Loading...
Acceptance 2024 Airport ADA Ramp Replacement ProjectCity of Dubuque City Council CONSENT ITEMS # 18. Copyrighted November 18, 2024 ITEM TITLE: Acceptance 2024 Airport ADA Ramp Replacement Project SUMMARY: City Manager recommending the acceptance of the Public Improvement Construction Contract and to authorize the payment of the contract amount of $63,976.29 to Midwest Concrete, of Peosta, IA, for the 2024 Airport ADA Ramp Replacement Project. RESOLUTION Accepting The 2024 Airport ADA Ramp Replacement Project And Authorizing Final Payment To The Contractor SUGGUESTED Receive and File; Adopt Resolution(s) DISPOSITION: ATTACHMENTS: 1. MVM Memo 2. 1 Memo Acceptance Airport ADA Ramps 3. 2 Acceptance Resolutions Airport ADA Ramps 4. 3 Engineer's Certificate of Completion Page 508 of 1454 THE CITY OF DUBE Masterpiece on the Mississippi TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: 2024 Airport ADA Ramp Replacement PROJECT 5128000002 DATE: November 14, 2024 Dubuque AI WIN av 2007-2012.2013 2017*2019 City Engineer Gus Psihoyos is recommending City Council adopt the attached resolution to accept the Public Improvement Construction Contract and to authorize the payment of the contract amount of $63,976.29 to Midwest Concrete, of Peosta, IA, for the 2024 Airport ADA Ramp Replacement Project. I concur with the recommendation and respectfully request Mayor and City Council approval. 1�,A� k�4 S��' Mic ael C. Van Milligen MCVM:sv Attachment cc: Crenna Brumwell, City Attorney Cori Burbach, Assistant City Manager Gus Psihoyos, City Engineer Jon Dienst, Civil Engineer II Todd Dalsing, Airport Manager Phil Grommet, Engineering Technician Page 509 of 1454 THE CITY OF DUB E Masterpiece on the Mississippi TO: Michael C. Van Milligen, City Manager FROM: Gus Psihoyos, City Engineer DATE: November 3, 2024 RE: 2024 Airport ADA Ramp Replacement PROJECT 5128000002 Dubuque All -America City ­ 2007.2012.2013 2017*2019 INTRODUCTION The attached resolution provides for the acceptance of the public improvement construction contract for the 2024 Airport ADA Ramp Replacement Project. BACKGROUND The ADA ramps at the Dubuque Regional Airport Terminal and parking lot were installed approximately 10 years ago. Since that time, the plastic ADA detectable warning tiles have been worn down or have broken in spots. The detectable warning panels are no longer compliant in many areas in front of the terminal and in the parking lots. DISCUSSION The 2024 Airport ADA Ramp Replacement Project was completed by Midwest Concrete in the final contract amount of $63,976.29, which is an 8.5% increase above the original contract amount of $58,987.40. The additional cost is due to additional concrete removal and replacement needed for the ADA ramp installation. RECOMMENDATION I recommend that the City Council accept the Public Improvements and authorized the payment of $63,976.29 to Midwest Concrete for the 2024 Airport ADA Ramp Replacement Project. BUDGETIMPACT The project cost for the 2024 Airport ADA Ramp Replacement Project is as follows: Page 510 of 1454 Description Award Final Construction Contract $ 58,987.40 $ 63,976.29 Contingency 6,327.00 0.00 Construction Engineering & Inspection 5,000.00 6,397.63 Total $74,314.40 $70,373.92 The project funding summary is as follows: CIP No. Fund Description Fund Amount 5128000002 Replace Warning Surface Pads $ 70,373.92 Total Project Funding $ 70,373.92 ACTION TO BE TAKEN The City Council is requested to adopt the attached resolution to accept the Public Improvement Construction Contract and to authorize the payment of the contract amount of $63,976.29 to Midwest Concrete, of Peosta, IA, for the 2024 Airport ADA Ramp Replacement Project. Prepared By: Jon Dienst, Civil Engineer II M. Todd Dalsing, Airport Manager Phil Grommet, Engineering Technician 2 Page 511 of 1454 Prepared by Jon Dienst City of Dubuque Engineering 50 W. 131" St. Dubuque IA 52001 (563)589-4270 Return to Adrienne N. Breitfelder City Clerk City of Dubuque, 50 W. 13`h St. Dubuque, IA 52001 (563)589-4100 RESOLUTION NO. 370-24 ACCEPTING THE 2024 AIRPORT ADA RAMP REPLACEMENT PROJECT AND AUTHORIZING FINAL PAYMENT TO THE CONTRACTOR WHEREAS, the Public Improvement Contract for the 2024 Airport ADA Ramp Replacement Project (the Project) has been completed by the contractor, Midwest Concrete (Contractor), and the City Engineer has examined the work and recommends that the Project be accepted; and WHEREAS, the final contract amount for the Project is $63,976.29; and WHEREAS, the Contractor has previously been paid $60,777.48, leaving a balance of $3,198.81; and WHEREAS, the City Council finds that the recommendation of the City Engineer should be accepted. NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: Section 1. The recommendation of the City Engineer is approved and the Project is hereby accepted. Section 2. The Director of Finance and Budget is hereby directed to pay the balance of the retainage of $3,198.81 as provided in Iowa Code chapter 573, and to pay such retainage in accordance with the provisions of Iowa Code chapter 573 or Iowa chapter 26.13. Passed, approved and adopted this 181h day of November 2024. Brad M. C agh, Mayor Attest: Adrienne N. Breitfelder, CMC City Clerk CITY ENGINEER'S CERTIFICATE OF FINAL COMPLETION OF THE 2024 AIRPORT ADA RAMP REPLACEMENT PROJECT The undersigned City Engineer of the City of Dubuque, Iowa, hereby certifies that he has inspected the 2024 Airport ADA Ramp Replacement Project and work has been performed in compliance with the terms of the Public Improvement Contract, and that the total cost of the completed work is $70,373.92. Dated this 8t" day of November 2024. Gus Psihoyos, City Engineer Filed in the office of the City Clerk on the 81" day of November 2024. i �I I i Pop It Adrienne N. Breitfelder, CIVIC City Clerk Page 513 of 1454