Kerper Boulevard Lift Station Project - Award Public Copyrighted
December 2, 2024
City of Dubuque ACTION ITEMS # 1.
City Council
ITEM TITLE: Kerper Boulevard Lift Station Project - Award Public
Improvement Contract - Project No. 5581500047
SUMMARY: City Manager recommending City Council award the Public
Improvement Construction Contract for the Kerper Boulevard
Lift Station Project to Tschiggfrie Excavating Co. in the
amount of$1,843,385.90, which is 13.06% over the
engineers estimate.
RESOLUTION Awarding Public Improvement Construction
Contract For The Kerper Boulevard Lift Station Project
SUGGUESTED Receive and File; Adopt Resolution(s)
DISPOSITION:
ATTACHMENTS:
1. MVM Memo
2. KerperBlvdLS - Award Staff Memo
3. Kerper Blvd Lift Station Project - Award Resolution
4. Bid Tabulation
5. Award Recommendation Letter - Kerper Blvd. Lift Station Replacement
Page 624 of 645
Dubuque
THE CITY OF �
uhA�eMa cin
DuB E ; . � ,
I � � I.
Maste iece on the Mississi t 2oo�•zoiz•zois
�P Pp zoi�*zoi9
TO: The Honorable Mayor and City Council Members
FROM: Michael C. Van Milligen, City Manager
SUBJECT: Kerper Boulevard Lift Station Project
Award Public Improvement Contract
Project No. 5581500047
DATE: November 25, 2024
City Engineer Gus Psihoyos is recommending City Council award the Public
Improvement Construction Contract for the Kerper Boulevard Lift Station Project to
Tschiggfrie Excavating Co. in the amount of$1,843,385.90, which is 13.06% over the
engineers estimate.
In October of 2023, the City Council approved the disposal of 5.25 acres of City
property located at the corner of Kerper Boulevard and Hawthorne Street to Union at
the Marina, LP and approved a development agreement with same. Per the agreement,
Union at the Marina, LP will construct buildings with 201 residential units at an
aggregate cost of approximately $45.7 million. And that they will use reasonable efforts
to start construction of the improvements within six (6) months of the closing date.
The existing sanitary sewer lift station located on Kerper Boulevard near the property to
be developed by Union at the Marina, LP was constructed in 1957. While the pumps
were replaced in 2005, the facility has reached the end of its design life as reflected by
the increased maintenance costs. The existing lift station cannot be upgraded to
accommodate the additional flows from the proposed development, or to accommodate
existing and future flows within the service area limits, within the constraints of the
existing structure. The project will be funded with an appropriation in the amount of
$1,498,266 for the design and construction of the Kerper Boulevard Lift Station Project,
with revenue from an American Rescue Plan Act (ARPA) grant from an allocation made
during FY24 Budget Amendment #2. An additional $300,000 of ARPA funding has been
requested to be reallocated to this project as part of FY25 Budget Amendment #1, for a
new project total funding of$1,798,266. Due to the uncertainty of recent construction
market bid prices, specifically with lift stations involving items with long supply chain
lead times, City staff has included a request for an additional $500,000 in funding as
part of the FY26 CIP requests.
I concur with the recommendation and respectfully request Mayor and City Council
approval.
Page 625 of 645
v
Mic ael C. Van Milligen
MCVM:sv
Attachment
cc: Crenna Brumwell, City Attorney
Cori Burbach, Assistant City Manager
Gus Psihoyos, City Engineer
Jenny Larson, Chief Financial Officer
Deron Muehring, Water & Resource Recovery Center Director
Bob Schiesl, PE, Assistant City Engineer
Todd Irwin, Engineering Technician
Maxwell O'Brien, Civil Engineer
2
Page 626 of 645
Dubuque
THE CITY OF �
All•Meriea Cip
DuB E �, �� �,� ��.
;� � ►
� �
Maste ZECE OYl tlle M2SSlSS1 1 2oo��zoiz�zois
�P pP zoi�*zoi9
TO: Michael C. Van Milligen, City Manager
FROM: Gus Psihoyos, City Engineer
DATE: November 22, 2024
SUBJECT: Kerper Boulevard Lift Station Project
Award Public Improvement Contract
Project No. 5581500047
INTRODUCTION
The purpose of this memorandum is to provide the City Council with information related
to the recommendation for awarding the Public Improvement Construction Contract for
the Kerper Boulevard Lift Station Project.
