Signed Contract_Conlon Construction Co. for the Iowa Amphitheater at Schmitt Island Bid Package 2
Copyrighted January 6, 2025 City of Dubuque CONSENT ITEMS # 8. City Council ITEM TITLE: Signed Contract(s) SUMMARY: CDB Utility Contractors for the Park Hill Fiber Optic Path; CDB Utility Contractors for the Shallow Well Field Fiber Optic Path; Conlon Construction Co. for the Iowa Amphitheater at Schmitt Island Bid Package 2; Racom for the SCADA Security Camera System Upgrade Project 2024. SUGGUESTED Receive and File DISPOSITION: ATTACHMENTS: 1. Iowa Amphitheater on Schmitt Island Bid Pkg 2 Signed Contract 2. Shallow Well Field Fiber Optic Path 3. SCADA Security Camera System Upgrade Project 2024 4. Park Hill Fiber Optic Path Page 142 of 366 2,-,;A1A Document A101 ° - 2017 Standard Form of Agreement Between Owner and Contractor where the basis of payment is a Stipulated Sum AGREEMENT made as of the 17th day of December in the year 2024 (In words, indicate day, month and year.) BETWEEN the Owner: (Name, legal status, address and other information) Lfty of Dubuque 50 W. 13" Street, Dubuque, IA 52001 PH: 563.589.1734 and the Contractor: (Name, legal status, address and other information) Conlon Construction Co. 501 Bell Street Suite 402, Dubuque, IA 52001 PH: 563.583.2162 for the following Project: (Name, location and detailed description) Iowa Amphitheater at Schmitt Island Bid Package 2: Utilities, Paving & Amphitheater Stage The Architect: (Name, legal status, address and other information) RDG Planning & Design, Inc. (R3002.227.01) 301 Grand Avenue, Des Moines, IA 50309 515.288.3141 The Owner and Contractor agree as follows. AIA Document A1014-2017. Copyright© 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1967, 1974, 1977, 1987, 1991, 1997, 2007 and 2017 by The American Institute of Architects. All rights reserved. WARNING: This AIA& Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA& Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. Page 143 of 366 TABLE OF ARTICLES 1 THE CONTRACT DOCUMENTS 2 THE WORK OF THIS CONTRACT 3 DATE OF COMMENCEMENT AND SUBSTANTIAL COMPLETION 4 CONTRACT SUM 5 PAYMENTS 6 DISPUTE RESOLUTION 7 TERMINATION OR SUSPENSION 8 MISCELLANEOUS PROVISIONS 9 ENUMERATION OF CONTRACT DOCUMENTS EXHIBIT A INSURANCE AND BONDS ARTICLE 1 THE CONTRACT DOCUMENTS The Contract Documents consist of this Agreement, Conditions of the Contract (General, Supplementary, and other Conditions), Drawings, Specifications, Addenda issued prior to execution of this Agreement, other documents listed in this Agreement, and Modifications issued after execution of this Agreement, all of which form the Contract, and are as fully a part of the Contract as if attached to this Agreement or repeated herein. The Contract represents the entire and integrated agreement between the parties hereto and supersedes prior negotiations, representations, or agreements, either written or oral. An enumeration of the Contract Documents, other than a Modification, appears in Article 9. ARTICLE 2 THE WORK OF THIS CONTRACT The Contractor shall fully execute the Work described in the Contract Documents, except as specifically indicated in the Contract Documents to be the responsibility of others. ARTICLE 3 DATE OF COMMENCEMENT AND SUBSTANTIAL COMPLETION § 3.1 The date of commencement of the Work shall be: (Check one of the following boxes.) ❑ The date of this Agreement. ® A date set forth in a notice to proceed issued by the Owner. ❑ Established as follows: (Insert a date or a means to determine the date of commencement of the Work.) If a date of commencement of the Work is not selected, then the date of commencement shall be the date of this Agreement. § 3.2 The Contract Time shall be measured from the date of commencement of the Work. AIA Document ATOM-2017. Copyright© 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1967, 1974, 1977, 1987, 1991, 1997, 2007 and 2017 by The American Institute of Architects. All rights reserved. WARNING: This AIA® Document is protected by U.S. Copyright Law and International 2 Treaties. Unauthorized reproduction or distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. Page 144 of 366 § 3.3 Substantial Completion § 3.3.1 Subject to adjustments of the Contract Time as provided in the Contract Documents, the Contractor shall achieve Substantial Completion of the entire Work: (Check one of the following boxes and complete the necessar), information.) ❑ Not later than not a licable (N/A) calendar days from the date of commencement of the Work. ® By the following date: December 19, 2025 § 3.3.2 Subject to adjustments of the Contract Time as provided in the Contract Documents, if portions of the Work are to be completed prior to Substantial Completion of the entire Work, the Contractor shall achieve Substantial Completion of such portions by the following dates: Portion of Work Substantial Completion Date Water, Sanitary Utilities, and intermediate Anril 1 2025 