Loading...
Seippel Road Water Main Lowering Project - Acceptance of Copyrighted December 2, 2024 City of Dubuque CONSENT ITEMS # 10. City Council ITEM TITLE: Seippel Road Water Main Lowering Project - Acceptance of Public Improvement Construction Contract - Project Code: 4281000059 SUMMARY: City Manager recommending City Council adopt the attached resolution to accept the Public Improvement Construction Contract and to authorize the payment of the contract amount of$172,651.98 to Top Grade Excavating, Inc. of Farley, lowa, for the Seippel Road Water Main Lowering Project. RESOLUTION Accepting The Seippel Road Water Main Lowering Project And Authorizing Final Payment To The Contractor SUGGUESTED Receive and File; Adopt Resolution(s) DISPOSITION: ATTACHMENTS: 1. MVM Memo 2. Seippel Road Water Main Lowering Project - Acceptance Memo 3. Seippel Road Water Main Lowering Project - Acceptance Resolution 4. 3 Engineer's Certificate of Completion 5. Kwik Trip Reimbursement Breakdown 6. 2023-12-18 City Kwik Trip Dev Agreement - Seippel Airborne Intersection - Fully Executed Page 163 of 645 Dubuque THE CITY OF � uhA�eMa cin DuB E ; . � , I � � I. Maste iece on the Mississi t 2oo�•zoiz•zois �P Pp zoi�*zoi9 TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: Seippel Road Water Main Lowering Project Acceptance of Public Improvement Construction Contract Project Code: 4281000059 DATE: November 25, 2024 City Engineer Gus Psihoyos is recommending City Council adopt the attached resolution to accept the Public Improvement Construction Contract and to authorize the payment of the contract amount of$172,651.98 to Top Grade Excavating, Inc. of Farley, lowa, for the Seippel Road Water Main Lowering Project. I concur with the recommendation and respectfully request Mayor and City Council approval. � Mic ael C. Van Milligen MCVM:sv Attachment cc: Crenna Brumwell, City Attorney Cori Burbach, Assistant City Manager Gus Psihoyos, City Engineer Page 164 of 645 Dubuque THE CITY OF � All•Anerica Ciry DuB E ;� . , I � � I. Maste iece on the Mississi i Zoo�.zo�z.zo�3 �`p pp zoi�*zoi9 TO: Michael C. Van Milligen, City Manager FROM: Gus Psihoyos, City Engineer DATE: November 22, 2024 SUBJECT: Seippel Road Water Main Lowering Project Acceptance of Public Improvement Construction Contract Project Code: 4281000059 INTRODUCTION The enclosed resolution provides for the acceptance of the Public Improvement Construction Contract for the Seippel Road Water Main Lowering Project located at the intersection of Seippel and Airborne Road. BACKGROUND By Resolution 411-23 on December 18, 2023, City Council approved an agreement between the City of Dubuque and Kwik Trip, Inc. (KTI) for construction of certain off-site public roadway and utility improvements at the intersection of Seippel Road and Airborne Road related to the proposed site improvements by KTI. A copy of the agreement and Council memos are attached. KTI is developing an 8.3-acre site located at the southeast quadrant of the intersection of Seippel Road and Airborne Road. The proposed site development includes a KTI convenience store and gas station which will include both car/truck and semi fueling stations. During the site plan review process, the City requested that KTI hire a consultant to perform a Traffic Impact Study due to the fact that convenience stores and gas stations are high traffic generator land uses. Based on projected growth and development in the surrounding areas, the traffic study recommended that future capacity improvements may be warranted at the existing intersection of Seippel and Airborne roads, which could include adding traffic signals with geometric