BACKGROUND
In October of 2023, the City Council approved the disposal of 5.25 acres of City
property located at the corner of Kerper Boulevard and Hawthorne Street to Union at
the Marina, LP and approved a development agreement with same. Per the agreement,
Union at the Marina, LP will construct buildings with 201 residential units at an
aggregate cost of approximately $45.7 million. And that they will use reasonable efforts
to start construction of the improvements within six (6) months of the closing date.
The existing sanitary sewer lift station located on Kerper Boulevard near the property to
be developed by Union at the Marina, LP was constructed in 1957. While the pumps
were replaced in 2005, the facility has reached the end of its design life as reflected by
the increased maintenance costs. The existing lift station cannot be upgraded to
accommodate the additional flows from the proposed development, or to accommodate
existing and future flows within the service area limits, within the constraints of the
existing structure. Therefore, a new lift station is proposed near the existing facility.
When complete, the existing lift station would be decommissioned.
DISCUSSION
On January 17, 2024, the City advertised a Request for Proposals (RFP) to retain a
professional service consultant to aid the City in evaluating the existing collection and
pumping systems that transport sanitary sewage in the Kerper Boulevard Lift Station
sewer service area, develop a facility plan with phased improvements to address
identified high risk infrastructure within the sewer service area, and to design and
construct the lift station replacement. On March 19, 2024, the City entered into a
contract with Origin Design, the selected consultant, for the engineering services to
design the replacement of the Kerper Boulevard Lift Station. The project design is
Page 627 of 645
complete, has received the lowa Department of Natural Resources (IDNR) wastewater
construction permits, and is ready for advertisement for construction.
BID RESULTS
The City received sealed bids on November 21, 2024, for the Kerper Boulevard Lift
Station Project. Tschiggfrie Excavating Co. submitted the low bid in the amount of
$1,843,385.90 which is 13.06% above the engineer's estimate. A summary of the bid
proposals received is as follows:
Contractor Name Total Bid
Tschiggfrie Excavating Co. $1,843,385.90
Top Grade Excavating $1,876,704.14
Portzen Construction, Inc. $2,633,840.68
RECOMMENDATION
I recommend that the public improvement contract for the Kerper Boulevard Lift Station
Project be awarded to Tschiggfrie Excavating Co. of Dubuque, IA in the amount of
$1,843,385.90.
BUDGET IMPACT
The estimate of probable cost for the Kerper Boulevard Lift Station Project is
summarized as follows:
Description Estimate Award
Plannin & Desi n * $ 202,100.00 $202,100.00
Construction $ 1,626,615.00 $1,843,385.90
Contin enc $ 243,992.25 $184,338.59
Contract Admin / Construction En ineerin * $ 45,200.00 $45,200.00
Total Project Cost 2.117.907.25 2.275.024.49
(Note: The indicated consultant services phases of the project are already contracted with Origin
Design and are funded costs utilized ARPA funding)
The project will be funded with an appropriation in the amount of $1,498,266 for the
design and construction of the Kerper Boulevard Lift Station Project [Project
5581500047], with revenue from an American Rescue Plan Act (ARPA) grant from an
allocation made during FY24 Budget Amendment #2. An additional $300,000 of ARPA
funding has been requested to be reallocated to this project as part of FY25 Budget
Amendment #1, for a new project total funding of $1,798,266. Due to the uncertainty of
recent construction market bid prices, specifically with lift stations involving items with
long supply chain lead times, City staff has included a request for an additional
$500,000 in funding as part of the FY26 CIP requests.
2
Page 628 of 645
Kerper Boulevard Lift Station Project Funding
5581500047 Kerper Lift Station Sanitary Sewer �1,798,266.00
Improvements (FY25 ARPA)
5581500047 Kerper Lift Station Sanitary Sewer �500,000.00
Improvements (FY26 Request)
Total Project Funding 2.298.266.00
ACTION TO BE TAKEN
I respectfully request that the City Council award the Public Improvement Construction
Contract for the Kerper Boulevard Lift Station Project to Tschiggfrie Excavating Co. in
the amount of $1,843,385.90 through the adoption of the attached resolution.