foundations § 3.3.3 If the Contractor fails to achieve Substantial Completion as provided in this Section 3.3, liquidated damages, if any, shall be assessed as set forth in Section 4.5. ARTICLE 4 CONTRACT SUM § 4.1 The Owner shall pay the Contractor the Contract Sum in current funds for the Contractor's performance of the Contract. The Contract Sum shall be Nine Million, Two Hundred and Seventy -Three Thousand, Five Hundred and Thirty_ Eight Dollars ($9,273,538.00), subject to additions and deductions as provided in the Contract Documents. § 4.2 Alternates § 4.2.1 Alternates, if any, included in the Contract Sum: Item Price Alternate 1 — Entrance Cut Walls $657,238 Alternate 2 — Parking Lot Enhancements $335,400 Alternate 3 — Decomposed Granit Pathways $38,300 Alternate 4 - Replace Seeding with Sod $38,100 Alternate 7 — Concrete Pavement Reinforcing $35,500 § 4.2.2 Subject to the conditions noted below, the following alternates may be accepted by the Owner following execution of this Agreement. Upon acceptance, the Owner shall issue a Modification to this Agreement. (Insert below each alternate and the conditions that must be met for the Owner to accept the alternate.) Item Price Conditions for Acceptance Alternate 5 — Stage Rigging Alternate 6 — Drum Lighting AIA Document A101@-2017. Copyright ©1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1967, 1974, 1977, 1987, 1991, 1997, 2007 and 2017 by The American Institute of Architects. All rights reserved. WARNING: This AIA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. Page 145 of 366 § 4.3 Allowances, if any, included in the Contract Sum: (Identify each allowance.) Item No. Description Esimated Unit Add / Deduct Bid Unit Total Bid Quantity Price Price Included in Lump Included in Sum Base Bid Lump Sum Base Bid 1 Maintenance 1 LUMP Add (Required) 450 000 $450,000 Building SUM 2 IDOT Gradation No. 500 TONS Add (Required) 25.00 $12,500 4 Section No. 4123 Modified Subbase 3 Concrete -Filled Steel 6,160 LINEAR Add (Required) 68.40 $421,344 Pipe Piles FEET 4 Remove Topsoil 1.500 CUBIC Add 10 $15,000 from Site YARDS 5 Remove Fill from 11000 CUBIC Add $11,000 Site YARDS § 4.4 Unit prices, if any: (Identify the item and state the unit price and quantity limitations, if any, to which the unit price will be applicable.) Item Not applicable. Units and Limitations Price per Unit ($0.00) Not applicable. Not applicable. § 4.5 Liquidated damages, if any: (Insert terms and conditions for liquidated damages, if any) In accordance with Section 9.11 of AIA Document A201T14-2017. General Conditions of the Contract for Construction. § 4.6 Other: (Insert provisions,for bonus or other incentives, if any, that might result in a change to the Contract Scan.) Not applicable. ARTICLE 5 PAYMENTS § 5.1 Progress Payments § 5.1.1 Based upon Applications for Payment submitted to the Architect by the Contractor and Certificates for Payment issued by the Architect, the Owner shall make progress payments on account of the Contract Sum to the Contractor as provided below and elsewhere in the Contract Documents. § 5.1.2 The period covered by each Application for Payment shall be one calendar month ending on the last day of the month, or as follows: Not applicable. § 5.1.3 Provided that an Application for Payment is received by the Architect not later than the Wednesday before the last Tuesday of the day of a month, the Owner shall make payment of the amount certified to the Contractor aref fl+aii on or before the 1 st day of the following month. If an Application for Payment is received by the Architect after the application date fixed above, payment of the amount certified shall be made by the Owner not later than twen (20) days after the Architect receives the Application for Payment. AIA Document A1010-2017. Copyright© 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1967, 1974. 1977, 1987, 1991, 1997, 2007 and 2017 by The American Institute of Architects. All rights reserved. WARNING: This AIA® Document is protected by U.S. Copyright Law and International 4 Treaties. Unauthorized reproduction or distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. Page 146 of 366 § 5.1.4 Each Application for Payment shall be based on the most recent schedule of values submitted by the Contractor in accordance with the Contract Documents. The schedule of values shall allocate the entire Contract Sum among the various portions of the Work. The schedule of values shall be prepared in such form, and supported by such data to substantiate its accuracy, as the Architect may require. This schedule of values shall be used as a basis for reviewing the Contractor's Applications for Payment. § 5.1.5 Applications for Payment shall show the percentage of completion of each portion of the Work as of the end of the period covered by the Application for Payment. § 5.1.6 In accordance with AIA Document A201TM-2017, General Conditions of the Contract for Construction, and subject