engineer of the City of Dubuque, Iowa, hereby certifies that he has inspected the 2024 ADA Sidewalk Curb Ramp Project Two and work has been performed in compliance with the terms of the Public Improvement Contract, and that the total cost of the completed work is $172,027.00. Dated this 8t" day of November 2024. Gus Psihoyos, City Engineer Filed in the office of the City Clerk on the 81" day of November 2024. i �I I i Pop It Adrienne N. Breitfelder, CIVIC City Clerk Page 495 of 1454