Prepared by Maxwell O'Brien, Civil Engineer
cc: Jenny Larson, Chief Financial Officer
Deron Muehring, Water & Resource Recovery Center Director
Bob Schiesl, PE, Assistant City Engineer
Todd Irwin, Engineering Technician
3
Page 629 of 645
Prepared by Kerry Bradley City of Dubuque Engineering 50 W. 13" St Dubuque IA 52001 (563)589-4270
Return to Adrienne N. Breitfelder City Clerk City of Dubuque, 50 W. 1311 St. Dubuque, IA 52001 (563)589-4100
RESOLUTION NO. 397-24
AWARDING PUBLIC IMPROVEMENT CONSTRUCTION CONTRACT FOR THE
KERPER BOULEVARD LIFT STATION PROJECT
WHEREAS, sealed proposals have been submitted by contractors for the Kerper
Boulevard Lift Station Project, (the Project) pursuant to Resolution No. 334-24 and Notice
to Bidders published on the City of Dubuque, Iowa website and plan room service with
statewide circulation on the 23rd day of October 2024; and
WHEREAS, said sealed proposal was opened and read on the 21s' day of
November 2024 and it has been determined that Tschiggfrie Excavating Co., of Dubuque,
Iowa submitted low bid in the amount of $1,843,385.90, and is the lowest responsive,
responsible bidder for the Project.
NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY
OF DUBUQUE, IOWA:
SECTION 1. That a Public Improvement Construction Contract for the Project is
hereby awarded to Tschiggfrie Excavating Co. and the City Manager is hereby directed
to execute a Public Improvement Construction Contract on behalf of the City of Dubuque
for the Project.
Passed, adopted, and approved this 2nd day of December 2024.
Brad M a nagh, Mayor
Attest:
Adrienne N. Breitfelder,"City Clerk
THE CITY OF
DUB E
Masterpiece on the Mississippi
City of Dubuque,lowa
Bid Tabulation
Project Title: Kerper Boulevard Lift Station Replacement Bid Date Engineer's Estimate Tschiggfrie Excavating Co. Top Grade Excavating,Inc. Portzen Construction,Inc.
11/21/2024
LINE REFERENCE PLAN ESTIMATED BID BID BID
NO. NUMBER BID ITEM DESCRIPTION (�UANTITY UNIT UNIT PRICE TOTAL PRICE UNIT PRICE TOTAL PRICE UNIT PRICE TOTAL PRICE UNIT PRICE TOTAL PRICE
Division 2010-Earthwork,Subgrade,and Subbase
1 2010-108-C-0 Clearing and Grubbing C 1 LS $ 2,000.00 $ 2,000.00 $ 2,000.00 $ 2,000.00 $ 500.00 $ 500.00 $ 1,500.00 $ 1,500.00
2 2010-108-D-1 Topsoil,On-site 55.8 CY $ 15.00 $ 837.00 $ 10.00 $ 558.00 $ 44.50 $ 2,483.10 $ 28.20 $ 1,573.56
3 2010-108-H-0 Granular Stabilization,3"Breaker Run(Modified Macadam) 40 TON $ 25.00 $ 1,000.00 $ 20.00 $ 800.00 $ 19.50 $ 780.00 $ 95.25 $ 3,810.00
4 2010-108-J-0 Subbase,Special Backfill-Gr 30(3/4"Dense Base Pile) 796 TON $ 25.00 $ 19,900.00 $ 19.00 $ 15,124.00 $ 19.50 $ 15,522.00 $ 24.00 $ 19,104.00