to other provisions of the Contract Documents, the amount of each progress payment shall be computed as follows: § 5.1.6.1 The amount of each progress payment shall first include: .1 That portion of the Contract Sum properly allocable to completed Work; .2 That portion of the Contract Sum properly allocable to materials and equipment delivered and suitably stored at the site for subsequent incorporation in the completed construction, or, if approved in advance by the Owner, suitably stored off the site at a location agreed upon in writing; and .3 That portion of Construction Change Directives that the Architect determines, in the Architect's professional judgment, to be reasonably justified. § 5.1.6.2 The amount of each progress payment shall then be reduced by: .1 The aggregate of any amounts previously paid by the Owner; .2 The amount, if any, for Work that remains uncorrected and for which the Architect has previously withheld a Certificate for Payment as provided in Article 9 of AIA Document A201-2017; .3 Any amount for which the Contractor does not intend to pay a Subcontractor or material supplier, unless the Work has been performed by others the Contractor intends to pay; .4 For Work performed or defects discovered since the last payment application, any amount for which the Architect may withhold payment, or nullify a Certificate of Payment in whole or in part, as provided in Article 9 of AIA Document A201-2017; and .5 Retainage withheld pursuant to Section 5.1.7. § 5.1.7 Retainage § 5.1.7.1 For each progress payment made prior to Substantial Completion of the Work, the Owner may withhold the following amount, as retainage, from the payment otherwise due: (Insert a percentage or amount to be withheld as retainage from each Application for Payment. The amount of retainage may be limited by governing law.) 5%. § 5.1.7.1.1 The following items are not subject to retainage: (Insert any items not subject to the withholding of retainage, such as general conditions, insurance, etc) Not applicable. § 5.1.7.2 Reduction or limitation of retainage, if any, shall be as follows: (If the retainage established in Section 5.1.7.1 is to be modified prior to Substantial Completion of the entire Work, including modifications for Substantial Completion of portions of the Work as provided in Section 3.3.2, insert provisions for such modifications.) Not applicable. § 5.1.7.3 Except as set forth in this Section 5.1.7.3, upon Substantial Completion of the Work, the Contractor may submit an Application for Payment that includes the retainage withheld from prior Applications for Payment pursuant to this Section 5.1.7. The Application for Payment submitted at Substantial Completion shall not include retainage as follows: (Insert any other conditions for release of retainage upon Substantial Completion) Not gpplicable. AIA Document A1010-2017. Copyright 01915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1967, 1974, 1977, 1987, 1991, 1997. 2007 and 2017 by The American Institute of Architects. All rights reserved. WARNING: This AIA® Document is protected by U.S. Copyright Law and International 5 Treaties. Unauthorized reproduction or distribution of this AIAO Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. Page 147 of 366 § 5.1.8 If final completion of the Work is materially delayed through no fault of the Contractor, the Owner shall pay the Contractor any additional amounts in accordance with Article 9 of AIA Document A201-2017. § 5.1.9 Except with the Owner's prior approval, the Contractor shall not make advance payments to suppliers for materials or equipment which have not been delivered and stored at the site. § 5.2 Final Payment § 5.2.1 Final payment, constituting the entire unpaid balance of the Contract Sum, shall be made by the Owner to the Contractor when .1 the Contractor has fully performed the Contract except for the Contractor's responsibility to correct Work as provided in Article 12 of AIA Document A201-2017, and to satisfy other requirements, if any, which extend beyond final payment; and .2 a final Certificate for Payment has been issued by the Architect. § 5.2.2 The Owner's final payment to the Contractor shall be made no later than 30 days after the issuance of the Architect's final Certificate for Payment, or as follows: Within 30 days of Acceptance of the Public Improvement Contract by Dubuque City Council. § 5.3 Interest Payments due and unpaid under the Contract shall bear interest from the date payment is due at the rate stated below, or in the absence thereof, at the legal rate prevailing from time to time at the place where the Project is located. (Insert rate of interest agreed upon, if any) — A In accordance with Iowa Code 573 ARTICLE 6 DISPUTE RESOLUTION § 6.1 Initial Decision Maker The Architect will serve as the Initial Decision Maker pursuant to Article 15 of AIA Document A201-2017, unless the parties appoint below another individual, not a party to