Loading...
Southgate Drive Sanitary Sewer Improvements Project - Award Public Improvement ContractCity of Dubuque City Council ACTION ITEMS # 2. Copyrighted March 3, 2025 ITEM TITLE: Southgate Drive Sanitary Sewer Improvements Project - Award Public Improvement Contract SUMMARY: City Manager recommending City Council award the public improvement contract for the Southgate Drive Sanitary Sewer Improvements Project to Tschiggfrie Excavating, Co. in the amount of $196,666.80, which is 1.58% above the engineer's estimate, through the adoption of the attached resolution. RESOLUTION Awarding Public Improvement Contract For The Southgate Drive Sanitary Sewer Improvement Project SUGGUESTED Receive and File; Adopt Resolution(s) DISPOSITION: ATTACHMENTS: 1. MVM Memo 2. Southgate Drive Sanitary Sewer Improvements Project - Council Award Memo 3. Southgate Drive Sanitary Sewer Improvements Project - Council Award Resolution 4. Southgate Drive Sanitary Sewer Improvement Project - Bid Tabulation Page 623 of 629 THE CITY OF DUBE Masterpiece on the Mississippi TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: Southgate Drive Sanitary Sewer Improvements Project Award Public Improvement Contract Project No. 5581500048 DATE: February 25, 2025 Dubuque AI WIN av 2007-2012.2013 2017*2019 City Engineer Gus Psihoyos is recommending City Council award the public improvement contract for the Southgate Drive Sanitary Sewer Improvements Project to Tschiggfrie Excavating, Co. in the amount of $196,666.80, which is 1.58% above the engineer's estimate, through the adoption of the attached resolution. I concur with the recommendation and respectfully request Mayor and City Council approval. v Mic ael C. Van Milligen MCVM:sv Attachment cc: Crenna Brumwell, City Attorney Cori Burbach, Assistant City Manager Gus Psihoyos, City Engineer Page 624 of 629 THE CITY OF DUB E Masterpiece on the Mississippi TO: Michael C. Van Milligen, City Manager FROM: Gus Psihoyos, City Engineer DATE: February 24, 2025 SUBJECT: Southgate Drive Sanitary Sewer Improvements Project Award Public Improvement Contract Project No. 5581500048 INTRODUCTION Dubuque *Awin ah �I ICW1L CIVIC: I I�NA 1� 2007-2012.2013 2017*2019 The attached resolution authorizes the award of the public improvement contract for the Southgate Drive Sanitary Sewer Improvements Project. BACKGROUND The existing sewer located along Southgate Drive is damaged in several locations. Sewer pipe defects prevent crews from inspecting or adequately maintaining the existing sewer, increasing the risk of sanitary sewer overflows. Existing sewer needs replacement. DISCUSSION The project will provide for the replacement of 276 linear feet of 8-inch diameter sanitary sewer main having a depth of fourteen to twenty-one feet, including the replacement of two sanitary sewer manholes, restoring sanitary service lines, crossing water main and other utilities, and pavement removal and replacement. BID RESULTS The City received sealed bids on February 20, 2025 for the Southgate Drive Sanitary Sewer Improvements Project. Tschiggfrie Excavating of Dubuque, Iowa submitted the low bid in the amount of $196,666.80. A summary of the bid proposals received is as follows: Contractor Name Total Bid Amount Tschiggfrie Excavating, Co. $196,666.80 