Locust Street Ramp Repairs Project - Acceptance of Public Improvement Construction ContractCity of Dubuque City Council CONSENT ITEMS # 8. Copyrighted June 16, 2025 ITEM TITLE: Locust Street Ramp Repairs Project - Acceptance of Public Improvement Construction Contract SUMMARY: City Manager recommending City Council adopt the resolution to accept the improvements and to authorize the payment of the final contract amount of $38,896.64 to Restoration & Renovation Services, LLC for the Locust Street Ramp Repairs Project. RESOLUTION Accepting The Locust Street Ramp Repairs Project And Authorizing The Payment To The Contractor SUGGUESTED Receive and File; Adopt Resolution(s) DISPOSITION: ATTACHMENTS: 1. MVM Memo 2. Locust Street Ramp Repairs Project - Staff Acceptance MEMO 3. Acceptance of Completion - Resolution 4. Acceptance of Completion Page 106 of 1053 THE CITY OF DUBE Masterpiece on the Mississippi TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: Locust Street Ramp Repairs Project Acceptance of Public Improvement Construction Contract Project Code: 4683000002 DATE: June 10, 2025 Dubuque AI WIN av 2007-2012.2013 2017*2019 City Engineer Gus Psihoyos is recommending City Council adopt the resolution to accept the improvements and to authorize the payment of the final contract amount of $38,896.64 to Restoration & Renovation Services, LLC for the Locust Street Ramp Repairs Project. I concur with the recommendation and respectfully request Mayor and City Council approval. v Mic ael C. Van Milligen MCVM:sv Attachment cc: Crenna Brumwell, City Attorney Cori Burbach, Assistant City Manager Gus Psihoyos, City Engineer Jim Bousley, Project Manager Jenny Larson, Chief Financial Officer Ryan Knuckey, Transportation Services Director Russ Stecklein, Transportation Services Parking Operations Supervisor Tracy Schadle, Confidential Account Clerk Page 107 of 1053 THE CITY OF DUB E Masterpiece on the Mississippi TO: Michael C. Van Milligen, City Manager FROM: Gus Psihoyos, City Engineer DATE: June 15, 2025 RE: Locust Street Ramp Repairs Project Acceptance of Public Improvement Construction Contract Project Code- 4683000002 INTRODUCTION Dubuque All -America City 2007-2012-2013 2017*2019 The enclosed resolution provides for the acceptance of the public improvement construction contract for the Locust Street Ramp Repairs Project. BACKGROUND The Fourth Amendment to the Development Agreement between the City of Dubuque and Roshek Property, LLC. requires the City to make pedestrian -related safety improvements to the Locust Street Parking Ramp. Transportation Services and Engineering Department personnel have collaborated on a ramp condition assessment evaluation of the non-structural components of the Locust St. Parking Ramp with project architect 563Design. A comprehensive list of improvements was created and prioritized. DISCUSSION The Locust Street Ramp Repairs project covers a scope of work to make safety and aesthetic improvements to the ramp's stairwells. Repairs addressed the improvements needed to all three of the existing stairwells and their adjacent landing/lobby areas. Specially, the stairwells were repainted to create a brighter interior walking space, degraded walk surfaces were repaired, and stairwell doors and other parts of the entrances will be either refurbished or replaced. This project included an alternate bid for an extended warranty on the painting component of the bid. Which was elected to accept in the amount of $4,000. The Locust Street Ramp Repairs Project was completed by Restoration & Renovation Services, LLC of Dubuque, Iowa in the final contract amount of $344,744.40 which is a 23.57% increase from the original contract amount of $278,980. The increase in the total contract amount is due to change orders that included additional work for; painting additional areas, removing and replacing existing cast iron stormwater pipe, masonry restoration, additional light fixtures, additional floor coating, replacing limestone pieces, additional curb repair, replacing conduit, removing and replacing two skylights, installing louvers, and installing two non -powered turbines. Page 108 of 1053 BUDGET IMPACT The project cost summary for the Locust Street Ramp Repairs Project is summarized below: Description Cost Estimate Award Final Locust Street Ramp Repairs Bid $ 250,000.00 $ 274,980.00 $278,980.00 Bid Alternate — Paint extended warranty $4,000.00 $4,000.00 Change Order 1 — Painting, plumbing, masonry $32,852.20 Change Order 2 - Electrical $32,912.20 Change Order 4 - Floor coating, curb patching $12,593.00 Change Order 5 — Ventilation Systems $20,319.20 Total Construction Cost $ 274,980.00 $ 278,980.00 $ 344,744.40 The project funding is summarized as follows: Project No Funding Source Amount 4683000002 Parking Ramp Major Maintenance Repairs $344,744.40 RECOMMENDATION The City Council is requested to adopt the attached resolution to accept the improvements and to authorize the payment of the final contract amount of $38,896.64 to Restoration & Renovation Services, LLC for the Locust Street Ramp Repairs Project. Prepared by: Tracy Schadle, Eng. Dept. cc: Jenny Larson, Chief Financial Officer Ryan Knuckey, Transportation Services Director Russ Stecklein, Parking Operations Supervisor Jim Bousley, Project Manager Tracy Schadle, Conf. Account Clerk 2 Page 109 of 1053 Prepared by Tracy Schadle City of Dubuque Engineering 50 W. 131h St, Dubuque IA 52001 (563)589-4270 Return to Adrienne N. Breitfelder City Clerk City of Dubuque, 50 W. 131h St. Dubuque, IA 52001 (563)589-4100 RESOLUTION NO. 207-25 ACCEPTING THE LOCUST STREET RAMP REPAIRS PROJECT AND AUTHORIZING THE PAYMENT TO THE CONTRACTOR WHEREAS, the public improvement contract for the Locust Street Ramp Repairs Project, (the Project) has been completed by the Contractor, Ostrom Painting and Sandblasting, Inc. (Contractor), the City Engineer has examined the work and recommends that the Project be accepted; and WHEREAS, the final contract amount for the Project is $344,744.40; and WHEREAS, the Contractor has previously been paid $305,847.94, leaving a balance of $38,896.64; and WHEREAS, the City Council finds that the recommendation of the City Engineer should be accepted. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: SECTION 1. The recommendation of the City Engineer is approved, and the Project is hereby accepted. SECTION 2. The Finance Director is hereby directed to pay to the Contractor the balance of the retainage of $38,896.64 as provided in Iowa Code chapter 573, and to pay such retainage in accordance with the provisions of Iowa Code chapter 573 or Iowa Code chapter 26.13. Passed, approved and adopted this 16th day of June 2025. Attest: Adrienne N. Breitfelder, City Clerk spiviW-Nagh, Mayor Prepared by Tracy Schadle City of Dubuque Engineering 50 W. 13" St. Dubuque IA 52001 (563)589-4270 Return to Adrienne N. Breitfelder City Clerk City of Dubuque, 50 W. 131" St. Dubuque, IA 52001 (563)589-4100 CITY ENGINEER'S CERTIFICATE OF FINAL COMPLETION OF LOCUST STREET RAMP REPAIRS PROJECT The undersigned City Engineer of the City of Dubuque, Iowa, hereby certifies that he has inspected the Locust Street Ramp Repairs Project has been performed in compliance with the terms of the Public Improvement Contract, and that the total cost of the completed work is $344,744.40. Dated this 16th day of June 2025. Gus Psihoyos, City Engi eer Filed in the office of the City Clerk on the 16th day of June 2025. a�'Izze /� ALAY�V'_ Adrienne N. Breitfelder, City Clerk