Loading...
Ruby Sutton Building 2nd Floor Renovation Project - Award Public Improvement ContractCity of Dubuque City Council ACTION ITEMS # 4. Copyrighted December 16, 2024 ITEM TITLE: Ruby Sutton Building 2nd Floor Renovation Project - Award Public Improvement Contract Project No. 5565000021 SUMMARY: City Manager recommending City Council award the Public Improvement Construction Contract for the Ruby Sutton Building 2nd Floor Renovation Project to Portzen Construction, Inc. in the base bid amount of $739,000.00 and the alternate bid #1 elevator for the total bid award of $1,034,000.000 through adoption of the attached resolution. RESOLUTION Awarding Public Improvement Contract For The Ruby Sutton Building 2nd Floor Renovation Project SUGGUESTED Receive and File; Adopt Resolution(s) DISPOSITION: ATTACHMENTS: 1. MVM Memo 2. Staff Memo 3. Resolution 4. Recommendation Letter Page 835 of 1050 THE CITY OF DUB E-E Masterpiece on the Mississippi TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: Ruby Sutton Building 2nd Floor Renovation Project Award Public Improvement Contract Project No. 5565000021 DATE: December 11, 2024 Dubuque All -America Ciq IIIr II 2007.2012.2013 2017*2019 The City received sealed bids on November 21, 2024, for the Ruby Sutton Building 2nd Floor Renovation Project. Portzen Construction, Inc. submitted the low base bid in the amount of $739,000.00 which is 7.6% below the engineer's estimate of probable cost. City Engineer Gus Psihoyos is recommending City Council award the Public Improvement Construction Contract for the Ruby Sutton Building 2nd Floor Renovation Project to Portzen Construction, Inc. in the base bid amount of $739,000.00 and the alternate bid #1 elevator for the total bid award of $1, 034,000.000 through adoption of the attached resolution. The Ruby Sutton Building is part of a larger combined facility connected to the Multicultural Family Center. The current Ruby Sutton Building first floor is about 6,600 square feet. The second floor is approximately 2,600 square feet. The expanded 2nd floor facility improvements will feature the following amenities: • A collaborative workspace with presentation equipment. • A kitchenette to provide staff with space for refreshments and meals. • A small meeting/conference room. • One individual/family style restroom. • A reception area to greet guests. • Five offices large enough to accommodate small meetings. • A 10'x25' Deck from the back on the roof section of the 1 St floor. • A skylight to maximize the introduction of natural light. As part of the project, the bid documents included an Alternate Bid No. 1 to provide a cost to install an elevator that would provide service to the 2nd floor and basement. Based on the bids received, sufficient funding has been identified from unbudgeted Page 836 of 1050 FY25 cash management interest from the new banking services agreement to proceed with the Alternate Bid No. 1 (add elevator) option at this time. I concur with the recommendation and respectfully request Mayor and City Council approval. v Mic ael C. Van Milligen MCVM:sv Attachment cc: Crenna Brumwell, City Attorney Cori Burbach, Assistant City Manager Gus Psihoyos, City Engineer Jenny Larson, Chief Financial Officer Marie Ware, Leisure Services Director Antonio Mouzon, Community Impact Director 2 Page 837 of 1050 THE COF DtUB E Masterpiece on the Mississippi TO: Michael C. Van Milligen, City Manager FROM: Gus Psihoyos, City Engineer DATE: December 13, 2024 SUBJECT: Ruby Sutton Building 2nd Floor Renovation Project Award Public Improvement Contract Project No. 5565000021 INTRODUCTION Dubuque All -America City i'iI r II 2007-2012.2013 2017*2019 The purpose of this memorandum is to provide the City Council with information related to the recommendation for awarding the Public Improvement Construction Contract for the Ruby Sutton Building 2nd Floor Renovation Project. BACKGROUND The City owns the Ruby Sutton Building, in which the 1st floor was renovated for multi - departmental city operations while the 2nd floor remains unimproved. In preparation for renovation and to facilitate design, a partial demolition was conducted on the 2nd floor space as well as appropriate asbestos abatement. DISCUSSION The Ruby Sutton Building is part of a larger combined facility connected to the Multicultural Family Center. The current Ruby Sutton Building first floor is about 6,600 square feet. The second floor is approximately 2,600 square feet. The expanded 2nd floor facility improvements will feature the following amenities: • A collaborative workspace with presentation equipment. • A kitchenette to provide staff with space for refreshments and meals. • A small meeting/conference room. • One individual/family style restroom. • A reception area to greet guests. • Five offices large enough to accommodate small meetings. • A 10'x25' Deck from the back on the roof section of the 1 st floor. • A skylight to maximize the introduction of natural light. This project is intended to create a suitable workspace for the new Community Impact Department which absorbed functions and staff from the Leisure Services Department. Page 1 of 3 Page 838 of 1050 The Multicultural Family Center staff, Community Impact Department, Engineering Department, Information Services Department, and other city staff were involved in the design of the improvements. Once the base bid for the construction work has been awarded, the project team intends to distribute two Requests for Proposal to select vendors for providing furnishings and audio-visual equipment. BID RESULTS The City received sealed bids on November 21, 