Acceptance 2024 ADA Sidewalk Curb Ramp Project FourCity of Dubuque
City Council
CONSENT ITEMS # 17.
Copyrighted
November 18, 2024
ITEM TITLE: Acceptance 2024 ADA Sidewalk Curb Ramp Project Four
SUMMARY: City Manager recommending the acceptance of the Public
Improvement Construction Contract and to authorize the
payment of the contract amount of $102,140.14 to Drew
Cook and Sons Excavating Co., of Dubuque, IA, for the 2024
ADA Sidewalk Curb Ramp Project N. 4.
RESOLUTION Accepting The 2024 ADA Sidewalk Curb
Ramp Project No. 4 And Authorizing Final Payment To The
Contractor
SUGGUESTED Receive and File; Adopt Resolution(s)
DISPOSITION:
ATTACHMENTS:
1. MVM Memo
2. 2024 ADA Ramp Project #4 - Staff Acceptance MEMO
3. 2024 ADA Ramp Project #4 - Council Acceptance RESOLUTION
4. 2024 ADA Ramp Project #4 - Engineer's Certificate of Completion
Page 502 of 1454
THE CITY OF
DUBE
Masterpiece on the Mississippi
TO: The Honorable Mayor and City Council Members
FROM: Michael C. Van Milligen, City Manager
SUBJECT: 2024 ADA Sidewalk Curb Ramp Project No. 4
Acceptance of the Public Improvement Construction Contract
Project Code: 5421000002
DATE: November 14, 2024
Dubuque
AI WIN av
2007-2012.2013
2017*2019
City Engineer Gus Psihoyos is recommending City Council adopt the attached
resolution to accept the Public Improvement Construction Contract and to authorize the
payment of the contract amount of $102,140.14 to Drew Cook and Sons Excavating
Co., of Dubuque, IA, for the 2024 ADA Sidewalk Curb Ramp Project N. 4.
I concur with the recommendation and respectfully request Mayor and City Council
approval.
v
Mic ael C. Van Milligen
MCVM:sv
Attachment
cc: Crenna Brumwell, City Attorney
Cori Burbach, Assistant City Manager
Gus Psihoyos, City Engineer
Jon Dienst, Civil Engineer II
Arielle Swift, Public Works Director
Luke Rupp, Engineering Technician
Page 503 of 1454
THE CITY OF
DUB E
Masterpiece on the Mississippi
TO: Michael C. Van Milligen, City Manager
FROM: Gus Psihoyos, City Engineer
DATE: November 13, 2024
RE: 2024 ADA Sidewalk Curb Ramp Project No. 4
Acceptance of the Public Improvement Construction Contract
Project Code: 5421000002
INTRODUCTION
Dubuque
All -America City
2007.2012.2013
2017*2019
The attached resolution provides for the acceptance of the public improvement
construction contract for the 2024 ADA Sidewalk Curb Ramp Project No. 4.
BACKGROUND
Since 1990, the City of Dubuque has installed pedestrian access ramps around the City
of Dubuque to conform with the American with Disabilities Act (ADA). The pedestrian
access ramps allow people with mobility difficulties to access the City's sidewalk system.
The design standards for these ramps have evolved over time as more ramps have been
installed and standards have changed.
Since 2011, The City of Dubuque follows the Accessibility Guidelines for Pedestrian
Facilities in the Public Right -of -Way. These are updated standards to use for facilities in
the public right-of-way and addressed issues brought up since the original ADA standards
were developed. The Iowa Department of Transportation has adopted the PROWAG
standards. The Federal Highway Administration (FHWA) has also adopted the standards
and requires all cities that receive federal funding to follow these standards.
The 2024 ADA Sidewalk Curb Ramp Project No. 4 provided for the replacement of access
ramps on 3rd Street from Parkway to Alpine Street areas in conjunction with the Public
Works Asphalt Overlay program at the following locations:
• 3rd Street and Parkway Street, two directional ADA sidewalk curb ramps.
• 3rd Street and College Street, four non -directional ADA sidewalk curb ramps.
• 3rd Street and Glen Oak Street, two non -directional ADA sidewalk curb ramps.
• 3rd Street and Roland Street, two non -directional and one directional ADA sidewalk
curb ramps.
• 3rd Street and Alley between Roland & Booth two directional ADA sidewalk curb
ramps.