this Agreement, to serve as the Initial Decision Maker. (If the parties mutually agree, insert the name, address and other contact information of the Initial Decision Maker, if other than the Architect) Not applicable. § 6.2 Binding Dispute Resolution For any Claim subject to, but not resolved by, mediation pursuant to Article 15 of AIA Document A201-2017, the method of binding dispute resolution shall be as follows: (Check the appropriate box) Z Arbitration pursuant to Section 15.4 of AIA Document A201-2017 ❑ Litigation in a court of competent jurisdiction ❑ Other (Specify) If the Owner and Contractor do not select a method of binding dispute resolution, or do not subsequently agree in writing to a binding dispute resolution method other than litigation, Claims will be resolved by litigation in a court of competent jurisdiction. AIA Document A1010-2017. Copyright© 1915, 1918, 1925, 1937, 1951, 1958, 1961. 1963, 1967, 1974, 1977, 1987, 1991, 1997, 2007 and 2017 by The American Institute of Architects. All rights reserved. WARNING: This AIA® Document is protected by U.S. Copyright law and International 6 Treaties. Unauthorized reproduction or distribution of this AIA@ Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. Page 148 of 366 ARTICLE 7 TERMINATION OR SUSPENSION § 7.1 The Contract may be terminated by the Owner or the Contractor as provided in Article 14 of AIA Document A201-2017. § 7.1.1 If the Contract is terminated for the Owner's convenience in accordance with Article 14 of AIA Document A201-2017, then the Owner shall pay the Contractor a termination fee as follows: (Insert the amount of, or method for determining, the fee, if any, payable to the Contractor following a termination for the Owner's convenience) Not applicable. § 7.2 The Work may be suspended by the Owner as provided in Article 14 of AIA Document A201-2017 ARTICLE 8 MISCELLANEOUS PROVISIONS § 8.1 Where reference is made in this Agreement to a provision of AIA Document A201-2017 or another Contract Document, the reference refers to that provision as amended or supplemented by other provisions of the Contract Documents. § 8.2 The Owner's representative: (Name, address, email address, and other information) Nathan Steffen PE Civil En ig neer I Engineering Department City Hall 50 W. 13" Street, Dubuque, IA 52001 PH: 563.589.1734 § 8.3 The Contractor's representative: (Name, address, entail address, and other information) Matthew Mulligan Conlon Construction Co. 501 Bell Street, Suite 402 Dubuque, IA 52001 PH: 563.583.2162 § 8.4 Neither the Owner's nor the Contractor's representative shall be changed without ten days' prior notice to the other party. § 8.5 Insurance and Bonds § 8.5.1 The Owner and the Contractor shall purchase and maintain insurance as set forth in AIA Document Al0ITm 2017, Standard Form of Agreement Between Owner and Contractor where the basis of payment is a Stipulated Sum, Exhibit A, Insurance and Bonds, and elsewhere in the Contract Documents. § 8.5.2 The Contractor shall provide bonds as set forth in AIA Document Al O1Tm-2017 Exhibit A, and elsewhere in the Contract Documents. § 8.6 Notice in electronic format, pursuant to Article 1 of AIA Document A201-2017, may be given in accordance with a building information modeling exhibit, if completed, or as otherwise set forth below: (If other than in accordance with a building information modeling exhibit, insert requirements for delivering notice in electronic format such as name, title, and email address of the recipient and whether and how the system will be required to generate a read receipt for the transmission.) Not applicable. § 8.7 Other provisions: Not applicable. AIA Document A1010-2017. Copyright ©1915, 1918, 1925, 1937, 1951. 1958, 1961, 1963, 1967, 1974, 1977, 1987, 1991, 1997, 2007 and 2017 by The American Institute of Architects. All rights reserved. WARNING: This AIA® Document is protected by U.S. Copyright Law and International 7 Treaties. Unauthorized reproduction or distribution of this AIA@ Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. Page 149 of 366 ARTICLE 9 ENUMERATION OF CONTRACT DOCUMENTS § 9.1 This Agreement is comprised of the following documents: .1 AIA Document A 101 Tm-2017, Standard Form of Agreement Between Owner and Contractor .2 AIA Document A101TM-2017, Exhibit A, Insurance and Bonds .3 AIA Document A201TM-2017, General Conditions of the Contract for Construction .4 Building information modeling exhibit, dated as indicated below: (Insert the date of the building information modeling exhibit incoi porated into this Agreement.) Not applicable. .5 Drawings See Exhibit B. .6 Specifications See Exhibit C. .7 Addenda, if any: Number Date Pages 01 11/21/2024 32 02 11 /26/2024 44 Portions of Addenda relating to bidding or proposal requirements are not part of the Contract Documents unless the bidding or proposal requirements are also enumerated in this Article 9. .8 Other Exhibits: (Check all boxes that