Loading...
Acceptance of Certain Subdivision Improvements in Silver Oaks Estates #3 (Phase 2 of Silver Oaks Subdivision)City of Dubuque City Council CONSENT ITEMS # 13. Copyrighted December 16, 2024 ITEM TITLE: Acceptance of Certain Subdivision Improvements in Silver Oaks Estates #3 (Phase 2 of Silver Oaks Subdivision) SUMMARY: City Manager recommending City Council adopt the attached resolution accepting certain public improvements in Silver Oaks Estates # 3 (Phase 2 of Silver Oaks Subdivision). RESOLUTION Accepting Public Improvements in Silver Oaks Estates # 3 (Silver Oaks Phase 2), in the City of Dubuque, Iowa SUGGUESTED Receive and File; Adopt Resolution(s) DISPOSITION: ATTACHMENTS: 1. MVM Memo 2. SILVER OAKS phase 2 imp accept memo 3. SILVER OAKS phase 2 imp accept resolution 4. silver oaks phasing map Page 216 of 1050 Dubuque THE CITY OF uFA�a9a av DuBE 13 Masterpiece on the Mississippi zoo�•*o rP PP 2017202019 TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: Acceptance of Certain Subdivision Improvements in Silver Oaks Estates #3 (Phase 2 of Silver Oaks Subdivision) DATE: December 9, 2024 City Engineer Gus Psihoyos is recommending City Council adopt the attached resolution accepting certain public improvements in Silver Oaks Estates # 3 (Phase 2 of Silver Oaks Subdivision). Upon inspection by the City, it has been determined that the public improvements required by Resolution 284-22, except for storm water detention facilities, have been completed in accordance with plans approved by the City Council and in conformance with City specifications. Maintenance guarantees for said public improvements shall be provided by the owners, Royal Oaks Development Corporation, for a period of two (2) years from the date of acceptance by City Council. I concur with the recommendation and respectfully request Mayor and City Council approval. Mic ael C. Van Milligen MCVM:sv Attachment cc: Crenna Brumwell, City Attorney Cori Burbach, Assistant City Manager Gus Psihoyos, City Engineer Nate Kieffer, Land Surveyor Arielle Swift, Public Works Director Chris Lester, Water Department Director Carl Plumley, Water Distribution Maintenance Supervisor Maxwell O'Brien, Civil Engineer II Page 217 of 1050 THE CITY OF DiUB E Masterpiece on the Mississippi TO: Michael C. Van Milligen, City Manager FROM: Gus Psihoyos, City Engineer DATE: December 2, 2024 Dubuque All -America City N�'I1Q4N. (NC IJ=N.UI= 2007-2012.2013 2017*2019 SUBJECT: Acceptance of Certain Subdivision Improvements in Silver Oaks Estates # 3 (Phase 2 of Silver Oaks Subdivision) INTRODUCTION The enclosed material provides for City Council acceptance of certain public improvements that the developer, Royal Oaks Development Corporation, has recently completed in Silver Oaks Estates # 3 (Phase 2 of Silver Oaks Subdivision). BACKGROUND As a condition of subdivision plat approval through Resolution No. 284-22, the developer of Silver Oaks Estates # 3 was required to install certain public improvements including street paving with curb, sanitary sewer main, water main, storm sewers and catch basins, street lighting, fiber optic conduit, accessible sidewalk ramps, and storm water detention facilities and to dedicate said improvements to the City upon completion. Silver Oaks Estates # 3 is known as Phase 2 of the Silver Oaks residential development and includes the area shown as Phase 2 on the attached map. DISCUSSION The Subdivision Ordinance requires that upon completion of all the required public improvements, the subdivider shall notify the City in writing of the completion of the improvements, requesting that the City either approve or reject the acceptance of the improvements, together with a statement of reasons for any rejection. On November 8, 2024, the developer requested City's acceptance of the improvements in Silver Oaks Estates # 3 (Phase 2 of Silver Oaks Subdivision). Upon inspection by the City, it has been determined that the public improvements required by Resolution 284- 22, except for storm water detention facilities, have been completed in accordance with plans approved by the City Council and in conformance with City specifications. RECOMMENDATION I would, therefore, recommend that the City Council accept the public improvements, except for storm water detention facilities, as described above. Maintenance guarantees for said public improvements shall be provided by the owners, Royal Oaks Page 218 of 1050 Development Corporation, for a period of two (2) years from the date of acceptance by City Council. ACTION TO BE TAKEN The City Council is requested to adopt the attached resolution accepting certain public improvements in Silver Oaks Estates # 3 (Phase 2 of Silver Oaks Subdivision). Prepared by Nate Kieffer, Land Surveyor CC. Arielle Swift, Public Works Director Chris Lester, Water Department Director Carl Plumley, Water Distribution Maintenance Supervisor Maxwell O'Brien, Civil Engineer II Page 219 of 1050 Prepared by: Nate Kieffer, City of Dubuque Engineering, 50 W. 13" Street, Dubuque IA 52001 (563)589-4270 Return to: Adreinne N. Breitfelder, City Clerk, 50W 131" Street, Dubuque, IA 52001 (563)589-4100 RESOLUTION NO. 403-24 ACCEPTING PUBLIC IMPROVEMENTS IN SILVER OAKS ESTATES # 3 (SILVER OAKS PHASE 2), IN THE CITY OF DUBUQUE, IOWA Whereas, pursuant to Resolution 284-22, certain public improvements including street paving with curb, sanitary sewer main, water main, storm sewers and catch basins, street lighting, fiber optic conduit, accessible sidewalk ramps, and storm water detention facilities were installed by the developer of Silver Oaks Estates # 3 (Phase 2 of Silver Oaks Subdivision) in the City of Dubuque, Iowa; and Whereas, the improvements, except for storm water detention facilities, have been fully completed and the City Manager has examined the work and has filed a certificate stating that the same has been completed in accordance with the plans approved by the City Council and in conformance with City specifications, and has recommended that the improvements be accepted by the City Council. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: Section 1. That the recommendation of the City Manager be approved and that said public improvements in Silver Oaks Estates # 3 (Phase 2 of Silver Oaks Subdivision), except for storm water detention facilities, be and the same is hereby accepted. Section 2. That a maintenance guarantee covering said public improvements shall be provided by the owners, Royal Oaks Development Corporation, for a period of two (2) years from the date of this resolution. Passed, approved and adopted this 161" day of December, 2024. Brad M anagh, Mayor Attest: Adrienne N. Breitfelder; City Clerk THE CITY OF DUB E Masterpiece on the Mississippi Dubuque Insert Title 11TV Insert Subtitle 2002017*27t201919 II�i►�O��i ��'� Sp11211111, DISCLAIMER: This information was compiled sing the Dubuque Area Geographic Information System (DAGIS), which includes data created by both the City of Map Prepared by: Dubuque and Dubuque County. It is understood that, while City of Dubuque the City of Dubuque and participating agencies utilized the most current and accurate information available, DAGIS and 1 inch = 600 feet Engineering Division it's suppliers do not warrant the accuracy or currency of the information or data contained herein. The City and participating 50 West 13th Street agencies shall not be held liable for any direct, indirect, incidental, Dubuque, Iowa 52001 consequential, punitive, or special damages, whether foreseeable or unforeseeable, arising out of the authorized or unauthorized use of 200100 0 200 400 600 800 Feet Phone: (563) 589-4270 this data or the inability to use this data or out of any breach of hatsoe S' Fax: (563) 589-4205 warranty wver. Page 221 of 1050