5 2010-108-M-0 Compaction Testing 1 LS $ 4,000.00 $ 4,000.00 $ 5,800.00 $ 5,800.00 $ 5,000.00 $ 5,000.00 $ 2,612.50 $ 2,612.50
Sub Total $ 27,737.00 Sub Total $ 24,282.00 Sub Total $ 24,285.10 Sub Total $ 28,600.06
Division 2020-Contaminated Soil and Groundwater Handling
6 2020-108-C-0 Dewatering,Lowering Groundwater Levels 21 Days $ 5,000.00 $ 105,000.00 $ 10,800.00 $ 226,800.00 $ 21,775.00 $ 457,275.00 $ 11,278.90 $ 236,856.90
Sub Total $ 105,000.00 Sub Total $ 226,800.00 Sub Total $ 457,275.00 Sub Total $ 236,856.90
Division 3010-Trench Excavation and Backfill
7 3010-108-D-0 Replacement of Unsuitable Backfill Material,Gr 30,(Modified Subbase Pile) 8700 TON $ 30.00 $ 261,000.00 $ 12.00 $ 104,400.00 $ 16.50 $ 143,550.00 $ 25.00 $ 217,500.00
8 3010-108-G-0 Class I,Bedding Material, 1"Commercial Clean Stone 355 TON $ 30.00 $ 10,650.00 $ 16.00 $ 5,680.00 $ 47.00 $ 16,685.00 $ 29.00 $ 10,295.00
Sub Total $ 271,650.00 Sub Total $ 110,080.00 Sub Total $ 160,235.00 Sub Total $ 227,795.00
Division 4010-Sanitary Sewers
9 4010-108-A-1 Sanitary Sewer Gravity Main,Trenched,8"PVC SDR26 141 LF $ 60.00 $ 8,460.00 $ 78.00 $ 10,998.00 $ 98.50 $ 13,888.50 $ 234.13 $ 33,012.33
10 4010-108-A-1 Sanitary Sewer Gravity Main,Trenched, 15"PVC SDR26 286.6 LF $ 100.00 $ 28,660.00 $ 120.00 $ 34,392.00 $ 164.00 $ 47,002.40 $ 304.81 $ 87,358.55
11 4010-108-A-1 Sanitary Sewer Gravity Main,Trenched, 16"PVC C900 28.5 LF $ 100.00 $ 2,850.00 $ 300.00 $ 8,550.00 $ 212.00 $ 6,042.00 $ 729.65 $ 20,795.03
12 4010-108-C-1 Sanitary Sewer Force Main,Trenched,8"PVC C900 832 LF $ 60.00 $ 49,920.00 $ 38.00 $ 31,616.00 $ 54.50 $ 45,344.00 $ 44.32 $ 36,874.24
13 4010-108-L-0 SanitarySewerAbandonment, Fill and Plug 7.4 CY $ 250.00 $ 1,850.00 $ 270.00 $ 1,998.00 $ 82.50 $ 610.50 $ 250.00 $ 1,850.00
14 4010-108-T-0 Fittings,DI Bend,45 Deg,8" 13 EA $ 500.00 $ 6,500.00 $ 710.00 $ 9,230.00 $ 696.00 $ 9,048.00 $ 884.00 $ 11,492.00
15 4010-108-T-0 Fittings,DI Sleeve,8" 2 EA $ 500.00 $ 1,000.00 $ 710.00 $ 1,420.00 $ 645.00 $ 1,290.00 $ 934.00 $ 1,868.00
16 4010-108-U-0 Joint Restraint,Mega lug,8" 30 EA $ 150.00 $ 4,500.00 $ 340.00 $ 10,200.00 $ 237.00 $ 7,110.00 $ 120.00 $ 3,600.00
Sub Total $ 103,740.00 Sub Total $ 108,404.00 Sub Total $ 130,335.40 Sub Total $ 196,850.14
Division 5010-Pipe and Fittings
17 5010-108-A-1 Water Main,Trenched,DIP,6" 111 LF $ 100.00 $ 11,100.00 $ 100.00 $ 11,100.00 $ 144.00 $ 15,984.00 $ 106.58 $ 11,830.38
18 5010-108-C-1 Fittings,DI Bend,90 Deg,6" 1 EA $ 300.00 $ 300.00 $ 330.00 $ 330.00 $ 254.00 $ 254.00 $ 491.50 $ 491.50