modifications (additional thru and turn lanes). As an alternate preferred option, the City is planning for the development of a roundabout intersection at this location, which will meet the same standards of traffic signals. In coordination with the Kwik Trip site construction schedule, the City also planned to lower the existing watermain and fiber optics utility, along with associated grading, on the south side of Seippel Road just east of its intersection with Airborne Road to accommodate construction of future intersection improvements at Seippel and Airborne. In addition, the City offered KTI the option to lower the existing watermain and fiber Page 165 of 645 optics utility, along with associated grading, along the remainder of the KTI site's northern frontage to increase visibility to their site as part of the City project and KTI agreed. KTI is responsible for reimbursing the City their share the actual construction costs of the watermain, fiber optics, and grading project for their share in accordance with the agreement per Resolution 411-23 between City of Dubuque and KTI. DISCUSSION The Seippel Road Water Main Lowering Project was completed by Top Grade Excavating, Inc. of Farley, lowa in the final contract amount of $172,651.98 which is a 7.3% decrease from the original contract in the amount of$186,275.20. The improvements included the following: • Installation of approximately 500-feet of 12-inch ductile iron water main • The new water main was installed at a lower depth and the existing water main will be removed and salvaged • Installation of 2 fire hydrants • Installation of a 12-inch water main stub for the extension of 12-inch water main along the Airborne Road frontage by KTI. • Installation of a 6-inch water main stub for the extension of a 6-inch water service line by KTI to service their site. • Lowering of approximately 100 feet of City fiber optic conduit • Excavating and hauling approximately 2,300 cubic yards of soil to an off-site location to complete the associated grading. RECOMMENDATION I recommend that the City Council accept the Public Improvements and authorize the payment of $172,651.98 to Top Grade Excavating, Inc. for the Seippel Road Water Main Lowering Project. BUDGET IMPACT The project cost summary for the Seippel Road Water Main Lowering Project is as follows: Description Estimate Award Final Construction Contract $ 258,000.00 $186,275.20 $172,651.98 Contingency $25,800.00 $25,800.00 $00.00 Engineering & Inspection $38,700.00 $38,700.00 $18,280.24 Total Construction Cost $ 322,500.00 $ 250,775.20 $ 190,932.22 Page 166 of 645 The project funding summary is as follows: Project No. Fund Description Fund Amount 4281000059 Seippel Rd. Watermain Lowering $101,769.41 Kwik Trip Contribution $89,162.81 Total Project Funding $ 190,932.22 Upon final acceptance, an invoice for reimbursement will be sent to KTI in the amount of $89,162.81 for their share of the project in accordance with the agreement per Resolution 411-23 between City of Dubuque and KTI. A copy of the reimbursement breakdown is attached. ACTION TO BE TAKEN The City Council is requested to adopt the attached resolution to accept the Public Improvement Construction Contract and to authorize the payment of the contract amount of $172,651.98 to Top Grade Excavating, Inc. of Farley, lowa, for the Seippel Road Water Main Lowering Project. Attach. Prepared by: Nathan Steffen, Civil Engineer cc: Chris Lester, Water Department Director Jenny Larson, Chief Financial Officer Bob Schiesl, Assistant City Engineer Nate Kieffer, Land Surveyor Charlie Gau, Water Engineering Assistant Trent Kastenschmidt, Kwik Trip, Inc. Troy