apply and include appropriate information identifying the exhibit where required.) ❑ AIA Document E204Tm-2017, Sustainable Projects Exhibit, dated as indicated below: (Insert the date of the E204-2017 incorporated into this Agreement.) Not applicable. ❑ The Sustainability Plan: Title Date Not applicable. Not applicable. ❑ Supplementary and other Conditions of the Contract: Not Applicable. Document Title Not applicable. Not applicable. Pages Not applicable. Date Pages Not applicable. Not applicable. AIA Document A101@-2017. Copyright © 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1967, 1974, 1977, 1987, 1991, 1997, 2007 and 2017 by The American Institute of Architects. All rights reserved. WARNING: This AIAO Document is protected by U.S. Copyright Law and International 8 Treaties. Unauthorized reproduction or distribution of this AIA@ Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. Page 150 of 366 .9 Other documents, if any, listed below: (List here any additional documents that are intended to form part of the Contract Documents. AIA Document A201Tm-2017provides that the advertisement or invitation to bid, Instructions to Bidders, sample forms, the Contractor's bid or proposal, portions of Addenda relating to bidding or proposal requirements, and other information ftfnlished by the Owner in anticipation of receiving bids or proposals, are not part of the Contract Documents unless enumerated in this Agreement. Any such documents should be listed here only if intended to be part of the Contract Documents) Insurance Schedule F — gty of Dubuque Requirements for General, Artisan or Trade Contractors, Subcontractors or Sub -Subcontractors attached as Exhibit AA. This Agreement entered into as of the day and year first written above. O ER (Signature) Michael C. Van Milligen, City Manager (Printed name and title) CONTRACT (Signature) N%R 7Tr1FNi t4l eyz ,J (Printed name and title) AIA Document A1010-2017. Copyright © 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1967, 1974, 1977, 1987, 1991. 1997, 2007 and 2017 by The American Institute of Architects. All rights reserved. WARNING: This AIAO Document is protected by U.S. Copyright Law and International 9 Treaties. Unauthorized reproduction or distribution of this AIA@ Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. Page 151 of 366 Bond No. 9059290 SECTION 00 61 13.01 Page 1 of 4 PERFORMANCE, PAYMENT AND MAINTENANCE BOND SECTION 00 61 13.01 KNOW ALL BY THESE PRESENTS: That we Conlon Construction Co. , as Principal (hereinafter the "Contractor" or "Principal") and Fidelity and Deposit Company of Maryland •--------------------------------------------------------------------------------- as Surety are held and firmly bound unto the City of Dubuque, Iowa, as Obligee (hereinafter referred to as "Owner"), and to all persons who may be injured by any breach of any of the conditions of this Bond in the penal sum of Nine million, two hundred seventy-three thousand five hundred thirty-eight dollars and zero cents ($ 9,273,538.00 ), lawful money of the United States, for the payment of which sum, well and truly to be made, we bind ourselves, our heirs, legal representatives and assigns, jointly or severally, firmly by these presents. The conditions of the above obligations are such that whereas said Contractor entered into a contract with the Owner, bearing date the 17th of December 2024, (hereinafter the "Contract")wherein said Contractor undertakes and agrees to construct the following project in accordance with the Contract Documents, and to faithfully perform all the terms and requirements of said Contract within the time therein specified, in a good and workmanlike manner, and in accordance with the Contract Documents. The Contract Documents for Iowa Amphitheater at Schmitt Island, Bid Package 2: Amphitheater Site Development Project detail the following described improvements: The project includes the construction of a tensile fabric canopy, site paving, site lighting, building structures, fencing, landscaping, deep foundations, cast in place concrete, utility work and additional constructed elements. It is expressly understood and agreed by the Contractor and Surety in this Bond that the following provisions are a part of this Bond and are binding upon said Contractor and Surety, to -wit: 1. PERFORMANCE: The Contractor shall well and faithfully observe, perform, fulfill, and abide by each and every covenant, condition, and part of said Contract and Contract Documents, by reference made a part hereof, for the project, and shall indemnify and save harmless the Owner from all outlay and expense incurred by the Owner by reason of the Contractor's default of failure to perform as required. The Contractor shall also be responsible for the default or failure to perform as required under the Contract and Contract Documents by all its subcontractors, suppliers, agents, or employees furnishing materials or providing labor in the performance of the Contract. 