19 5010-108-C-3 Joint Restraint,Bell Harness,6" 3 EA $ 200.00 $ 600.00 $ 370.00 $ 1,110.00 $ 227.00 $ 681.00 $ 140.00 $ 420.00
20 5010-108-C-3 Joint Restraint,Mega lug,6" 4 EA $ 150.00 $ 600.00 $ 660.00 $ 2,640.00 $ 210.00 $ 840.00 $ 95.00 $ 380.00
Sub Total $ 12,600.00 Sub Total $ 15,180.00 Sub Total $ 17,759.00 Sub Total $ 13,121.88
Division 5020-Valves,Fire Hydrants,and Appurtenances
21 5020-108-B-0 Tapping Valve Assembly,6" 1 EA $ 6,000.00 $ 6,000.00 $ 4,800.00 $ 4,800.00 $ 5,277.00 $ 5,277.00 $ 3,948.00 $ 3,948.00
22 5020-108-C-0 Fire Hydrant 1 EA $ 6,000.00 $ 6,000.00 $ 8,400.00 $ 8,400.00 $ 6,774.00 $ 6,774.00 $ 6,417.00 $ 6,417.00
Sub Total $ 12,000.00 Sub Total $ 13,200.00 Sub Total $ 12,051.00 Sub Total $ 10,365.00
Division 6010-Structures for Sanitary and Storm Sewers
23 6010-108-A-0 Manhole Type,48"SW-301 73 VF $ 600.00 $ 43,800.00 $ 590.00 $ 43,070.00 $ 462.00 $ 33,726.00 $ 1,292.75 $ 94,370.75
Sub Total $ 43,800.00 Sub Total $ 43,070.00 Sub Total $ 33,726.00 Sub Total $ 94,370.75
Page 631 of 645
Project Title: Kerper Boulevard Lift Station Replacement Bid Date Engineer's Estimate Tschiggfrie Excavating Co. Top Grade Excavating,Inc. Portzen Construction,Inc.
11/21/2024
LINE REFERENCE PLAN ESTIMATED BID BID BID
NO. NUMBER BID ITEM DESCRIPTION (�UANTITY UNIT UNIT PRICE TOTAL PRICE UNIT PRICE TOTAL PRICE UNIT PRICE TOTAL PRICE UNIT PRICE TOTAL PRICE
Division 7010-Portland Cement Concrete Pavement
24 7010-108-E-0 Curb and Gutter,30"(Width),8"(Thickness) 249 LF $ 40.00 $ 9,960.00 $ 33.00 $ 8,217.00 $ 40.00 $ 9,960.00 $ 31.51 $ 7,845.99
Sub Total $ 9,960.00 Sub Total $ 8,217.00 Sub Total $ 9,960.00 Sub Total $ 7,845.99
Division 7020-Hot Mix Asphalt Pavement
25 7020-108-B-0 HMA Pavement by Square Yards,9"(Thickness) 1109 SY $ 40.00 $ 44,360.00 $ 67.00 $ 74,303.00 $ 61.50 $ 68,203.50 $ 64.58 $ 71,619.22
Sub Total $ 44,360.00 Sub Total $ 74,303.00 Sub Total $ 68,203.50 Sub Total $ 71,619.22
Division 7030-Sidewalks,Shared Use Paths,and Driveways
26 7030-108-B-0 Removal of Curb 249 LF $ 5.00 $ 1,245.00 $ 5.20 $ 1,294.80 $ 7.30 $ 1,817.70 $ 13.66 $ 3,401.34
27 7030-108-H-1 Driveway,Paved,PCC,8"(Thickness) 265 SY $ 150.00 $ 39,750.00 $ 67.00 $ 17,755.00 $ 75.00 $ 19,875.00 $ 140.00 $ 37,100.00
28 7030-108-H-3 Driveway,Granular by Ton 414 TON $ 35.00 $ 14,490.00 $ 17.00 $ 7,038.00 $ 17.50 $ 7,245.00 $ 19.00 $ 7,866.00
Sub Total $ 55,485.00 Sub Total $ 26,087.80 Sub Total $ 28,937.70 Sub Total $ 48,367.34
Division 7040-Pavement Rehabilitation
29 7040-108-A-0 Full Depth Patches HMA,7"(Thickness) 169 SY $ 50.00 $ 8,450.00 $ 51.00 $ 8,619.00 $ 47.75 $ 8,069.75 $ 50.14 $ 8,473.66