Top Grade Excavating, Inc. $207,072.50 Pirc-Tobin $220,095.00 Connolly Construction, Inc. $221,878.50 Page 625 of 629 Eastern Iowa Excavating & Concrete, LLC $227,883.60 Gansen Excavating, Inc. $228,391.82 RECOMMENDATION I recommend awarding the public improvement contract for the Southgate Drive Sanitary Sewer Improvements Project to Tschiggfrie Excavating Co. in the amount of $196,666.80. The bid amount is 1.58% above the engineer's estimate. BUDGETIMPACT The estimate of probable cost for the Southgate Drive Sanitary Sewer Improvements Project is summarized as follows: Description Estimate Award Construction $ 193,600.00 $196,666.80 Contingency $ 29,040.00 $29,040.00 Total Project Cost $ 222,640.00 $225,706.80 Southgate Drive Sanitary Sewer Improvements Project Construction Funding 5581500048 Southgate Sanitary Sewer Reconstruction $ 205,000.00 Any project construction overages would be covered through a future budget amendment request through the CIP and amounts shown below, if needed. Southgate Drive Sanitary Sewer Improvements Future Budget Amendment Project Contingency Funding 5581500017 General Sanitary Sewer Repairs $ 20,706.80 ACTION TO BE TAKEN The City Council is requested to award the public improvement contract for the Southgate Drive Sanitary Sewer Improvements Project to Tschiggfrie Excavating, Co. in the amount of $196,666.80, through the adoption of the attached resolution. 2 Page 626 of 629 Prepared by Kerry Bradley, City of Dubuque Engineering, 50 W. 13th St. Dubuque, IA 52001 (563)589-4270 Return to Adrienne N. Breitfelder City Clerk City of Dubuque, 50 W. 13th St. Dubuque, IA 52001 (563)589-4100 RESOLUTION NO. 89-25 AWARDING PUBLIC IMPROVEMENT CONTRACT FOR THE SOUTHGATE DRIVE SANITARY SEWER IMPROVEMENT PROJECT Whereas, sealed proposals have been submitted by contractors for the Southgate Drive Sanitary Sewer Improvement Project, (the Project) pursuant to Resolution No. 38- 25 and Notice to Bidders published on the City of Dubuque, Iowa website and plan room service with statewide circulation on the 6th day of February 2024; and Whereas, said sealed proposals were opened and read on the 20th day of February 2025 and it has been determined that Tschiggfrie Excavating Co. of Dubuque, Iowa, in the bid amount of $196,666.80, is the lowest responsive, responsible bidder for the Project. NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: That a Public Improvement Contract for the Project is hereby awarded to Tschiggfrie Excavating Co. and the City Manager is hereby directed to execute a Public Improvement Contract on behalf of the City of Dubuque for the Project. Passed, approved, and adopted this 3rd day of March 2025. Attest: Adrienne Breitfelder, CMC City Clerk NOON / • v. • THE CITY OF DUB E Masterpiece on the Mississippi ury or wuouque, rowa Bid Tabulation Project Title: Southgate Drive Sanity Improvement 9 Sanitarypr Bltl Data Engineer's Estimate g Tschi ie Excavating gl�rr g Co. To Grade Excavating p g Inc. Pirc-Tobin Connolly Construction y Inc. Eastern Iowa Excavating and Gansen ExcavatingInc. 