Award 2025 ADA Sidewalk Curb Ramp Project OneCity of Dubuque City Council CONSENT ITEMS # 10. Copyrighted May 19, 2025 ITEM TITLE: Award 2025 ADA Sidewalk Curb Ramp Project One SUMMARY: City Manger recommending City Council award the construction contract for the 2025 ADA Sidewalk Curb Ramp Project One through the adoption of the attached resolution to Midwest Concrete, Inc. in the amount of $81,602.58 which is 15.4% below the engineer's estimate. RESOLUTION Awarding Public Improvement Contract for the 2025 ADA Sidewalk Curb Ramp Project One SUGGUESTED Receive and File; Adopt Resolution(s) DISPOSITION: ATTACHMENTS: 1. MVM Memo 2. 2025 ADA Project One Award Recording Memo 3. 2025 ADA Sidewalk Curb Ramp Project One - Council Award RESOLUTION 4. Bid Tab 2025 RAMP PROJECT - ONE Page 182 of 950 Dubuque THE CITY OF uFA�a9a av DuBE 13 Masterpiece on the Mississippi zoo�•*o rP PP 2017202019 TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: Award Recording Memo 2025 ADA Sidewalk Curb Ramp Project One DATE: May 13, 2025 City Engineer Gus Psihoyos is recommending City Council award the construction contract for the 2025 ADA Sidewalk Curb Ramp Project One through the adoption of the attached resolution to Midwest Concrete, Inc. in the amount of $81,602.58 which is 15.4% below the engineer's estimate. The 2025 ADA Sidewalk Curb Ramp Project One will provide for the replacement of access ramps on Asbury Road from John F. Kennedy Road to Avalon Street in conjunction with the Public Works Asphalt Overlay program at the following locations: 1. Asbury Road and John F. Kennedy Road, three directional ADA sidewalk curb ramps and one non -directional ADA sidewalk curb ramp. 2. Asbury Road and Crissy Street, two directional ADA sidewalk curb ramps. 3. Asbury Road and Evergreen Street, two directional ADA sidewalk curb ramps. 4. Asbury Road and Woodlawn Street, two directional ADA sidewalk curb ramps. 5. Asbury Road and Avalon Street, two directional ADA sidewalk curb ramps. I concur with the recommendation and respectfully request Mayor and City Council approval. k�4 S4-zn,� Mic ael C. Van Milligen MCVM:sv Attachment cc: Crenna Brumwell, City Attorney Cori Burbach, Assistant City Manager Gus Psihoyos, City Engineer Arielle Swift, Public Works Director Adam Decker, Engineering Technician Page 183 of 950 Dubuque THE CITY OF DUBQTE����� *Ameriea City II Masterpiece on the Mississippi P pp 2°°2 -2013 zo1�*7*Z019i9 TO: Michael C. Van Milligen, City Manager FROM: Gus Psihoyos, City Engineer SUBJECT: Award Recording Memo 2025 ADA Sidewalk Curb Ramp Project One DATE: May 12, 2025 INTRODUCTION The attached resolution authorizes the award of the public improvement construction contract for the 2025 ADA Sidewalk Curb Ramp Project One. BACKGROUND Since 1990, the City of Dubuque has installed pedestrian access ramps around the City of Dubuque to conform with the American with Disabilities Act (ADA). The pedestrian access ramps allow people with mobility difficulties to access the City's sidewalk system. The design standards for these ramps have evolved over time as more ramps have been installed and standards have changed. Since 2011, The City of Dubuque follows the Accessibility Guidelines for Pedestrian Facilities in the Public Right -of -Way. These are updated standards to use for facilities in the public right-of-way and addressed issues brought up since the original ADA standards were developed. The Iowa Department of Transportation has adopted the PROWAG standards. The Federal Highway Administration (FHWA) has also adopted the standards and requires all cities that receive federal funding to follow these standards. DISCUSSION The 2025 ADA Sidewalk Curb Ramp Project One will provide for the replacement of access ramps on Asbury Road from John F. Kennedy Road to Avalon Street in conjunction with the Public Works Asphalt Overlay program at the following locations: 1. Asbury Road and John F. Kennedy Road, three directional ADA sidewalk curb ramps and one non -directional ADA sidewalk curb ramp. 2. Asbury Road and Crissy Street, two directional ADA sidewalk curb ramps. 