Bunker Hill Irrigation Replacement Project Phase 3 Public HearingCity of Dubuque City Council PUBLIC HEARINGS # 3. Copyrighted November 18, 2024 ITEM TITLE: Bunker Hill Irrigation Replacement Project Phase 3 Public Hearing SUMMARY: Proof of publication on notice of public hearing to consider City Counci approval of the construction plans and specifications, form of contract, and estimated cost of $360,000.00 for the Bunker Hill Irrigation Replacement Project Phase 3 through adoption of the attached resolution, and City Manager recommending approval. RESOLUTION Approval Of Plans, Specifications, Form Of Contract, And Estimated Cost For The Bunker Hill Irrigation Replacement Project Phase 3 SUGGUESTED Receive and File; Adopt Resolution(s) DISPOSITION: ATTACHMENTS: 1. MVM Memo 2. Staff Memo 3. Resolution Page 1295 of 1454 THE CITY OF Dubuque DuBE uFA�a9a av Masterpiece on the Mississippi rP PP zoo�•*o 13 2017202019 TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: Public Hearing Bunker Hill Irrigation Replacement Project Phase 3 DATE: November 14, 2024 Leisure Services Director Marie Ware is recommending City Council approve the construction plans and specifications, form of contract, and estimated cost of $360,000.00 for the Bunker Hill Irrigation Replacement Project Phase 3 through adoption of the attached resolution. I concur with the recommendation and respectfully request Mayor and City Council approval. Y Mic ael C. Van Milligen MCVM:sv Attachment cc: Crenna Brumwell, City Attorney Cori Burbach, Assistant City Manager Marie Ware, Leisure Services Director Page 1296 of 1454 THE CITY OF DUB E Masterpiece on the Mississippi TO: Michael C. Van Milligen, City Manager FROM: Marie L. Ware, Leisure Services Director Dubuque All -America City II 2007.2012.2013 2017*2019 SUBJECT: Public Hearing Bunker Hill Irrigation Replacement Project Phase 3 DATE: November 13, 2024 INTRODUCTION This memorandum requests the City Council conduct a public hearing for the Bunker Hill Irrigation Replacement Project Phase 3. BACKGROUND The irrigation system for the tees and greens was installed around 1980 and the fairway system was added in 1992. In Fiscal Year 2011 the satellite controllers, master control panel, variable speed pump, backflow preventer, pump shelter and electrical controls were replaced. This project was Phase 1. In Fiscal Year 2016, $205,000 in CIP funding was approved to hire a consultant to design, develop bid specs and monitor construction for the 18-hole golf course irrigation system. This replacement project was designed by JBC landscape architects into 2 phases. These we called Phases 2 and 3. Each phase was made up of 9 holes (half) of the course. This project included full replacement of both greens and fairway lines and heads. Phase 2 was completed in the Spring of 2016. The remaining PVC pipe has a life expectancy of 25 years in the ground. This means that the tees and greens were ready to be replaced in 2005 while the fairway lines have reached their expected lifespan. The PVC pipe is now brittle and cracks easily. We continue to see additional staff time fixing leaks as they occur more often as the system has aged. In FY20 there was $200,000 in CIP funds for Phase 3 of the project. The Council approved to initiate the bid process at their September 16, 2019 meeting. Bids were solicited in the Fall of 2019. Unfortunately, all bids received were over budget and therefore rejected. Page 1297 of 1454 DISCUSSION As designed, this project will result in efficiencies in overall water usage/monitoring, better irrigation coverage of the course, and the reduction in staff time due to lengthy repairs. These improvements will ultimately result in a better experience for the patrons. At the September 21, 2015 City Council Public Hearing, the Bunker Hill Irrigation Plans and Specs developed by landscape architects, JBC, were approved for both Phase 2 and Phase 3 of the project. During the construction of Phase 2, there were minor adjustments to the plans due to the rocky terrain as well as adjusted head locations for improved irrigation results. These adjustments will have little effect to the plans and scope of project for Phase 3. The goal for this final phase of the project is to begin construction in the Fall of 2025. Based on current supply and contractor schedules, a contract will need to be committed this winter in order to get this project on the schedule for next fall. Per Assistant City Attorney Jason Lehman, staff may retain the original approved architect for this project. PROJECT SCHEDULE The schedule for the project is as follows: Initiate Public Bidding Process & Set Public Hearing November 4, 2024 Publish Notice to Bidders November 5, 2024 Public Hearing November 18, 2024 Receipt of Bid Proposals November 27, 2024 Award Construction Contract December 16, 2024 Project Completion Date December 1, 2025 BUDGET IMPACT In FY25, there is currently $259,356 in CIP funding (Project #3444000011) to complete Phase 3 and finalize the irrigation replacement for the golf course. However, based on the current estimate of probable cost for the Bunker Hill Irrigation Project Phase 3, this project will cost closer to $360,000 including the up to $9,000 in construction administration fees for JBC. To cover the remaining balance, staff will be using available Golf Enterprise funding. Chief Financial Officer Jenny Larson approves of the use of the Golf Enterprise fund. The project cost estimate is as follows: Project Estimated Cost $ 360,000.00 Funding Sources Project #3444000011 $ 259,356.00 Golf Enterprise Funds $ 100,644.00 Page 1298 of 1454 RECOMMENDATION I respectfully request Mayor and City Council approve the construction plans and specifications, form of contract, and estimated cost for the Bunker Hill Irrigation Replacement Project Phase 3 through adoption of the attached resolution. Prepared by: Dan