30 7040-108-H-0 Pavement-Removal 1109 SY $ 15.00 $ 16,635.00 $ 3.70 $ 4,103.30 $ 6.90 $ 7,652.10 $ 8.00 $ 8,872.00
Sub Total $ 25,085.00 Sub Total $ 12,722.30 Sub Total $ 15,721.85 Sub Total $ 17,345.66
Division 8010-Traffic Signals 8 Lighting
31 8010-108-H-0 Conduit,PVC,2" 160 LF $ 10.00 $ 1,600.00 $ 39.00 $ 6,240.00 $ 29.50 $ 4,720.00 $ 12.34 $ 1,974.40
32 8010-108-H-0 Conduit,Microduct, HDPE, 16/12 560 LF $ 5.00 $ 2,800.00 $ 2.30 $ 1,288.00 $ 2.13 $ 1,192.80 $ 4.88 $ 2,732.80
33 8010-108-J-0 Wiring and Cable-Fiber Optics,72 Strand 560 LF $ 4.00 $ 2,240.00 $ 22.00 $ 12,320.00 $ 20.37 $ 11,407.20 $ 22.89 $ 12,818.40
34 8010-108-K-0 Footings and Foundations,Street Light,PC,2'Dia.x 7' 1 EA $ 1,000.00 $ 1,000.00 $ 1,300.00 $ 1,300.00 $ 1,695.00 $ 1,695.00 $ 1,081.50 $ 1,081.50
35 8010-108-N-0 Street Light,Galvanized,20' 1 EA $ 4,000.00 $ 4,000.00 $ 7,100.00 $ 7,100.00 $ 6,698.70 $ 6,698.70 $ 7,367.85 $ 7,367.85
Sub Total $ 11,640.00 Sub Total $ 28,248.00 Sub Total $ 25,713.70 Sub Total $ 25,974.95
Division 8030-TemporaryTraffic Control
36 8030-108-A-0 Temporary Traffic Control 1 LS $ 40,000.00 $ 40,000.00 $ 14,700.00 $ 14,700.00 $ 13,790.00 $ 13,790.00 $ 14,479.50 $ 14,479.50
Sub Total $ 40,000.00 Sub Total $ 14,700.00 Sub Total $ 13,790.00 Sub Total $ 14,479.50
Division 9010-Seeding
37 9010-108-A-1 Conventional-Seeding,Type 1,by SY 388 SY $ 1.00 $ 388.00 $ 1.60 $ 620.80 $ 1.50 $ 582.00 $ 1.58 $ 613.04
38 9010-108-A-2 Fertilizing,by SY 388 SY $ 0.25 $ 97.00 $ 0.55 $ 213.40 $ 0.50 $ 194.00 $ 0.53 $ 205.64
39 9010-108-A-3 Mulching,by SY 388 SY $ 0.25 $ 97.00 $ 1.30 $ 504.40 $ 1.25 $ 485.00 $ 1.31 $ 508.28
Sub Total $ 582.00 Sub Total $ 1,338.60 Sub Total $ 1,261.00 Sub Total $ 1,326.96
Division 9030-Plant Material and Planting
40 9030-108-C-0 Plants,Lump Sum 1 LS $ 2,000.00 $ 2,000.00 $ 5,300.00 $ 5,300.00 $ 5,000.00 $ 5,000.00 $ 5,250.00 $ 5,250.00
Sub Total $ 2,000.00 Sub Total $ 5,300.00 Sub Total $ 5,000.00 Sub Total $ 5,250.00
Division 9040-Erosion and Sediment Control
41 9040-108-A-2 Stormwater Pollution Prevention Plan(SWPPP)Management 1 LS $ 1,000.00 $ 1,000.00 $ 2,000.00 $ 2,000.00 $ 2,000.00 $ 2,000.00 $ 2,100.00 $ 2,100.00
42 9040-108-N-1 Silt Fence or Silt Fence Ditch Check, Installation 204 LF $ 2.00 $ 408.00 $ 3.20 $ 652.80 $ 3.00 $ 612.00 $ 3.15 $ 642.60
43 9040-108-N-2 Silt Fence or Silt Fence Ditch Check, Removal of Sediment 204 LF $ 1.00 $ 204.00 $ 0.55 $ 112.20 $ 0.50 $ 102.00 $ 0.53 $ 108.12
44 9040-108-N-3 Silt Fence or Silt Fence Ditch Check, Removal of Device 204 LF $ 1.00 $ 204.00 $ 0.55 $ 112.20 $ 0.50 $ 102.00 $ 0.53 $ 108.12
