Loading...
Acceptance 2024 ADA Sidewalk Curb Ramp Project ThreeCity of Dubuque City Council CONSENT ITEMS # 16. Copyrighted November 18, 2024 ITEM TITLE: Acceptance 2024 ADA Sidewalk Curb Ramp Project Three SUMMARY: City Manager recommending the acceptance of the Public Improvement Construction Contract and to authorize the payment of the contract amount of $212,562.24 to Valentine Construction Co., LLC, of Dubuque, IA, for the 2024 ADA Sidewalk Curb Ramp Project Three. RESOLUTION Accepting The 2024 Ada Sidewalk Curb Ramp Project No. 3 And Authorizing Final Payment To The Contractor SUGGUESTED Receive and File; Adopt Resolution(s) DISPOSITION: ATTACHMENTS: 1. MVM Memo 2. 2024 ADA Ramp Project #3 - Staff Acceptance MEMO 3. 2024 ADA Ramp Project #3 - Council Acceptance RESOLUTION 4. 2024 ADA Ramp Project #3 - Engineer's Certificate of Completion Page 496 of 1454 THE CITY OF DUBE Masterpiece on the Mississippi TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: 2024 ADA Sidewalk Curb Ramp Project No. 3 Acceptance of the Public Improvement Construction Contract Project No. 5421000002 DATE: November 14, 2024 Dubuque AI WIN av 2007-2012.2013 2017*2019 City Engineer Gus Psihoyos is recommending City Council adopt the attached resolution to accept the Public Improvement Construction Contract and to authorize the payment of the contract amount of $212,562.24 to Valentine Construction Co., LLC, of Dubuque, IA, for the 2024 ADA Sidewalk Curb Ramp Project Three. I concur with the recommendation and respectfully request Mayor and City Council approval. v Mic ael C. Van Milligen MCVM:sv Attachment cc: Crenna Brumwell, City Attorney Cori Burbach, Assistant City Manager Gus Psihoyos, City Engineer Jon Dienst, Civil Engineer II Arielle Swift, Public Works Director Luke Rupp, Engineering Technician Page 497 of 1454 THE CITY OF DUB E Masterpiece on the Mississippi TO: Michael C. Van Milligen, City Manager FROM: Gus Psihoyos, City Engineer DATE: November 13, 2024 RE: 2024 ADA Sidewalk Curb Ramp Project No. 3 Acceptance of the Public Improvement Construction Contract Project No. 5421000002 INTRODUCTION Dubuque All -America City 2007.2012.2013 2017*2019 The attached resolution provides for the acceptance of the public improvement construction contract for the 2024 ADA Sidewalk Curb Ramp Project No. 3. BACKGROUND Since 1990, the City of Dubuque has installed pedestrian access ramps around the City of Dubuque to conform with the American with Disabilities Act (ADA). The pedestrian access ramps allow people with mobility difficulties to access the City's sidewalk system. The design standards for these ramps have evolved over time as more ramps have been installed and standards have changed. Since 2011, The City of Dubuque follows the Accessibility Guidelines for Pedestrian Facilities in the Public Right -of -Way. These are updated standards to use for facilities in the public right-of-way and addressed issues brought up since the original ADA standards were developed. The Iowa Department of Transportation has adopted the PROWAG standards. The Federal Highway Administration (FHWA) has also adopted the standards and requires all cities that receive federal funding to follow these standards. The 2024 ADA Sidewalk Curb Ramp Project No. 3 provided for the replacement of access ramps in conjunction with the Public Works Asphalt Overlay program at the following locations: • Montrose Terrace • Fairview PI & W. 16th Street • Cornell Street & W. 16th Street • Catherine Street & W. 16th Street • Cornell Street & W. 15th Street • Rosedale Ave • Henion Street & Pickett Street • N. Grandview Ave. & Algona Street • N. Grandview Ave. & Auburn Street • N. Grandview Ave. & Atlantic Street • Cornell Street & Pickett Street • Locust Street & Pierce Street • St. Ambrose Street & Rosedale Ave. Inc. Ramp @ Church Page 498 of 1454 DISCUSSION The 2024 ADA Sidewalk Curb Ramp Project No. 3 was completed by Valentine Construction Co., LLC in the final contract amount of $212,562.24, which is 25.2% above the original contract amount of $169,806.00. The overage on the project is primarily due to storm sewer intake repairs needed on Grandview Avenue at Auburn Street. The older style intakes conflicted with the new ADA ramps and required the relocation and construction of new intakes and storm sewer pipe to allow the ADA ramps to better align with each other. RECOMMENDATION I recommend that the City Council accept the public improvement construction contract and authorized