• 3rd Street and Booth Street, four non -directional ADA sidewalk curb ramps.
Page 504 of 1454
• 3rd Street and Alley between Booth & Nevada, two directional ADA sidewalk curb
ramps.
• 3rd Street and Nevada Street, four non -directional ADA sidewalk curb ramps.
• 3rd Street and Alley between Nevada & Alpine, two directional ADA sidewalk curb
ramps.
DISCUSSION
The 2024 ADA Sidewalk Curb Ramp Project Four was completed by Drew Cook and
Sons Excavating Co. in the final contract amount of $102,140.14, which is 7.0% below
the original contract amount of $109,878.25.
RECOMMENDATION
I recommend that the City Council accept the public improvement construction contract
and authorized the payment of $102,140.14 to Drew Cook and Sons Excavating Co. for
the 2024 ADA Sidewalk Curb Ramp Project No. 4.
BUDGETIMPACT
The project cost for the 2024 ADA Sidewalk Curb Ramp Project No. 4 is as follows:
Description
Award
Final
Construction Contract
$ 109,878.25
$ 102,140.14
Contingency
22,069.65
0.00
Construction Engineering & Inspection
25,380.10
10,214.01
Total Project Cost
$ 157,328.00
$ 112,354.15
The project funding summary is as follows:
Project Code
Fund Description
Fund Amount
5421000002
Curb Ramp Program
$ 112,354.15
Total Project Funding
$ 112,354.15
ACTION TO BE TAKEN
The City Council is requested to adopt the attached resolution to accept the Public
Improvement Construction Contract and to authorize the payment of the contract amount
of 102,140.14 to Drew Cook and Sons Excavating Co., of Dubuque, IA, for the 2024 ADA
Sidewalk Curb Ramp Project N. 4.
Prepared By: Jon Dienst, Civil Engineer II
cc: Arielle Swift, Public Works Director
Luke Rupp, Engineering Technician
2
Page 505 of 1454
Prepared by Jon Dienst City of Dubuque Engineering 50 W. 13" St. Dubuque IA 52001 (563)589-4270
Return to Adrienne N. Breitfelder City Clerk City of Dubuque, 50 W. 131h St. Dubuque, IA 52001 (563)589-4100
RESOLUTION NO. 369-24
ACCEPTING THE 2024 ADA SIDEWALK CURB RAMP PROJECT NO. 4 AND
AUTHORIZING FINAL PAYMENT TO THE CONTRACTOR
WHEREAS, the Public Improvement Contract for the 2024 ADA Sidewalk Curb
Ramp Project No. 4 (the Project) has been completed by the contractor, Drew Cook and
Sons Excavating, Co. (Contractor), and the City Engineer has examined the work and
recommends that the Project be accepted; and
WHEREAS, the final contract amount for the Project is $102,140.14; and
WHEREAS, the Contractor has previously been paid $93,205.44, leaving a
balance of $8,934.70; and
WHEREAS, the City Council finds that the recommendation of the City Engineer
should be accepted.
NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF
DUBUQUE, IOWA:
SECTION 1. The recommendation of the City Engineer is approved and the
Project is hereby accepted.
SECTION 2. The Director of Finance and Budget is hereby directed to pay the
balance of the retainage of $8,934.70 as provided in Iowa Code chapter 573, and to pay
such retainage in accordance with the provisions of Iowa Code chapter 573 or Iowa
chapter 26,13.
Passed, approved and adopted this 18th day of November 2024.
Brad M'G6ivanagh, Mayor
Attest: v
7
Adrienne N. Breitfelder, CMC City Clerk
CITY ENGINEER'S CERTIFICATE OF FINAL COMPLETION OF THE 2024 ADA
SIDEWALK CURB RAMP PROJECT NO. 4
The undersigned City Engineer of the City of Dubuque, Iowa, hereby certifies that
he has inspected the 2024 ADA Sidewalk Curb Ramp Project No. 4 and said work has
been performed in compliance with the terms of the Public Improvement Contract, and
that the total cost of the completed work is $112,354.15.
Dated this 13th day of November 2024.
Gus Psihoyos, City Engineer
Filed in the office of the City Clerk on the 121h day of November 2024.
Adrienne N. Breitfelder, CIVIC City Clerk