Iowa Department of Transportation PCC Pavement Grade Project NotificationCity of Dubuque
City Council
CONSENT ITEMS # 7.
Copyrighted
July 7, 2025
ITEM TITLE: Iowa Department of Transportation PCC Pavement Grade
Project Notification
SUMMARY: Correspondence from Jesse Tibodeau, Assistant District
Engineer with the Iowa Department of Transportation (IDOT)
notifying the City Council of PCC Payement grade on US-20
over the Middle Branch Catfish Creek and Chicago, Central
and Pacific Railroad.
SUGGUESTED Receive and File
DISPOSITION:
ATTACHMENTS:
1. Correspondence
Page 304 of 678
IOWA
KIM REYNOLDS, GOVERNOR
July 2, 2025
Dear City Council:
DOT
SCOTT MARLER, IOWA DOT DIRECTOR
IOWA DEPARTMENT OF TRANSPORTATION
DIVISION/BUREAU
5455 Kirkwood Blvd. SW
Cedar Rapids, IA 52404
319-364-0235
www.lowadot.gov
Ref: BRFN-020-9(288)--39-31
This is official notification to your City Council that the Iowa Department of Transportation (DOT) proposes to let the
project as referenced above on July 15, 2025. This project, or a portion thereof, lies within your city. The project is
proposed for construction during 2025 and will consist of PCC pavement grade and new on US-20 over the Middle
Branch Catfish Creek and Chicago, Central and Pacific Railroad. This is detour pavement in anticipation of the upcoming
bridge replacement.
The work will be done in accord with the current Form 810034 "Agreement for Primary Road Extension Maintenance
and Operation". Project costs will be paid from the Primary Road Fund and no charges will be made against the city.
The contract will be administered by the Manchester Resident Construction Engineer's Office. If the City would like to be
notified of the preconstruction meeting schedule, contractor's proposed work schedule, or has any other questions
and/or concerns, please contact Hugh Holak, P.E., Resident Construction Engineer of the Manchester RCE Office by
calling 563-927-2397, or by email at hugh.holak@iowadot.us
We would appreciate this project notification being included on your next City Council meeting agenda as a matter of
information for the Council members. If you have any questions concerning the work involved, please contact this office
as soon as possible to expedite any possible changes.
Sincerely yours,
�11 I �r 0 1
Jesse Tibodeau, P.E.
Assistant District Engineer
JLT:JWP
To: Adrienne Breitfelder, City Clerk, City of Dubuque
Cc: Jim Schnoebelen, P.E., Iowa DOT District Engineer, District 6
Jesse Tibodeau, P.E., Iowa DOT Assistant District Engineer, District 6
Danielle Alvarez, P.E., Iowa DOT District Construction Engineer, District 6
Hugh Holak P.E., Manchester Resident Construction Engineer, Manchester RCE Office
Brian Stelken, Iowa DOT Engineering Tech Senior, Manchester RCE Office
Diane Recker, Iowa DOT Engineering Office Assistant, Manchester RCE Office
Seth Kjormoe P.E., Iowa DOT Area Engineer, District 6 Office
Page 305 of 678