45 9040-108-0-1 Stabilized Construction Entrance by Square Yard 90 SY $ 20.00 $ 1,800.00 $ 20.00 $ 1,800.00 $ 7.90 $ 711.00 $ 18.00 $ 1,620.00
Sub Total $ 3,616.00 Sub Total $ 4,677.20 Sub Total $ 3,527.00 Sub Total $ 4,578.84
Division 9060-Chain Link Fence
46 9060-108-A-0 Chain Link Fence,8' 194 LF $ 50.00 $ 9,700.00 $ 64.00 $ 12,416.00 $ 51.09 $ 9,911.46 $ 40.76 $ 7,907.44
47 9060-108-B-0 Gates 4 EA $ 1,000.00 $ 4,000.00 $ 540.00 $ 2,160.00 $ 980.00 $ 3,920.00 $ 525.00 $ 2,100.00
Sub Total $ 13,700.00 Sub Total $ 14,576.00 Sub Total $ 13,831.46 Sub Total $ 10,007.44
Division 10,010-Demolition of Building Structures
48 10010-108-A-0 Demolition Work 1 LS $ 40,000.00 $ 40,000.00 $ 9,300.00 $ 9,300.00 $ 4,947.00 $ 4,947.00 $ 6,000.00 $ 6,000.00
Sub Total $ 40,000.00 Sub Total $ 9,300.00 Sub Total $ 4,947.00 Sub Total $ 6,000.00
Page 632 of 645
Project Title: Kerper Boulevard Lift Station Replacement Bid Date Engineer's Estimate Tschiggfrie Excavating Co. Top Grade Excavating,Inc. Portzen Construction,Inc.
11/21/2024
LINE REFERENCE PLAN ESTIMATED BID BID BID
NO. NUMBER BID ITEM DESCRIPTION (�UANTITY UNIT UNIT PRICE TOTAL PRICE UNIT PRICE TOTAL PRICE UNIT PRICE TOTAL PRICE UNIT PRICE TOTAL PRICE
Division 11,010-Construction Survey
49 11010-108-A-0 Construction Survey 1 LS $ 3,000.00 $ 3,000.00 $ 11,600.00 $ 11,600.00 $ 4,357.00 $ 4,357.00 $ 4,525.50 $ 4,525.50
Sub Total $ 3,000.00 Sub Total $ 11,600.00 Sub Total $ 4,357.00 Sub Total $ 4,525.50
Division 11,020-Mobilization
50 11020-108-A-0 Mobilization 1 LS $ 150,000.00 $ 150,000.00 $ 96,500.00 $ 96,500.00 $ 82,640.00 $ 82,640.00 $ 140,504.70 $ 140,504.70
Sub Total $ 150,000.00 Sub Total $ 96,500.00 Sub Total $ 82,640.00 Sub Total $ 140,504.70
Division 11,030-Temporary Services During Construction
51 11030-108-A-0 Maintenance of Postal Service 1 LS $ 4,000.00 $ 4,000.00 $ 1,700.00 $ 1,700.00 $ 500.00 $ 500.00 $ 1,500.00 $ 1,500.00
Sub Total $ 4,000.00 Sub Total $ 1,700.00 Sub Total $ 500.00 Sub Total $ 1,500.00
Division 11,050-Concrete Washout
52 11050-108-A-0 Concrete Washout 1 LS $ 2,000.00 $ 2,000.00 $ 2,000.00 $ 2,000.00 $ 1,000.00 $ 1,000.00 $ 1,500.00 $ 1,500.00
Sub Total $ 2,000.00 Sub Total $ 2,000.00 Sub Total $ 1,000.00 Sub Total $ 1,500.00
Special Provisions-Non-Standard Project Items
53 SP Lift Station Structures, Equipment,and Controls 1 LS $ 475,000.00 $ 475,000.00 $ 803,500.00 $ 803,500.00 $ 627,955.00 $ 627,955.00 $ 1,255,453.50 $ 1,255,453.50
54 SP Generator 1 LS $ 80,000.00 $ 80,000.00 $ 63,300.00 $ 63,300.00 $ 61,280.00 $ 61,280.00 $ 63,500.85 $ 63,500.85