3. Asbury Road and Evergreen Street, two directional ADA sidewalk curb ramps. 4. Asbury Road and Woodlawn Street, two directional ADA sidewalk curb ramps. 5. Asbury Road and Avalon Street, two directional ADA sidewalk curb ramps. BID RESULTS The City received bids on May 1, 2025, for the 2025 ADA Sidewalk Curb Ramp Project One. Midwest Concrete, Inc. of Peosta, IA, submitted the low bid in the amount of $81,602.58 which is 15.4% below the engineer's estimate. A summary of the bid proposals received is as follows: Page 184 of 950 Contractor Name Total Bid Midwest Concrete Inc. $ 81,602.58 Drew Cook and Sons Excavating $ 82,470.65 Valentine Construction $ 101,357.37 Eastern Iowa Excavating and Concrete $ 103,011.42 Tschiggfrie Excavating $ 141,902.10 RECOMMENDATION I recommend awarding the contract for the 2025 ADA Sidewalk Curb Ramp Project One to Midwest Concrete, Inc. in the amount of $81,602.58. The funding summary is as follows: Description Cost Estimate Award Construction $ 96,486.84 $ 81,602.58 Contingency 14,473.03 14,473.03 Engineering Design and Administration 16,643.98 16,643.98 Total Construction Cost Estimate $ 127,603.84 $ 112,719.59 ACTION TO BE TAKEN The City Council is requested to award the construction contract for the 2025 ADA Sidewalk Curb Ramp Project One through the adoption of the attached resolution to Midwest Concrete, Inc. in the amount of $81,602.58. Attach. Prepared by Jon Dienst, P.E. cc: Arielle Swift, Public Works Director Adam Decker, Engineering Technician Page 185 of 950 Prepared by Kerry Bradley City of Dubuque Engineering, 50 W. 13th St. Dubuque, IA 52001 l5631589-4270 Return to Adrienne N. Breitfelder City Clerk City of Dubuque, 50 W. 13th St. Dubuque, IA 52001 (563)589-4100 RESOLUTION NO. 162-25 AWARDING PUBLIC IMPROVEMENT CONTRACT FOR THE 2025 ADA SIDEWALK CURB RAMP PROJECT ONE Whereas, sealed proposals have been submitted by contractors for the 2025 ADA Sidewalk Curb Ramp Project One, (the Project) and Notice to Bidders published on the City of Dubuque, Iowa website and plan room service with statewide circulation on the 17th day of April 2025; and Whereas, said sealed proposals were opened and read on the 1 st day of May 2025 and it has been determined that Midwest Concrete, Inc. of Dubuque, IA submitted the low bid in the amount of $81,602.58, and is the lowest responsive, responsible bidder for the Project. NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: That a Public Improvement Contract for the Project is hereby awarded to Midwest Concrete, Inc. and the City Manager is hereby directed to execute a Public Improvement Contract on behalf of the City of Dubuque for the Project. Passed, adopted, and approved this 19th day of May 2025. PPAI 1"Pr 77AN /�F io-A rm,s- .. Attest: Adrienne N. Breitfelder, CMC City Clerk a OFB E Masterpiece on the Mississippi City of Dubuque, Iowa Bid Tabulation Project Title: 2025 CURB RAMP PROJECT ONE Bid Date Engineer's Estimate Midwest Concrete Inc. Drew Cook and SoWs Excavating Valentine Construction Company Eastern Iowa Excavating Tschiggfrie Excavating Co. PLAN UNIT LIN E ESTIMATED BID TOTAL PRICE BID BID ITEM DESCRIPTION TOTAL PRICE TOTAL PRICE TOTAL PRICE BID TOTAL PRICE BID TOTAL PRICE NO QUANTIITY UNIT PRICE UNIT PRICE UNIT PRICE UNIT PRICE UNIT PRICE UNIT PRICE Division 2010 - Earthwork, Subgrade, and Subbase 1 2010-108-D-3 Topsoil, Off -site 10 CY $ 81.00 $ 810.00 $ 75.00 $ 750.00 $ 60.00 $ 600.00 $ 50.00 $ 500.00 $ 117.00 $ 1,170.00 $ 60.00 $ 600.00 2 2010-108-J-0 Subbase, Granular Subbase - Gr 12a (Granular Subbase Pile) 135 TON $ 30.00 $ 4,050.00 $ 32.00 $ 4,320.00 $ 23.00 $ 3,105.00 $ 24.00 $ 3,240.00 $ 31.00 $ 4,185.00 $ 45.00 $ 6,075.00 Division 6010 - Structures for Sanitary and Storm Sewers 3 6010-108-E-1 Manhole Adjustment, Minor 1 EA $ 659.00 $ 659.00 $ 725.00 $ 725.00 $ 1,000.00 $ 1,000.00 $ 500.00 $ 500.00 $ 560.00 $ 560.00 $ 2,000.00 $ 2,000.00 Division 7010 - Portland Cement Concrete Pavement 4 7010-108-A-0 Pavement, PCC, 6" (Thickness) 51 SY $ 103.00 $ 5,253.00 $ 70.00 $ 3,570.00 $ 70.00 $ 3,570.00 $ 110.00 $ 5,610.00 $ 75.25 $ 3,837.75 $ 170.00 $ 8,670.00 5 7010-108-E-0 Curb and Gutter, 30" (width), 8" (Thickness) 250 LF $ 42.50 $ 10,625.00 $ 42.00 $ 10,500.00 $ 40.00 $ 10,000.00 $ 105.00 $ 26,250.00 $ 45.75 $ 11,437.50 $ 72.00 $ 18,000.00 Division 7030 - Sidewalks, Shared Use Paths, and Driveways 6 7030-108-A-1 Removal of Sidewalk 210 SY $ 28.00 $ 5,880.00 $ 21.00 $ 4,410.00 $ 30.00 $ 6,300.00 $ 20.00 $ 4,200.00 $ 45.00 $ 9,450.00 $ 22.00 $ 4,620.00 7 7030-108-E-0 PCC, Sidewalk, 4" (Thickness) 95 SY $ 80.00 $ 7,600.00 $ 70.00 $ 6,650.00 $ 70.00 $ 6,650.00 $ 70.00 $ 6,650.00 $ 86.00 $ 8,170.00 $ 100.00 $ 9,500.00 8 7030-108-E-0 PCC, Sidewalk, 6" (Thickness) 210 SY $ 90.00 $ 18,900.00 $ 85.00 $ 17,850.00 $ 80.00 $ 16,800.00 $ 75.00 $ 15,750.00 $ 71.50 $ 15,015.00 $ 110.00 $ 23,100.00 9 7030-108-G-0 Detectable warning 112.25 SF $ 53.50 $ 6,005.38 $ 55.00 $ 6,173.75 $ 40.00 $ 4,490.00 $ 40.00 $ 4,490.00 $ 48.50 $ 5,444.13 $ 100.00 $ 11,225.00 Division 7040 - Pavement Rehabilitation 10 7040-108-A-0 Full Depth Patches PCC, 8" (Thickness) 54.93 SY $ 112.00 $ 6,152.16 $ 110.00 $ 6,042.30 $ 100.00 $ 5,493.00 $ 100.00 $ 5,493.00 $ 117.75 $ 6,468.01 $ 280.00 $ 15,380.40 11 7040-108-H-0 Pavement -Removal 170.58 SY $ 45.00 $ 7,676.10 $ 21.50 $ 3,667.47 $ 30.00 $ 5,117.40 $ 19.00 $ 3,241.02 $ 65.00 $ 11,087.70 $ 30.00 $ 5,117.40 12 7040-108-1-0 Curb and Gutter - Removal 250 LF $ 20.00 $ 5,000.00 $ 15.00 $ 3,750.00 $ 15.00 $ 3,750.00 $ 15.00 $ 3,750.00 $ 27.75 $ 6,937.50 $ 12.00 $ 3,000.00 IDOT Division 2528 - Traffic Control 13 IDOT2528.04-A Traffic Control 1 LS $ 6,500.00 $ 6,500.00 $ 5,175.00 $ 5,175.00 $ 7,450.00 $ 7,450.00 $ 8,000.00 $ 8,000.00 $ 8,250.00 $ 8,250.00 $ 9,000.00 $ 9,000.00 IDOT Division 2524 - Traffic Signing 14 IDOT 2524.05-F Existing Sign, Remove 6 EA $ 100.00 $ 600.00 $ 100.00 $ 600.00 $ 175.00 $ 1,050.00 $ 100.00 $ 600.00 $ 75.00 $ 450.00 $ 100.00 $ 600.00 Division 9010 - Seeding 15 9010-108-B-0 Hydraulic- Seeding, Fertilizing, and Mulching, Type 1, by SF 738.1 SF $ 2.00 $ 1,476.20 $ 2.60 $ 1,919.06 $ 2.50 $ 1,845.25 $ 3.50 $ 2,583.35 $ 3.25 $ 2,398.83 $ 3.00 $ 2,214.30 Division 11,010 - Construction Survey 16 11010-108-B-0 Monument Preservation and Replacement 1 LS $ 1,200.00 $ 1,200.00 $ 500.00 $ 500.00 $ 250.00 $ 250.00 $ 500.00 $ 500.00 $ 2,650.00 $ 2,650.00 $ 1,800.00 $ 1,800.00 Division 11,020 - Mobilization 17 11020-108-A-0 Mobilization 1 LS $ 6,600.00 $ 6,600.00 $ 5,000.00 $ 5,000.00 $ 5,000.00 $ 5,000.00 $ 10,000.00 $ 10,000.00 $ 5,500.00 $ 5,500.00 $ 21,000.00 $ 21,000.00 Total Base Bid Amount $ 96,486.84 $ 81,602.58 $ 82,470.65 $ 101,357.37 $ 103,011.41 $ 141,902.10 Total Selected Alternate(s) Amount $ - $ - $ - $ - $ - $ - Total Bid Amount: $ 96,486.84 $ 81,602.58 $ 82,470.65 $ 101,357.37 $ 103,011.41 $ 141,902.10 Total Bid $ 81,602.58 Total Bid $ 82,470.65 Total Bid $ 101,357.37 Total Bid $ 103,011.41 Total Bid $ 141,902.10 % Over / Under (-) -15.43% -14.53% 5.05% 6.76% 47.07% Page 187 of 950