Loading...
Reject Bids 2025 Repair and Maintenance of the Iowa Street Parking GarageCity of Dubuque City Council ACTION ITEMS # 2. Copyrighted May 19, 2025 ITEM TITLE: Reject Bids 2025 Repair and Maintenance of the Iowa Street Parking Garage SUMMARY: City Manager recommending City Council reject the single bid proposal received for the 2025 Repair and Maintenance of the Iowa Street Parking Garage due to a lack of competitive bids and insufficient funding to proceed with the construction improvements as proposed. RESOLUTION Rejecting Competitive Bid Proposal Received For The 2025 Repair And Maintenance Of The Iowa Street Parking Garage SUGGUESTED Receive and File; Adopt Resolution(s) DISPOSITION: ATTACHMENTS: 1. MVM Memo 2. 2025 Repair and Maintenance of the Iowa St Parking Garage - Reject Bid Staff MEMO 3. 2025 Repair and Maintenance of the Iowa St Parking Garage - Reject Bid RESOLUTION Page 890 of 950 THE CITY OF Dubuque DuBE uFA�a9a av Masterpiece on the Mississippi rP PP zoo�•*o 13 2017202019 TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: 2025 Repair and Maintenance of the Iowa Street Parking Garage Rejection of Single Competitive Bid Proposal Project No. 4683000002 DATE: May 14, 2025 Director of Transportation Services Ryan Knuckey and Project Manager Jim Bousley are recommending City Council reject the single bid proposal received for the 2025 Repair and Maintenance of the Iowa Street Parking Garage due to a lack of competitive bids and insufficient funding to proceed with the construction improvements as proposed. It is also recommend that staff review the scope of the project; further evaluate the estimate of probable cost based on current construction cost market conditions; identify potential value engineering components so that the improvements can be modified or adjusted to meet the current available funding; evaluate the construction schedule to potentially allow contractors more time to complete the ramp repair work; and prepare to re -bid the project. I concur with the recommendation and respectfully request Mayor and City Council approval. Y Mic ael C. Van Milligen MCVM:sv Attachment cc: Crenna Brumwell, City Attorney Cori Burbach, Assistant City Manager Ryan Knuckey, Director of Transportation Services Gus Psihoyos, City Engineer Jim Bousley, Project Manager Robert Schiesl, Assistant City Engineer Russ Stecklein, Operations Supervisor Transportation Services Page 891 of 950 THE C DUUB%FE Masterpiece on the Mississippi TO: Michael C. Van Milligen, City Manager FROM: Ryan Knuckey, Director of Transportation Services Jim Bousley, Project Manager Dubuque All -America Cily I I® r 2007-2012.2013 2017*2019 SUBJECT: 2025 Repair and Maintenance of the Iowa Street Parking Garage Rejection of Single Competitive Bid Proposal Project No. 4683000002 DATE: May 14, 2025 INTRODUCTION The enclosed resolution authorizes the rejection of the single competitive bid proposal received for the 2025 Repair and Maintenance of the Iowa Street Parking Garage due to a lack of competitive bids and insufficient funding to proceed with the construction improvements as proposed. BACKGROUND In 2022 the City issued a Request for Proposals for a Parking Ramp Maintenance Needs Assessment. In November of 2022 the City Council approved the awarding of the contract to Desman, Inc. of Chicago, Illinois. The Iowa Street Ramp condition assessment report completed by Desman indicated several areas in the Iowa Street parking ramp that need repairs and maintenance work. A professional services contract was signed with Desman to provide design and construction administration services for structural repairs. The 2025 Repair and Maintenance of the Iowa Street Parking Garage would provide for slab -on -grade asphalt and concrete repairs, full depth pan joist slab repairs, partial depth concrete repairs on garage ramps, concrete curb island removal and replacement, form and pour joist repairs, form and pour beam repairs, column repairs, waterproofing repair and enhancements, new