2. PAYMENT: The Contractor and the Surety on this Bond hereby agreed to pay all just claims submitted by persons, firms, subcontractors, and corporations furnishing materials for or performing labor in the performance of the Contract on account of which this Bond is given, including but not limited to claims for all amounts due for labor, materials, lubricants, oil, gasoline, repairs on machinery, equipment, and tools, consumed or used by the Contractor or any subcontractor, wherein the same are not satisfied out of the portion of the contract price the Owner is required to retain until completion of the improvement, but the Page 152 of 366 SECTION 00 61 13.01 Page 2 of 4 Contractor and Surety shall not be liable to said persons, firms, or corporations unless the claims of said claimants against said portion of the contract price shall have been established as provided by law. The Contractor and Surety hereby bind themselves to the obligations and conditions set forth in Chapter 573 of the Iowa Code, which by this reference is made a part hereof as though fully set out herein. 3. MAINTENANCE: The Contractor and the Surety on this Bond hereby agree, at their own expense: A. To remedy any and all defects that may develop in or result from work to be performed under the Contract Documents within the period of two (2) year(s) from the date of acceptance of the work under the Contract, by reason of defects in workmanship, equipment installed, or materials used in construction of said work,- B. To keep all work in continuous good repair; and C. To pay the Owner's reasonable costs of monitoring and inspection to assure that any defects are remedied, and to repay the Owner all outlay and expense incurred as a result of Contractor's and Surety's failure to remedy any defect as required by this section. Contractor's and Surety's Contract herein made extends to defects in workmanship or materials not discovered or known to the Owner at the time such work was accepted. 4. GENERAL: Every Surety on this Bond shall be deemed and held bound, any contract to the contrary notwithstanding, to the following provisions: A. To consent without notice to any extension of time authorized in approved change orders to the Contractor in which to perform the Contract; B. To consent without notice to any change in the Contract or Contract Documents, authorized in approved change orders which thereby increases the total contract price and the penal sum of this Bond, provided that all such changes do not, in the aggregate, involve an increase of more than twenty percent (20%) of the total contract price, and that this Bond shall then be released as to such excess increase; C. To consent without notice that this Bond shall remain in full force and effect until the Contract is completed, whether completed within the specified contract period, within an extension thereof, or within a period of time after the contract period has elapsed and the liquidated damage penalty is being charged against the Contractor. The Contractor and every Surety on the Bond shall be deemed and held bound, any contract to the contrary notwithstanding, to the following provisions: D. That no provision of this Bond or of any other contract shall be valid that limits to less than five (5) years after the acceptance of the work under the Contract the right to sue on this Bond. Page 153 of 366 SECTION 00 61 13.01 Page 3 of 4 E. That as used herein, the phrase "all outlay and expense" is not to be limited in any way, but shall include the actual and reasonable costs and expenses incurred by the Owner including interest, benefits, and overhead where applicable. Accordingly, "all outlay and expense" would include but not be limited to all contract or employee expense, all equipment usage or rental, materials, testing, outside experts, attorney's fees (including overhead expenses of the Owner's staff attorneys), and all costs and expenses of litigation as they are incurred by the Owner. It is intended the Contractor and Surety will defend and indemnify the Owner on all claims made against the Owner on account of Contractor's failure to perform as required in the Contract and Contract Documents, that all agreements and promises set forth in the Contract and Contract Documents, in approved change orders, and in this Bond will be fulfilled, and that the Owner will be fully indemnified so that it will be put into the position it would have been in had the Contract been performed in the first instance as required. In the event the Owner incurs any "outlay and expense" in defending itself against any claim as to which the Contractor or Surety should have provided the defense, or in the enforcement of the promises given by the Contractor in the Contract, Contract Documents, or approved change orders, or in the enforcement of the promises given by the Contractor and Surety in this Bond, the Contractor and Surety