2024, for the Ruby Sutton Building 2nd Floor Renovation Project. Portzen Construction, Inc. submitted the low base bid in the amount of $739,000.00 which is 7.6% below the engineer's estimate of probable cost. A summary of the bid proposals received is as follows: Contractor Name Base Bid Alternate Base + Alternate Portzen Construction, Inc. $739,000 $295,000 $1,034,000 Tricon General Construction, Inc. $761,000 $286,000 $1,047,000 Sheets General Construction $770,000 $287,000 $1,057,000 Renovation & Restoration Services, LLC $849,300 $292,800 1 $1,142,100 ALTERNATE BID NO. 1 As part of the project, the bid documents included an Alternate Bid No. 1 to provide a cost to install an elevator that would provide service to the 2nd floor and basement. RECOMMENDATION I recommend that the public improvement contract for the Ruby Sutton Building 2nd Floor Renovation Project be awarded to Portzen Construction, Inc. of Dubuque, IA for both the Base Bid and the Alternate Bid No. 1 (add elevator) in the amount of $1,034,000.00. BUDGETIMPACT The estimate of probable cost for the Ruby Sutton 2nd Floor Renovation Project is summarized in the following table: PROJECT COSTS ESTIMATE AWARD Construction Contract - Base Bid $ 800,000 $ 739,000 Alternate Bid No. 1 Elevator for Service to 2nd Floor and Basement 600,000 295,000 Total - Base Bid + Alternate No. 1 $ 1,400,000 $ 1,034,000 12 Page 2of3 Page 839 of 1050 Other Project Costs ESTIMATE AWARD Engineer Dept Staff Services $ 20,000 Consultant Services Design - 563 Design 53,000 Consultant Services Elevator Design - Strand 32,500 Consultant Services Construction - 563 Design 15,900 Hazardous Building Materials Abatement $ 25,000 17,995 Furniture & Audio/Visual/IT/Security 75,000 75,000 Contingency (5%) * 1 40,000 40,000 Total - Other Project Costs $ 140,000 $ 254,395 AWARD Total - Base Bid + Alternate No. 1 + Other Project Costs (A+B) $ 1,288,395 * Because this project only involves interior space renovation; a 5% contingency is recommended compared to the traditional 10% contingency budget. The proposed funding for the Ruby Sutton 2nd Floor Renovation Project is summarized in the following table: Project No. Fund Description Fund Amount American Rescue Plan Act (ARPA) Funds $ 507,827 5565000021 MFC 2nd Floor Renovation (FY24 YE Savings) 432,173 FY25 Revenue from New Bank Services Agreement 348,395 Total Project Funding $ 1,288,395 In addition to the ARPA funding, the City local funding for Project No. 5565000021, MFC 2nd Floor Renovation, will come from the allocation of remaining fund balance from the close of the FY24 budget year in addition to FY25 unbudgeted cash management interest ($348,395) from anticipated revenue from the new bank services agreement. ACTION TO BE TAKEN I respectfully request that the City Council award the Public Improvement Construction Contract for the Ruby Sutton Building 2nd Floor Renovation Project to Portzen Construction, Inc. in the base bid amount of $1,034,000.00 through adoption of the attached resolution. cc: Jenny Larson, Chief Financial Officer Robert Schiesl, Assistant City Engineer Marie Ware, Leisure Services Director Antonio Mouzon, Community Impact Director Justin Hogan, Facilities Manager FAPROJECTS\Facilities - Multicultural Family Center\2024 - 2nd Floor Renovation\Council Docs\Award Page 3of3 Page 840 of 1050 Prepared by Kerry Bradley City of Dubuque Engineering 50 W. 13th St. Dubuque IA 52001 (563)589-4270 Return to Adrienne N. Breitfelder City Clerk City of Dubuque, 50 W. 13th St. Dubuque, IA 52001 (563)589-4100 RESOLUTION NO. 415-24 AWARDING PUBLIC IMPROVEMENT CONTRACT FOR THE RUBY SUTTON BUILDING 2ND FLOOR RENOVATION PROJECT WHEREAS, sealed proposals have been submitted by contractors for the Ruby Sutton Building 2nd Floor Renovation Project, (the Project) pursuant to Resolution No. 336-24 and Notice to Bidders published on the City of Dubuque, Iowa website and plan room service with statewide circulation on the 25th day of October 2024-1 and WHEREAS, said sealed bid proposals were opened and read on the 21 St day of November 2024 and it has been determined that Portzen Construction, Inc. of Dubuque, Iowa, in the base bid amount of $1,034,000.00, is the lowest responsive, responsible bidder for the Project. NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: SECTION 1. That a Public Improvement Contract for the Project is hereby awarded to Portzen Construction, Inc. and the City Manager is hereby directed to execute a Public Improvement Contract on behalf of the City of Dubuque for the Project. Passed, approved, and adopted this Attest: Adrienne Breitfelder, CMC, City Clerk 16th day of December 2024. .• .�:�Mayor Ot4ij DI 1268 Locust Street Dubuque, Iowa 52001 563design.com The City of Dubuque 50 W.131h Street Dubuque, IA 52001 26 November 2024 Re: Ruby Sutton Building - Second Floor Remodel - Award Recommendation To whom it may concern: In accordance with the Advertisement for Bids for a Public Improvement Project, the Ruby Sutton Building - Second Floor Remodel bids were opened and ready publicly shortly after 2:00 p.m. on November 21, 2024. We have confirmed with the apparent low bidder they are able to complete the work outlined in the drawings and specifications in the timeline set forth in the project specifications. They have successfully completed other projects of similar size and complexity. With this information, we recommend award of the contract (including Bid Alternate #1) to Portzen Construction Inc. for the total amount of $1,034,000.00. The Bid results are attached. Sincerely, Andrew McCready, Registered Architect Principal Page 842 of 1050