waterproofing membrane, stair tower repairs, installation of new supplemental floor drains on roof level, electrical upgrades including circuit conduit and feeders, lighting fixtures, plumbing upgrades including waste drains, piping, hose bibs, replacement of elevator pit pump and other miscellaneous work. PROJECT FUNDING The estimate of probable cost for the 2025 Repair and Maintenance of the Iowa Street Parking Garage is summarized as follows: Page 892 of 950 PROJECT COSTS ESTIMATE Construction Contract - Base Bid $ 4,011,300 Construction Contract - Alternate Bid 978,000 Contingency 523,000 Consultant Services Design - Desman 116,200 Consultant Services Construction - Desman 148,600 City Staff Services, Construction Administration & Inspection 70,000 Total Project Cost $ 5,847,100 The project funding summary is as follows: Project No. Fund Description Fund Amount Parking Ramp Maintenance (FY25) $ 5,213,362 4683000002 Parking Ramp Maintenance (FY26) 633,738 Total Project Funding $ 5,847,100 BID RESULTS Competitive sealed bids were received on the 2025 Repair and Maintenance of the Iowa Street Parking Garage on May 12, 2025. One (1) bid proposal was received, with a base bid of $5,606,000, which is 39.8% above the estimate of probable cost. The single bid received is significantly over the current funding available to complete the construction improvements as proposed. RECOMMENDATION I recommend that the City Council reject the single bid proposal received for the 2025 Repair and Maintenance of the Iowa Street Parking Garage due to a lack of competitive bids and insufficient funding to proceed with the construction improvements as proposed. I also recommend that staff review the scope of the project; further evaluate the estimate of probable cost based on current construction cost market conditions; identify potential value engineering components so that the improvements can be modified or adjusted to meet the current available funding; evaluate the construction schedule to potentially allow contractors more time to complete the ramp repair work; and prepare to re -bid the project. ACTION TO BE TAKEN I recommend that the City Council reject the single bid proposal received through the adoption of the enclosed resolution for the 2025 Repair and Maintenance of the Iowa Street Parking Garage. cc: Gus Psihoyos, City Engineer Robert Schiesl, Assistant City Engineer Russ Stecklein, Operations Supervisor Transportation Services F:\PROJECTS\Iowa Street Parking Ramp\2025 Repair and Maintenance of the Iowa Street Parking Garage\City Council\Reject Bids Page 893 of 950 Prepared by Kerry Bradley City of Dubuque Engineering 50 W. 13th St. Dubuque IA 52001 (563)589-4270 Return to Adrienne N. Breitfelder City Clerk City of Dubuque, 50 W. 13th St. Dubuque, IA 52001 (563)589-4100 RESOLUTION NO. 173-25 REJECTING COMPETITIVE BID PROPOSAL RECEIVED FOR THE 2025 REPAIR AND MAINTENANCE OF THE IOWA STREET PARKING GARAGE WHEREAS, one (1) competitive sealed bid proposal was received for the 2025 Repair and Maintenance of the Iowa Street Parking Garage (the Project) pursuant to Resolution No. 136-25 and Notice to Bidders published in the City of Dubuque, Iowa website and a contractor plan room service with statewide circulation on the 25th day of April, 2025; and WHEREAS, the one (1) competitive sealed bid proposal was opened and read on the 12th day of May 2025; and WHEREAS, the City Council has deemed it advisable to reject the one (1) competitive sealed bid proposal for the Project. NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: SECTION 1. The one (1) competitive sealed bid proposal for the 2025 Repair and Maintenance of the Iowa Street Parking Garage is hereby rejected. SECTION 2. The City Clerk is authorized and instructed to return the bid deposit of the unsuccessful bidders for the 2025 Repair and Maintenance of the Iowa Street Parking Garage. Passed, approved and adopted this 19th day of May 2025. Attest: Brad M. Cava�g , Mayor Adrienne N. Breitfelder, City Clerk