20-Feb-25 Concrete LLC R BID ITEM DESCRIPTION UNIT PRICE TOTAL PRICE TOTAL PRICE TOTAL PRICE TOTAL PRICE TOTAL PRICE TOTAL PRICE TOTAL PRICE NUMBERE QUAN7N7Y UNIT UNfT PRICE UNIT PRICE UNf7 PRICE UNIT PRICE UNf7 PRICE UNIT PRICE Division 2010 - Earthwork, Subgratle, and Subbase 2010-108-J-0 Subbase, Modified Subbase - Gr 14 (Modified Subbase Pile) 400 TON $ 2000. $ 8,000.00 $ 21.00 $ 8,400.00 $ 30.00 $ 12,000.00 $ 22.50 $ 9,000.00 $ 22.20 $ 8,880.00 $ 1900. $ 7,600.00 $ 14.60 $ 5,840.00 Sub Total $ 8,000.00 Sub Total $ 8,400.00 Sub Total $ 12,000.00 Sub Total $ 9,000.00 Sub Total $ 8,880.00 Sub Total $ 7,600.00 Sub Total $ 5,840.00 Division 3010 - Trench Excavation and Backfill 3010-108-D-0 Replacement of Unsuitable Backfill Material, Gr 32, (Man Sand Pile) 3700 TON $ 10.00 $ 37,000.00 $ 2200. $ 81,400.00 $ 10.00 $ 37,000.00 $ 5.00 $ 18,500.00 $ 2040. $ 75,480.00 $ 18.00 $ 66,600.00 $ 16.00 $ 59,200.00 3010-108-G-0 Class I, Bedding Material, 1" Commercial Clean Stone 200 TON $ 18.50 $ 3,700.00 $ 26.00 $ 5,200.00 $ 23.50 $ 4,700.00 $ 16.00 $ 3,200.00 $ 19.30 $ 3,860.00 $ 22.25 $ 4,450.00 $ 18.00 $ 3,600.00 Sub Total $ 40,700.00 Sub Total $ 86,600.00 Sub Total $ 41,700.00 Sub Total $ 21,700.00 Sub Total $ 79,340.00 Sub Total $ 71,050.00 Sub Total $ 62,800.00 Division 4010 - Sanitary Sewers 4010-108-A-1 Sanitary Sewer Gravity Main, Trenched, 8" PVC SDR26 276 LF $ 100.00 $ 27,600.00 $ 56.00 $ 15,456.00 $ 99.00 $ 27,324.00 $ 200.00 $ 55,200.00 $ 169.00 $ 46,644.00 $ 158.00 $ 43,608.00 $ 215.00 $ 59,340.00 4010-108-E-1 Sanitary Sewer Service Stub, Trenched, 4" PVC SDR26 175 LF $ 65.00 $ 11,375.00 $ 44.00 $ 7,700.00 $ 14.00 $ 2,450.00 $ 25.00 $ 4,375.00 $ 36.00 $ 6,300.00 $ 108.50 $ 18,987.50 $ 14.55 $ 2,546.25 4010-108-H-0 Removal of Sanitary Sewer, 8" 276 LF $ 7.50 $ 2,070.00 $ 4.10 $ 1,131.60 $ 20.50 $ 5,658.00 $ 5.00 $ 1,380.00 $ 6.60 $ 1,821.60 $ 6.15 $ 1,697.40 $ 6.00 $ 1,656.00 Sub Total $ 41,045.00 Sub Total $ 24,287.60 Sub Total $ 35,432.00 Sub Total $ 60,955.00 Sub Total $ 54,765.60 Sub Total $ 64,292.90 Sub Total $ 63,542.25 Division 6010 - Structures for Sanitary and Storm Sewere 6010-108-A-0 Manhole Type, 48"SW-301 33 VF $ 725.00 $ 23,925.00 $ 480.00 $ 15,840.00 $ 617.00 $ 20,361.00 $ 625.00 $ 20,625.00 $ 525.00 $ 17,325.00 $ 655.00 $ 21,615.00 $ 592.41 $ 19,549.53 6010-108-H-1 Remove Manhole 2 FA $ 1,250.00 $ 2,500.00 $ 670.00 $ 1,340.00 $ 2,335.00 $ 4,670.00 $ 1,500.00 $ 3,000.00 $ 11050.00 $ 2,100.00 $ 1,175.00 $ 2,350.00 $ 1,500.00 $ 3,000.00 Sub Total $ 26,425.00 Sub Total $ 17,180.00 Sub Total $ 25,031.00 Sub Total $ 23,625.00 Sub Total $ 19,425.00 Sub Total $ 23,965.00 Sub Total $ 22,549.53 Division 7020 - Hot Mix Asphalt Pavement 7020-108-A-0 HMA Pavement by Ton 155 TON $ 120.00 $ 18,600.00 $ 110.00 $ 17,050.00 $ 104.35 $ 16,174.25 $ 115.00 $ 17,825.00 $ 105.00 $ 16,275.00 $ 110.00 $ 17,050.00 $ 115.95 $ 17,972.25 7020-108-A-0 HMA Base Layer Pavement by Ton 155 TON $ 120.00 $ 18,600.00 $ 110.00 $ 17,050.00 $ 104.35 $ 16,174.25 $ 115.00 $ 17,825.00 $ 105.00 $ 16,275.00 $ 110.00 $ 17,050.00 $ 115.95 $ 17,972.25 sub Total $ 37,200.00 Sub Total $ 34,100.00 Sub Total $ 32,348.50 Sub Total $ 35,650.00 Sub Total $ 32,550.00 Sub Total $ 34,100.00 Sub Total $ 35,944.50 Division 7030 - Sidewalks, Shared Use Paths, and Driveways 7030-108-A-3 Removal of Driveway 9 SY $ 15.00 $ 135.00 $ 24.00 $ 216.00 $ 28.50 $ 256.50 $ 35.00 $ 315.00 $ 21.60 $ 194.40 $ 43.50 $ 391.50 $ 13.00 $ 117.00 7030-108-H-1 Driveway, Paved, PCC, 6" (Thickness) 9 SY $ 75.00 $ 675.00 $ 69.00 $ 621.00 $ 100.00 $ 900.00 $ 125.00 $ 1,125.00 $ 100.00 $ 900.00 $ 102.00 $ 918.00 $ 90.25 $ 812.25 Sub Total $ 810.00 Sub Total $ 837.00 Sub Total $ 1,156.50 Sub Total $ 1,440.00 Sub Total $ 1,094.40 Sub Total $ 1,309.50 Sub Total $ 929.25 Division 7040 - Pavement Rehabilitation 7040-108-H-0 Pavement -Removal 812 SY $ 10.00 $ 8,120.00 $ 3.60 $ 2,923.20 $ 21.50 $ 17,458.00 $ 10.00 $ 8,120.00 $ 6.50 $ 5,278.00 $ 8.85 $ 7,186.20 $ 13.00 $ 10,556.00 7040-108-N-0 Curb and Gutter, Remove and Replace 101 LF $ 50.00 $ 5,050.00 $ 39.00 $ 3,939.00 $ 46.50 $ 4,696.50 $ 65.00 $ 6,565.00 $ 40.50 $ 4,090.50 $ 69.50 $ 7,019.50 $ 43.29 $ 4,372.29 Sub Total $ 13,170.00 Sub Total $ 6,862.20 Sub Total $ 22,154.50 Sub Total $ 14,685.00 Sub Total $ 9,368.50 Sub Total $ 14,205.70 Sub Total $ 14,928.29 Division 8030 - Temporaryfraf0c Control 8030-108-A-0 Temporary Traffic Control 1 LS $ 7,500.00 $ 7,500.00 $ 1,800.00 $ 1,800.00 $ 2,000.00 $ 2,000.00 $ 2,500.00 $ 2,500.00 $ 1,650.00 $ 1,650.00 $ 1,750.00 $ 1,750.00 $ 1,732.50 $ 1,732.50 Sub Total $ 7,500.00 Sub Total $ 1,800.00 Sub Total $ 2,000.00 Sub Total $ 2,500.00 Sub Total $ 1,650.00 Sub Total $ 1,750.00 Sub Total $ 1,732.50 Division 9040 - Erosion and Sediment Control 9040-108-T-1 Inlet Protection Device, Installation 2 EA $ 50.00 $ 100.00 $ 290.00 $ 580.00 $ 275.00 $ 550.00 $ 75.00 $ 150.00 $ 105.00 $ 210.00 $ 135.50 $ 271.00 $ 57.75 $ 115.50 9040-108-T-2 Inlet Protection Device, Maintenance 2 EA $ 50.00 $ 100.00 $ 110.00 $ 220.00 $ 100.00 $ 200.00 $ 20.00 $ 40.00 $ 105.00 $ 210.00 $ 57.25 $ 114.50 $ 200.00 $ 400.00 Sub Total $ 200.00 Sub Total $ 800.00 Sub Total $ 750.00 Sub Total $ 190.00 Sub Total $ 420.00 Sub Total $ 385.50 Sub Total $ 515.50 Division 11,020 - Mobilization 11020-108-A-0 Mobilization 1 LS $ 16,000.00 $ 16,000.00 $ 13,800.00 $ 13,800.00 $ 32,000.00 $ 32,000.00 $ 50,000.00 $ 50,000.00 $ 13,350.00 $ 13,350.00 $ 8,000.00 $ 8,000.00 $ 15,000.00 $ 15,000.00 Sub Total $ 16,000.00 Sub Total $ 13,800.00 Sub Total $ 32,000.00 Sub Total $ 50,000.00 Sub Total $ 13,350.00 Sub Total $ 8,000.00 Sub Total $ 15,000.00 Division 11,030 - Temporary Services During Construction 11030-108-B-0 Maintenance of Solid Waste Collection 1 LS $ 1,250.00 $ 1,250.00 $ 600.00 $ 600.00 $ 2,000.00 $ 2,000.00 $ 250.00 $ 250.00 $ 560.00 $ 560.00 $ 550.00 $ 550.00 $ 4,410.00 $ 4,410.00 Sub Total $ 1,250.00 Sub Total $ 600.00 Sub Total $ 2,000.00 Sub Total $ 250.00 Sub Total $ 560.00 Sub Total $ 550.00 Sub Total $ 4,410.00 Division 11,050 - Concrete Washout 11050-108-A-0 Concrete Washout 1 LS $ 1,300.00 $ 1,300.00 $ 1,400.00 $ 1,400.00 $ 500.00 $ 500.00 $ 100.00 $ 100.00 $ 475.00 $ 475.00 $ 675.00 $ 675.00 $ 200.00 $ 200.00 Sub Total $ 1,300.00 Sub Total $ 1,400.00 Sub Total $ 500.00 Sub Total $ 100.00 Sub Total $ 475.00 Sub Total $ 675.00 Sub Total $ 200.00 Total Base Bid Amount $ 193,600.00 $ 196,666.80 $ 207,072.50 $ 220,095.00 $ 221,878.50 $ 227,883.60 $ 228,391.82 Total Bid Amount: $ 193,600.00 $ 196,666.80 $ 207,072.50 $ 220,095.00 $ 221,878.50 $ 227,883.60 $ 228,391.82 Total Bid $ 196,666.80 Total Bid $ 207,072.50 Total Bid $ 220,095.00 Total Bid $ 221,878.50 Total Bid $ 227,883.60 Total Bid $ 228,391.82 % Over I Under (-) 1.58 % 6.96% 13.69 % 14.61 % 17.71 % 17.97% Page 628 of 629