Kroger, Recreation Division Manager cc: Andy Unrau, Golf Course Superintendent Jenny Larson, Chief Financial Officer Jason Lehman, Assistant City Attorney Page 1299 of 1454 Prepared by Dan Kroger Recreation Division Manager, 2200 Bunker Hill Rd., Dubuque IA 52001 (563) 589-4310 Return to Adrienne N. Breitfelder, City Clerk, 50 W. 13' St., Dubuque, IA 52001, (563) 589-4100 RESOLUTION NO. 384-24 APPROVAL OF PLANS, SPECIFICATIONS, FORM OF CONTRACT, AND ESTIMATED COST FOR THE BUNKER HILL IRRIGATION REPLACEMENT PROJECT PHASE 3 ----VOWTREREFORE—,BE IT RESOLVED BY THE COTY COUNCIL OF THE CITY OF DUBUQUE, IOWA: That the proposed plans, specifications, form of contract and estimated cost for the Bunker Hill Irrigation Replacement Phase 3, in the estimated cost of $360,000, are hereby approved. Passed, adopted and approved this 18th day of November, 2024. r to-Cavanagh, Mayor Attest: i Adrienne N. Breitfelder, City Clerk NOTICE OF PUBLIC HEARING ON PLANS, SPECIFICATIONS, FORM OF CONTRACT, AND ESTIMATED COST FOR THE BUNKER HILL IRRIGATION PROJECT PHASE 3. NOTICE IS HEREBY GIVEN: The City Council of the City of Dubuque, Iowa will hold a public hearing on the proposed plans, specifications, form of contract and estimated cost for the Bunker Hill Irrigation Project Phase 3, in accordance with the provisions of Chapter 26, Code of Iowa, at 6:30 p.m., on the 18th day of November, 2024, in the Historic Federal Building Council Chambers (second floor) 350 W. 6th Street, Dubuque, Iowa. Said proposed plans, specifications, form of contract and estimated cost are now on file in the office of the City Clerk. At said hearing any interested person may appear and file objections thereto. The scope of the Project is as follows: This project will include the furnishing and install of phase 3 of a golf course irrigation plumbing and distribution system as shown in the bid specifications. The existing Toro OSMAC Irrigation Control System and satellite controllers shall be preserved. The project includes connections to existing pumping station and water supply, all electrical equipment and connections from the satellite controllers to the new irrigation heads as required to provide a complete and operational golf course irrigation system, as per city specifications. Any visual or hearing -impaired persons needing special assistance or persons with special accessibility needs should contact the City Clerk's office at (563) 589-4120 or TDD at (563) 690- 6678 at least 48 hours prior to the meeting. Published by order of the City Council given on the 4th day of November, 2024. Adrienne N. Breitfelder, City Clerk Page 1301 of 1454 I I i 1_� Q4A .04 *.6 Izc. t -'�4 STATE OF IOWA SS: DUBUQUE COUNTY CERTIFICATE OF PUBLICATION I, Kathy Goetzinger, a Billing Clerk for Woodward Communications, Inc., an Iowa corporation, publisher of the Telegraph Herald, a newspaper of general circulation published in the City of Dubuque, County of Dubuque and State of Iowa; hereby certify that the attached notice was published in said newspaper on the following dates: 11/08/2024 and for which the charge is 47.31 S bscribed to before me, a Notary Public in an or Dubuque County, Iowa, this 8th day of November, 2024 .,t KI Notary u is in and for Dubuque County, Iowa. JANET K. PAPE r T Commission Number 199669 My Commission Expire, +owe 12/11/2025 Ad text : CITY OF DUBUQUE, IOWA OFFICIAL NOTICE NOTICE OF PUBLIC HEARING ON PLANS, SPECIFICATIONS, FORM OF CONTRACT, AND ESTIMATED COST FOR THE BUNKER HILL IRRIGATION PROJECT PHASE 3. NOTICE IS HEREBY GIVEN: The City Council of the City of Dubuque, Iowa will hold a public hearing on the proposed plans, specifications, form of contract and estimated cost for the Bunker Hill Irrigation Project Phase 3, in accordance with the provisions of Chapter 26, Code of Iowa, at 6:30 p.m., on the 18th day of November, 2024, in the Historic Federal Building Council Chambers (second floor) 350 W. 6th Street, Dubuque, Iowa. Said proposed plans, specifications, form of contract and estimated cost are now on file in the office of the City Clerk. At said hearing any interested person may appear and file objections thereto. The scope of the Project is as follows: This project will include the furnishing and install of phase 3 of a golf course irrigation plumbing and distribution system as shown in the bid specifications. The existing Toro OSMAC Irrigation Control System and satellite controllers shall be preserved. The project includes connections to existing pumping station and water supply, all electrical equipment and connections from the satellite controllers to the new irrigation heads as required to provide a complete and operational golf course irrigation system, as per city specifications. At the meeting, the City Council will receive oral and written comments from any resident or property owner of said City to the above action. The official City Council agenda will be posted the Friday before the meeting and will contain public input options. The agenda can be accessed at https://dubuqueia.portal.civicclerk.com/ or by contacting the City Clerk's Office at 563-589-4100, ctyclerk@cityofdubuque.org. Written comments on the public hearing may be submitted to the City Clerk's Office by email at ctyclerk@cityofdubuque.org or by mail to City Hall, 50 W. 13th St., Dubuque, IA 52001, before the scheduled hearing. The City Council will review all written comments at the time of the hearing. Documents related to the public hearing are on file in the City Clerks Office and may be viewed Monday through Friday between 8:00 a.m. and 5:00 p.m. Individuals requiring special assistance should contact the City Clerk's Office as soon as feasible. Deaf or hard -of -hearing individuals can use Relay Iowa by dialing 711 or (800) 735-2942. Published by order of the City Council given on the 4th day of November 2024. Adrienne N. Breitfelder, CMC, City Clerk It 11/8