Loading...
City IT Department Commercial Office Renovation Project - Acceptance of Public Improvement Construction ContractCity of Dubuque City Council CONSENT ITEMS # 11. Copyrighted May 5, 2025 ITEM TITLE: City IT Department Commercial Office Renovation Project - Acceptance of Public Improvement Construction Contract SUMMARY: City Manager recommending City Council adopt the attached resolution to accept the Public Improvements and to authorize the payment of the contract amount of $449,461.00 to Sheets Design Build, of Maquoketa, IA, for the City IT Department Commercial Office Renovation Project. RESOLUTION Accepting The City IT Department Commercial Office Renovation Project And Authorizing Final Payment To The Contractor SUGGUESTED Receive and File; Adopt Resolution(s) DISPOSITION: ATTACHMENTS: 1. MVM Memo 2. 1 Memo Acceptance City IT Department Commercial Office Renovation Project 3. 2 Acceptance Resolution City IT Dept Office Reno Project 4. 3 Engineer's Certificate of Completion Page 167 of 326 THE CITY OF DUBE Masterpiece on the Mississippi TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: City IT Department Commercial Office Renovation Project Acceptance of Public Improvement Construction Contract Project 7769900001 DATE: April 30, 2025 Dubuque AI WIN av 2007-2012.2013 2017*2019 Project Manager Jim Bousley and Chief Information Officer Joe Pregler are recommending City Council adopt the attached resolution to accept the Public Improvements and to authorize the payment of the contract amount of $449,461.00 to Sheets Design Build, of Maquoketa, IA, for the City IT Department Commercial Office Renovation Project. The final contract amount of $449,461.00 is a 46.02% increase above the original contract amount of $307,800.00. The additional cost is due to change orders in the amount of $141,661 for door hardware revisions, additional fire alarm, power to EDH 3, breakers at panels, move existing light fixtures, add junction box, move existing light fixtures, power monitoring, reverse fire separation, repair cubicle cables, modify emergency egress path and the installation of a Knox box. I concur with the recommendation and respectfully request Mayor and City Council approval. Y Mic ael C. Van Milligen MCVM:sv Attachment cc: Crenna Brumwell, City Attorney Cori Burbach, Assistant City Manager Gus Psihoyos, City Engineer Jim Bousley, Project Manager Joe Pregler, Chief Information Officer Justin Hogan, Facilities Manager Page 168 of 326 THE C Dubuque DUUB--*--TE MI-America City Masterpiece on the Mississippi 2002-2013 2017*2019 TO: Michael C. Van Milligen, City Manager FROM: Jim Bousley, Project Manager Joe Pregler, Chief Information Officer DATE: April 28, 2025 RE: City IT Department Commercial Office Renovation Project Acceptance of Public Improvement Construction Contract Project 7769900001 INTRODUCTION The attached resolution provides for the acceptance of the public improvement construction contract for the City IT Department Commercial Office Renovation Project at 7900 Chavenelle Road, Dubuque, IA. BACKGROUND This project involved the renovation of approximately 2,600 SF of commercial office space to create a new office location for the City's Information Services Department. Building systems modified by this project include fire suppression and alarm system, plumbing, HVAC, electrical, and low voltage communications. The award of the construction contract also included selection of the one bid alternate. This alternate provided for modifications to Heat Pump #4 which physically separates the HVAC system so that there is a complete system serving just the Information Technology and Traffic Center rooms. By making this improvement city staff will have direct & full control of the HVAC system serving its space and not have to collaborate with other building tenants regarding adjusting temperature controls, and responsibility for equipment breakdowns. DISCUSSION The City IT Department Commercial Office Renovation Project was completed by Sheets Design Build in the final contract amount of $449,461 