Mleziva, Kwik Trip, Inc. Page 167 of 645 Prepared by Gus Psihovos City of Dubuque Engineering 50 W. 13" St. Dubuque IA 52001 (563)589-4270 Return to Adrienne N. Breitfelder City Clerk City of Dubuque, 50 W. 13'" St. Dubuque, IA 52001 (563)589-4100 RESOLUTION NO. 390-24 ACCEPTING THE SEIPPEL ROAD WATER MAIN LOWERING PROJECT AND AUTHORIZING FINAL PAYMENT TO THE CONTRACTOR WHEREAS, the public improvement contract for the Seippel Road Water Main Lowering Project, (the Project) has been completed by the Contractor, Top Grade Excavating, Inc. of Farley Iowa (Contractor), the City Engineer has examined the work and recommends that the Project be accepted; and WHEREAS, the final contract amount for the Project is $172,651.98; and WHEREAS, the Contractor has previously been paid $164,019.38, leaving a balance of $8,632.60; and WHEREAS, the City Council finds that the recommendation of the City Engineer should be accepted. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: Section 1. The recommendation of the City Engineer is approved, and the Project is hereby accepted. Section 2. The Finance Director is hereby directed to pay the Contractor for the balance of the retainage of $8,632.60 as provided in Iowa Code chapter 573, and to pay such retainage in accordance with the provisions of Iowa Code chapter 573 or Iowa Code chapter 26.13. Passed, approved and adopted this 2nd day of December 2024. Attest: Adrienne N. Breitfelder, City Clerk P-'a Wwz�- - • � 1a . . CITY ENGINEER'S CERTIFICATE OF FINAL COMPLETION OF THE SEIPPEL ROAD WATER MAIN LOWERING PROJECT The undersigned City Engineer of the City of Dubuque, lowa, hereby certifies that he has inspected the Seippel Road Water Main Lowering Project and work has been performed in compliance with the terms of the Public Improvement Contract, and that the total cost of the completed work is $190,932.22. Dated this 22nd day of November 2024. Gus Psihoyos, City Engineer Filed in the office of the City Clerk on the 22�d day of November 2024. i� � � i ,,7 'i. >, >., / � . , 'j, ' 'i' . � . Adrienne N. Breitfelder, CMC City Clerk Page 169 of 645 THECITYOF Gity of Dubuque, ��Wa Reinbursement DuB E Masterpiece on the Mississippi Seippel Road Water Main Lowering CONTRACT COST CITY OF DUBUQUE PORTION KWIK TRIP PORTION LINE BID ITEM DESCRIPTION NO. QUANTITY UNIT UNIT COST Percent QUANTITY AMOUNT Percent QUANTITY AMOUNT Comments Responsibility Responsibility � Division 2010 - Earthwork, Subgrade, and Subbase ' 1 Topsoil, On-site ' 743.00 CY ' $ 6.40 ' CY 50% 371.50 ; $ 2,377.60 ' 50% 371.50 $ 2,377.60 2 Excavation, Class 10 1850.00 CY ; $ 7.10 ' CY 50% 925.00 ; $ 6,567.50 ' 50% 925.00 $ 6,567.50 Division 3010 - Trench Excavation and Backfill ' ' 3 Replacement of Unsuitable Backfill Material, Gr 30, (Modified Subbase � 363.32 TON ; $ 7.90 ' TON 50°/o 181.66 ; $ 1,435.11 ' 50% 181.66 $ 1,435.11 4 Trench Compaction Testing 1.00 j � LS ' $ 1,000.00 � LUMP SUM ' 50% 0.50 ; $ 500.00 ' 50% 0.50 $ 500.00 5 Class I, Bedding Material, 1° Commercial Clean Stone 216.08 TON ; $ 35.00 ' TON 50% 108.04 ; $ 3,781.40 50% 108.04 $ 3,781.40 Division 5010 - Pipe and Fittings 6 Water Main, Trenched, DIP, 6" 24.25 LF ; $ 59.00 LF 0% 0.00 i $ - ' 100% 24.25 $ 1,430.75 KwikStarPrivateServiceLine ' Kiwk Star 50%of 533.25' & 6" Equivalent Price(43.9%)of 18' Airborne Stub to South. (6" Material Price$29 per foot from Switch Homes Invoice 7-26-24, 12" Material Price of$66 per 7 Water Main, Trenched, DI P, 12° 551.25 LF $ 100 00 LF 50% 276.73 � $ 27,672.75 50% 274.52 $ 27,452.25 foot from Seippel Quote 5-29-24--29/66=43.9% 8 Fittings, DI Tee, 12x6 1.00 EA $ 764.00 EACH 0% 0.00 ; $ - ' 100% 1.00 $ 764.00 Kwik