the payment of $212,562.24 to Valentine Construction Co., LLC for the 2024 ADA Sidewalk Curb Ramp Project No. 3. BUDGETIMPACT The project cost for the 2024 ADA Sidewalk Curb Ramp Project Three is as follows: Description Award Final Construction Contract $ 169,806.00 $ 212,562.24 Contingency 26,682.44 0.00 Construction Engineering & Inspection 30,684.80 21,256.22 Total Project Cost $ 227,173.24 $ 233,818.46 The project funding summary is as follows: Project Code Fund Description Fund Amount 5421000002 Curb Ramp Program $ 233,818.46 Total Project Funding $ 233,818.46 ACTION TO BE TAKEN The City Council is requested to adopt the attached resolution to accept the Public Improvement Construction Contract and to authorize the payment of the contract amount of 212,562.24 to Valentine Construction Co., LLC, of Dubuque, IA, for the 2024 ADA Sidewalk Curb Ramp Project Three. Prepared By: Jon Dienst, Civil Engineer II cc: Arielle Swift, Public Works Director Luke Rupp, Engineering Technician 2 Page 499 of 1454 Prepared by Jon Dienst City of Dubuque Engineering 50 W. 13" St. Dubuque IA 52001 (563)589-4270 Return to Adrienne N. Breitfelder City Clerk City of Dubuque, 50 W. 131h St. Dubuque, IA 52001 (563)589-4100 RESOLUTION NO. 368-24 ACCEPTING THE 2024 ADA SIDEWALK CURB RAMP PROJECT No. 3 AND AUTHORIZING FINAL PAYMENT TO THE CONTRACTOR WHEREAS, the Public Improvement Construction Contract for the 2024 ADA Sidewalk Curb Ramp Project No. 3 (the Project) has been completed by the contractor, Valentine Construction Co., LLC (Contractor), and the City Engineer has examined the work and recommends that the Project be accepted; and WHEREAS, the final contract amount for the Project is $212,562.24; and WHEREAS, the Contractor has previously been paid $190,568.52, leaving a balance of $21,993.72-1 and WHEREAS, the City Council finds that the recommendation of the City Engineer should be accepted. NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: SECTION 1. The recommendation of the City Engineer is approved and the Project is hereby accepted. SECTION 2. The Director of Finance and Budget is hereby directed to pay the balance of the retainage of $21,993.72 as provided in Iowa Code chapter 573, and to pay such retainage in accordance with the provisions of Iowa Code chapter 573 or Iowa chapter 26,13. Passed, approved and adopted this 18th day of November 2024. rad M. _ vanagh, Mayor Attest: �W>� �4reie � Adrienne N. , CMC City Clerk Prepared by Jon Dienst City of Dubuque Engineering 50 W. 13th St. Dubuque, IA 52001 (563)589-4270 Return to Adrienne N. Breitfelder City Clerk City of Dubuque, 50 W. 13th St. Dubuque, IA 52001 (563)589-4100 RESOLUTION NO. -24 ACCEPTING THE 2024 ADA SIDEWALK CURB RAMP PROJECT No. 3 AND AUTHORIZING FINAL PAYMENT TO THE CONTRACTOR WHEREAS, the Public Improvement Construction Contract for the 2024 ADA Sidewalk Curb Ramp Project No. 3 (the Project) has been completed by the contractor, Valentine Construction Co., LLC (Contractor), and the City Engineer has examined the work and recommends that the Project be accepted; and WHEREAS, the final contract amount for the Project is $212,562.24; WHEREAS, the Contractor has previously been paid $190,568.52, leaving a balance of $21,993.72; and WHEREAS, the City Council finds that the recommendation of the City Engineer should be accepted. NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: SECTION 1. The recommendation of the City Engineer is approved and the Project is hereby accepted. SECTION 2. The Director of Finance and Budget is hereby directed to pay the balance of the retainage of $21,993.72 as provided in Iowa Code chapter 573, and to pay such retainage in accordance with the provisions of Iowa Code chapter 573 or Iowa chapter 26.13. Passed, approved and adopted this 181h day of November 2024. Attest: Adrienne N. Breitfelder, CMC City Clerk Brad M. Cavanagh, Mayor Page 500 of 1454 CITY ENGINEER'S CERTIFICATE OF FINAL COMPLETION OF THE 2024 ADA SIDEWALK CURB RAMP PROJECT No. 3 The undersigned City Engineer of the City of Dubuque, Iowa, hereby certifies that he has inspected the 2024 ADA Sidewalk Curb Ramp Project No. 3 and work has been performed in compliance with the terms of the Public Improvement Contract, and that the total cost of the completed work is $233,818.46. Dated this 13th day of November 2024. Gus Psihoyos, City Engineer Filed in the office of the City Clerk on the 131h day of November 2024. Adrienne N. Breitfelder, CIVIC City Clerk Page 501 of 1454