agree that they will make the Owner whole for all such outlay and expense, provided that the Surety's obligation under this Bond shall not exceed one hundred twenty-five percent (125%) of the penal sum of this Bond. In the event that any actions or proceedings are initiated regarding this Bond, the parties agree that the venue thereof shall be Dubuque County, State of Iowa. If legal action is required by the Owner to enforce the provisions of this Bond or to collect the monetary obligation incurring to the benefit of the Owner, the Contractor and the Surety agree, jointly, and severally, to pay the Owner all outlay and expense incurred therefor by the Owner. All rights, powers, and remedies of the Owner hereunder shall be cumulative and not alternative and shall be in addition to all rights, powers, and remedies given to the Owner, by law. The Owner may proceed against surety for any amount guaranteed hereunder whether action is brought against the Contractor or whether Contractor is joined in any such action(s) or not. NOW THEREFORE, the condition of this obligation is such that if said Principal shall faithfully perform all the promises of the Principal, as set forth and provided in the Contract, in the Contract Documents, and in this Bond, then this obligation shall be null and void, otherwise it shall remain in full force and effect. When a work, term, or phrase is used in this Bond, it shall be interpreted or construed first as defined in this Bond, the Contract, or the Contract Documents; second, if not defined in the Bond, Contract, or Contract Documents, it shall be interpreted or construed as defined in applicable provisions of the Iowa Code; third, if not defined in the Iowa Code, it shall be interpreted or construed according to its generally accepted meaning in the construction industry; and fourth, if it has no generally accepted meaning in the construction industry, it shall be interpreted or construed according to its common or customary usage. Failure to specify or particularize shall not exclude terms or provisions not mentioned and shall not limit liability hereunder. The Contract and Contract Documents are hereby made a part of this Bond. Page 154 of 366 SECTION 00 61 13.01 Page 4 of 4 Project No. 5575000022 Witness our hands, in triplicate, this 19th day of December , 2024. SURETY COUNTERSIGNED BY: Not Required Signature of Agent Printed Name of Agent Company Address City, State, Zip Code Company Telephone Number PRINCIPAL: Conlon Construction Co. Contractors gY I; /o .— Signature MA-n4rw ln"e Izzan( Printed Name Title FORM APPROVED BY: AJva kL I Re resentative for Owner SURETY: Ficiality a eposit Comp o and J tv.hr _ Sureiy omp +% /V By: Signa ure orney-in- ffi r Sara Hus n, Attorney -in -Fa IA Resident Agent Printed Name of Attorney -in -Fact Officer Holmes, Murphy and Associates LLC Company Name 2727 Grand Prairie Parkway Company Address Waukee, IA 50263 City, State, Zip Code (515) 223-6800 Company Telephone Number Page 155 of 366 ZURICH AMERICAN INSURANCE COMPANY COLONIAL AMERICAN CASUALTY AND SURETY COMPANY FIDELITY AND DEPOSIT COMPANY OF MARYLAND POWER OF ATTORNEY KNOW ALL MEN BY THESE PRESENTS: That the ZURICH AMERICAN INSURANCE COMPANY, a corporation of the State of New York, the COLONIAL AMERICAN CASUALTY AND SURETY COMPANY, a corporation of the State of Illinois, and the FIDELITY AND DEPOSIT COMPANY OF MARYLAND a corporation of the State of Illinois (herein collectively called the "Companies"), by Robert D. Murray, Vice President, in pursuance of authority granted by Article V, Section 8, of the By -Laws of said Companies, which are set forth on the reverse side hereof and are hereby certified to be in full force and effect on the date hereof, do hereby nominate, constitute, and appoint Craig E. HANSEN, Dione R. YOUNG, Jay D. FREIERMUTH, Brian M. DEIMERLY, Anne CROWNER, Mark R. DEWITT, Timothy MCCULLOH, Cindy BENNETT, John CORD, Ginger HOKE, Seth ROOKER, Kate ZANDERS, Sara HUSTON, Keeton WELCH, Taylor P. FOGLE, of Dallas, Texas, its true and lawful agent and Attorney -in - Fact, to make, execute, seal and deliver, for, and its behalf as surety, and as its act and deed: any and all bonds and undertakings, and the execution of such bonds or undertakings in pursuance of these presents, shall be as binding upon said Companies, as fully and amply, to all intents and purposes, as if they had been duly executed and acknowledged by the regularly elected officers of the ZURICH AMERICAN INSURANCE COMPANY at its office in New York, New York., the regularly elected officers of the COLONIAL AMERICAN CASUALTY AND SURETY COMPANY at its office in Owings Mills, Maryland., and the regularly elected officers of the FIDELITY AND DEPOSIT COMPANY OF MARYLAND at its office in Owings Mills, Maryland., in their own proper persons. The said Vice President does hereby certify that the extract set forth on the reverse side hereof is a true copy of Article V, Section 8, of the By -Laws of said Companies, and is now in force. IN WITNESS WHEREOF, the said Vice -President has hereunto subscribed his/her names and affixed the Corporate Seals of the said ZURICH AMERICAN INSURANCE COMPANY, COLONIAL AMERICAN CASUALTY AND SURETY COMPANY, and FIDELITY AND DEPOSIT COMPANY OF MARYLAND, this I Oth day of July, A.D. 2024. 