55 SP Lift Station Electrical 1 LS $ 55,000.00 $ 55,000.00 $ 56,900.00 $ 56,900.00 $ 27,155.00 $ 27,155.00 $ 65,177.70 $ 65,177.70
56 SP CT and Meter Cabinet 1 EA $ 10,000.00 $ 10,000.00 $ 15,000.00 $ 15,000.00 $ 14,125.83 $ 14,125.83 $ 15,808.80 $ 15,808.80
57 SP Wiring and Cable-Splice Capsule 1 EA $ 1,500.00 $ 1,500.00 $ 11,600.00 $ 11,600.00 $ 10,897.60 $ 10,897.60 $ 9,114.00 $ 9,114.00
58 SP Concrete Site Pad and Equipment Pads 1 LS $ 25,000.00 $ 25,000.00 $ 27,000.00 $ 27,000.00 $ 14,960.00 $ 14,960.00 $ 51,000.00 $ 51,000.00
59 SP TransformerPad 1 EA $ 1,000.00 $ 1,000.00 $ 7,200.00 $ 7,200.00 $ 1,630.00 $ 1,630.00 $ 2,500.00 $ 2,500.00
60 SP CT and Meter Cabinet Pad 1 EA $ 1,000.00 $ 1,000.00 $ 6,600.00 $ 6,600.00 $ 3,644.00 $ 3,644.00 $ 2,500.00 $ 2,500.00
Sub Total $ 648,500.00 Sub Total $ 991,100.00 Sub Total $ 761,647.43 Sub Total $ 1,465,054.85
Total Base Bid Amount $ 1,630,455.00 $ 1,843,385.90 $ 1,876,704.14 $ 2,633,840.68
Total Selected Alternate(s)Amount $ - $ - $ - $ -
Total Bid Amount: $ 1,630,455.00 $ 1,843,385.90 $ 1,876,704.14 $ 2,633,840.68
Total Bid $ 1,843,385.90 Total Bid $ 1,876,704.14 Total Bid $ 2,633,840.68
%Over/Under(-) 13.06% 15.10% 61.54%
Page 633 of 645
• •
origin
design`'
November 21 , 2024
Honorable Mayor Brad Cavanagh and Council Members
c/o Maxwell O'Brien, Project Manager
City of Dubuque
50 W.13th Street
Dubuque, IA 52001
RE: City of Dubuque, lowa
Kerper Boulevard Lift Station Replacement
Award Recommendation
Project No.: 24041
Dear Mayor Cavanagh and Council Members:
In accordance with owner instructions, bids for the Kerper Boulevard Lift Statin Replacement project
were opened and read at 2:00 p.m.on November 21,2024. Three bids were received for this project.
Tschiggfrie Excavating Co. $1,843,385.90
Top Grade Excavating, Inc. $1,876,704.14
Portzen Construction Co. $2,633,840.68
After reviewing the bids, it was determined the low bid was submitted Tschiggfrie Excavating Co. of
Dubuque, lowa, in the amount of$1,843,835.90.
Tschiggfrie Excavating has the experience,workforce and equipment to properly complete this
contract. We recommend award of the Kerper Boulevard Lift Statin Replacement project to
Tschiggfrie Excavating Co. in the amount of$1,843,835.90.
The engineer's estimate for this project was$1,626,615.00 (unofficially amended to$1,630,455.00
based on quantity changes within Addendum #1). The low bid of$1,843,835.90 is $217,220.90 or 13.35i
above the official engineer's estimate.
Sincerely,
Origin Design Co.
L�C"�e'stG��� �-Gr...
Eldon Schneider, P.E.
Environmental Engineer
Copy: Tschiggfrie Excavating