which is a 46.02% increase above the original contract amount of $307,800. The additional cost is due to change orders in the amount of $141,661 for door hardware revisions, additional fire alarm, power to EDH 3, breakers at panels, move existing light fixtures, add junction box, move existing light fixtures, power monitoring, reverse fire separation, repair cubicle cables, modify emergency egress path and the installation of a Knox box. Page 169 of 326 Change Order #1 Door hardware revisions ($1,514) Additional Fire Alarm $16,105 Power to EDH 3 $3,760 Change Order #2 Breakers at Panels $6,002 Move existing light fixtures $396 Add junction box $2,204 Change Order #3 Move existing light fixtures $1,282 Door hardware revisions $5,402 Power monitoring $22,351 Change Order #4 Reverse fire separation $58,689 Change Order #5 Repair cubicle cables $3,478 Change Order #6 Modify emergency egress path $22.706 Change Order #7 Knox box $800 TOTAL CHANGE ORDERS $141,661 RECOMMENDATION I recommend that the City Council accept the Public Improvements and authorize the payment of the contract amount of $449,461 to Sheets Design Build for the City IT Department Commercial Office Renovation Project. BUDGETIMPACT The project cost for the City IT Department Commercial Office Renovation Project is as follows: Description Award Final Construction Contract $ 307,800 $449,461 Construction Design, Engineering & Inspection 30,780 23,760 Office Furniture 0.00 $5,460 Total $338,580 $478,681 2 Page 170 of 326 The project funding summary is as follows: Project No. Fund Description Fund Amount 7769900001 IS Office Redesign 478,681 Total Project Funding $478,681 ACTION TO BE TAKEN The City Council is requested to adopt the attached resolution to accept the Public Improvements and to authorize the payment of the contract amount of $449,461 to Sheets Design Build, of Maquoketa, IA, for the City IT Department Commercial Office Renovation Project. cc: Gus Psihoyos, City Engineer Justin Hogan, Facilities Manager 3 Page 171 of 326 Prepared by Kerry Bradley City of Dubuque Engineering 50 W. 1311 St Dubuque IA 52001 (563)589-4270 Return to Adrienne N. Breitfelder City Clerk City of Dubuque, 50 W. 13" St. Dubuque, IA 52001 (563)589-4100 RESOLUTION NO. 151-25 ACCEPTING THE CITY IT DEPARTMENT COMMERCIAL OFFICE RENOVATION PROJECT AND AUTHORIZING FINAL PAYMENT TO THE CONTRACTOR WHEREAS, the Public Improvement Contract for the City IT Department Commercial Office Renovation Project (the Project) has been completed by the contractor, Sheets Design Build (Contractor), and the City Engineer has examined the work and recommends that the Project be accepted; and WHEREAS, the final contract amount for the Project is $449,461.00; and WHEREAS, the Contractor has previously been paid $426,228.00, leaving a balance of $23,233.00; and WHEREAS, the City Council finds that the recommendation of the City Engineer should be accepted. NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: Section 1. The recommendation of the City Engineer is approved and the Project is hereby accepted. Section 2. The Director of Finance and Budget is hereby directed to pay the balance of the retainage of $23,233.00 as provided in Iowa Code chapter 573, and to pay such retainage in accordance with the provisions of Iowa Code chapter 573 or Iowa chapter 26.13. Passed, approved and adopted this 5th day of May 2025. Bra anagh, Mayor Attest: Adrienne N. Breitfeld4, CMC City Clerk CITY ENGINEER'S CERTIFICATE OF FINAL COMPLETION OF THE CITY IT DEPARTMENT COMMERCIAL OFFICE RENOVATION PROJECT The undersigned City Engineer of the City of Dubuque, Iowa, hereby certifies that he has inspected the City IT Department Commercial Office Renovation Project and work has been performed in compliance with the terms of the Public Improvement Contract, and that the total cost of the completed work is $478,861.00. Dated this 30th day of April 2025. Gus Psihoyos, City Engineer Filed in the office of the City Clerk on the 30th day of April 2025. Adrienne N. Breitfelder, CMC City Clerk Page 173 of 326