Star Private Service Line ' 50%of Tee Crossing Seippel;76J%of Tee Stub to Airborne, � o o based on equivalent price for 12x6 Tee, per item#8 9 Fittings, DI Tee, 12x12 2.00 EA $ 996 00 EACH 38/0 0.77 ! $ 763.99 ' 62/0 1.23 $ 1,228.01 10 Fittings, DI Bend, 11 1/4 Deg, 12" 1.00 EA $ 587 00 ; EACH 50% 0.50 ; $ 293.50 ' 50% 0.50 $ 293.50 11 Fittings, DI Bend, 22 1/2 Deg, 12" 1.00 EA $ 607.00 ; EACH 50% 0.50 '; $ 303.50 ' 50% 0.50 $ 303.50 12 Fittings, DI Bend, 45 Deg, 12° 2.00 EA $ 678.00 : EACH 50% 1.00 ; $ 678.00 ' 50% 1.00 $ 678.00 13 Fittings, DI Cap or Plug, 6" 1.00 EA $ 229 00 EACH 0% 0.00 i $ - ' � 100% 1.00 $ 229.00 I ' Kiwk Star 63.7%(Price for 6"Cap) Based on equivalent price 14 Fittings, DI Cap or Plug, 12" 1.00 EA $ 359 00 : EACH 36% 0.36 ; $ 130.32 ' 64% 0.64 $ 22g.gg for 6"Cap, per item#13 15 Fittings, DI Sleeve, 12" 2.00 EA $ 250.00 EACH 50% 1.00 ; $ 250.00 ' 50% 1.00 $ 250.00 16 Joint Restraint, Bell Harness, 12" 1.00 EA $ 893.00 ! EACH 50% 0.50 ; $ 446.50 ' 50% 0.50 $ 446.50 17 Joint Restraint, Mega lug, 6" 4.00 EA $ 218.00 � EACH 0% 0.00 ; $ - ' 100% 4.00 $ 872.00 18 Joint Restraint, Mega lug, 12" 31.00 EA $ 382 00 ; EACH 50% 15.50 ' $ 5,921.00 ' 50% 15.50 $ 5,921.00 19 Water Main Removal 514.00 LF $ 10.00 � LF 50% 257.00 $ 2,570.00 ' 50% 257.00 $ 2,570.00 20 Removal and Salvage - Water Main Fittings and Appurtenances 1.00 LS ; $ 1,500.00 LUMP SUM j 50% 0.50 ; $ 750.00 ' 50% 0.50 $ 750.00 Division 5020 - Valves, Fire Hydrants, and Appurtenances ' 21 ' Valve, Gate, 6" ' 1.00 EA ; $ 2,036.00 EACH 0% 0.00 ; $ - 100% 1.00 $ 2,036.00 Kwik Star Private Service Line 22 'Valve, Gate, 12" 4.00 EA $ 4,568.00 ; EACH 50% 2.00 ; $ 9,136.00 ' 50% 2.00 $ 9,136.00 23 Fire Hydrant ' 2.00 EA ' ; $ 8,929.00 ' EACH 50% 1.00 ; $ 8,929.00 ' 50% 1.00 $ 8,929.00 24 Fire Hydrant Assembly Removal 2.00 EA $ 286.00 EACH 50% 1.00 ; $ 286.00 ' 50% 1.00 $ 286.00 Division 8030 - TemporaryTraffic Control ' 25 Temporary Traffic Control 1.00 LS ; $ 2,350.00 ' LUMP SUM : 50% 0.50 ; $ 1,175.00 ' 50% 0.50 $ 1,175.00 Division 9010 - Seeding ' 26 Conventional - Seeding, Type 4, by AC 0.39 AC $ 800.00 ' ACRE 50°/o 0.20 ; $ 156.00 50% 0.20 ' $ 156.00 27 Hydraulic - Seeding, Fertilizing, and Mulching, Type 1, by AC 0.00 AC ; $ 4,000.00 ACRE 50% 0.00 ; $ - ' 50% 0.00 $ - ' Division 9040 - Erosion and Sediment Control ' ' ' 28 Filter Socks, 12° 100.00 LF ; $ 3.00 LF 50°/a 50.00 $ 150.00 50% 50.00 $ 150.00 29 Filter Socks, Removal 100.00 LF $ 0.50 ! LF 50% 50.00 i $ 25.00 ' 50% 50.00 $ 25.00 30 Silt Fence or Silt Fence Ditch Check, Installation 660.00 LF $ 2.25 � LF 50% 330.00 ; $ 742.50 ' 50% 330.00 $ 742.50 31 �Silt Fence or Silt Fence Ditch Check, Removal of Sediment 0.00 LF $ 0.20 ; LF 50% 0.00 ; $ - ' 50% 0.00 $ - 32 Silt Fence or Silt Fence Ditch Check, Removal of Device 0.00 LF $ 0.20 � LF 50% 0.00 ! $ - ' 50% 0.00 $ - 33 Stabilized Construction Entrance by Ton 0.00 TON $ 24 00 TON 50% 0.00 ; $ - ' 50% 0.00 $ - 34 Erosion Control Mulching, Conventional Mulching, by AC � 0.39 AC ; $ 800.00 � ACRE 50% 0.20 ' $ 156.00 ' 50% 0.20 $ 156.00 35 Inlet Protection Device, Installation 4.00 EA $ 150.00 � EACH 50% 2.00 ; $ 300.00 ' 50% 2.00 $ 300.00 36 'Inlet Protection Device, Maintenance ' 4.00 EA ' ; $ 25.00 EACH 50% 2.00 ; $ 50.00 ' 50% 2.00 $ 50.00 Division 11,020 - Mobilization : 37 'Mobilization 1.00 LS ; $ 14,205.00 LUMP SUM ' 50% 0.50 ; $ 7,102.50 ' 50% 0.50 $ 7,102.50 'Special Provisions - Non-Standard Project Items 38 Lower/Relocate Existing Fiber Conduit 105.00 LF ; $ 16.00 LF 50% 52.50 ; $ 840.00 ' 50% 52.50 $ 840.00 Engineering & Inspection 100% $ 18,280.24 � City Total ; $ 101,769.41 Kwik Trip Total $ 89,162.81 Page 170 of 645