01 INsu ., n„n,q „n G aiv . '. aR Co,,, , SEALm ; S �EALm m SEAL o zs ,m t- " ATTEST: ZURICH AMERICAN INSURANCE COMPANY COLONIAL AMERICAN CASUALTY AND SURETY COMPANY FIDELITY AND DEPOSIT COMPANY OF MARYLAND By: Thomas O. McClennan Vice President 19) um/L 4 V LS01 By: Dawn E. Brown Secretary State of Maryland County of Baltimore On this I0th day of July, A.D. 2024, before the subscriber, a Notary Public of the State of Maryland, duly commissioned and qualified, Thomas O. McClellan, Vice President and Dawn E. Brown, Secretary of the Companies, to me personally known to be the individuals and officers described in and who executed the preceding instrument, and acknowledged the execution of same, and being by me duly sworn, deposeth and saith, that he/she is the said officer of the Company aforesaid, and that the seals affixed to the preceding instrument are the Corporate Seals of said Companies, and that the said Corporate Seals and the signature as such officer were duly affixed and subscribed to the said instrument by the authority and direction of the said Corporations. IN TESTIMONY WHEREOF, I have hereunto set my hand and affixed my Official Seal the day and year first above written. Genevieve M. Maison GENEVIEVE M. MAISON =�€m PUeu° �:Z= NOTARY PUBLIC BALTIMORE COUNTY, MID MycommwionEvies JANUARY 27,2025 Authenticity of this bond can be confirmed at bondvalidator.zurichna.com or 410-559-8790 Page 156 of 366 EXTRACT FROM BY-LAWS OF THE COMPANIES "Article V, Section 8, Attorneys -in -Fact. The Chief Executive Officer, the President, or any Executive Vice President or Vice President may, by written instrument under the attested corporate seal, appoint attorneys -in -fact with authority to execute bonds, policies, recognizances, stipulations, undertakings, or other like instruments on behalf of the Company, and may authorize any officer or any such attorney -in -fact to affix the corporate seal thereto; and may with or without cause modify of revoke any such appointment or authority at any time." CERTIFICATE I, the undersigned, Vice President of the ZURICH AMERICAN INSURANCE COMPANY, the COLONIAL AMERICAN CASUALTY AND SURETY COMPANY, and the FIDELITY AND DEPOSIT COMPANY OF MARYLAND, do hereby certify that the foregoing Power of Attorney is still in full force and effect on the date of this certificate; and I do further certify that Article V, Section 8, of the By -Laws of the Companies is still in force. This Power of Attorney and Certificate may be signed by facsimile under and by authority of the following resolution of the Board of Directors of the ZURICH AMERICAN INSURANCE COMPANY at a meeting duly called and held on the 15th day of December 1998. RESOLVED: "That the signature of the President or a Vice President and the attesting signature of a Secretary or an Assistant Secretary and the Seal of the Company may be affixed by facsimile on any Power of Attorney ... Any such Power or any certificate thereof bearing such facsimile signature and seal shall be valid and binding on the Company." This Power of Attorney and Certificate may be signed by facsimile under and by authority of the following resolution of the Board of Directors of the COLONIAL AMERICAN CASUALTY AND SURETY COMPANY at a meeting duly called and held on the 5th day of May, 1994, and the following resolution of the Board of Directors of the FIDELITY AND DEPOSIT COMPANY OF MARYLAND at a meeting duly called and held on the I0th day of May, 1990. RESOLVED: "That the facsimile or mechanically reproduced seal of the company and facsimile or mechanically reproduced signature of any Vice -President, Secretary, or Assistant Secretary of the Company, whether made heretofore or hereafter, wherever appearing upon a certified copy of any power of attorney issued by the Company, shall be valid and binding upon the Company with the same force and effect as though manually affixed. IN TESTIMONY WHEREOF, I have hereunto subscribed my name and affixed the corporate seals of the said Companies, this 191th day of December , 2024 s"an '',, a`&�1'POi'"��'p^''i �oSEALm� : a$�G•`"POU�4o''. �cSEALmf 5�� co,,, a��00QoQ'�.POHi'�': '��unu�uuPa•``` 4pNF1Y1YOF�pP`'``, ry.,.rnpn,J"�`• Mary Jean Pethick Vice President TO REPORT A CLAIM WITH REGARD TO A SURETY BOND, PLEASE SUBMIT A COMPLETE DESCRIPTION OF THE CLAIM INCLUDING THE PRINCIPAL ON THE BOND, THE BOND NUMBER, AND YOUR CONTACT INFORMATION TO: Zurich Surety Claims 1299 Zurich Way Schaumburg, IL 60196-1056 rei)ortsfclaims@zurichna.com 800-626-4577 Authenticity of this bond can be confirmed at bondvalidator.zurichna.com or 410-559-8790 Page 157 of 366