2025 Maintenance Dredging Project Public HearingCity of Dubuque
City Council
PUBLIC HEARINGS # 5.
Copyrighted
July 21, 2025
ITEM TITLE: 2025 Maintenance Dredging Project Public Hearing
SUMMARY: Proof of publication on notice of public hearing to consider
City Council approve the plans, specifications, form of
contract, and estimated cost of $270,100.00 for the 2025
Maintenance Dredging Project through adoption of the
attached resolution, and City Manager recommending
approval.
RESOLUTION Approval Of Plans, Specifications, Form Of
Contract, And Estimated Cost For The 2025 Maintenance
Dredging Project
SUGGUESTED Receive and File; Adopt Resolution(s)
DISPOSITION:
ATTACHMENTS:
1. MVM Memo
2. 2025 Maintenance Dredging Project - Council Staff PH MEMO
3. 2025 Maintenance Dredging Project - Council PH RESOLUTION
4. Proof of Publication
Page 708 of 720
THE CITY OF
DUB E-E
Masterpiece on the Mississippi
TO: The Honorable Mayor and City Council Members
FROM: Michael C. Van Milligen, City Manager
Dubuque
All -America Ciq
IIIr
II
2007.2012.2013
2017*2019
SUBJECT: 2025 Maintenance Dredging Project
Public Hearing
Project Number: 5546000001-304-67990 - Harbor Area Dredging
DATE: July 15, 2025
Assistant City Engineer Robert Schiesl is recommending City Council approve the
plans, specifications, form of contract, and estimated cost of $270,100.00 for the 2025
Maintenance Dredging Project through adoption of the attached resolution.
On September 5th, 2023, the City Council authorized, and staff submitted a Boating
Infrastructure Grant (BIG Tier 1) application to the US Fish and Wildlife Service and
Iowa Department of Natural Resources for dredging the marina to provide transient
boaters, and boaters who operate vessels 26 feet or larger, access to docking and safe
harbor facilities, including fueling, pump -out, bathroom and shower facilities, access to
clean water, electricity, and other utilities.
In July 2024, the City received the Notice of Award from the US Fish and Wildlife
Service and Iowa Department of Natural Resources for the Boating Infrastructure Tier 1
Grant, and the City Council authorized the execution of the grant agreement.
On July 7t", 2025, the City Council authorized the execution of a funding agreement
between the City and Dubuque Marina, Inc. for the partnership agreement for Dubuque
Marina to provide the required local match funding ($100,000) for the grant to perform
maintenance dredging at Dubuque Marina
The dredging project will provide adequate depth and an improved open waterway for
safely navigating transient vessels. By dredging and creating the open waterway from
the Peosta Channel to the marina transient docks, this will create improved water flow
and water circulation which will reduce the potential for future sediment siltation within
the proposed dredge location. The proposed dredged open waterway will be more
sustainable long-term and will maximize the return on the investment of federal grant
funding with a long-term solution in providing safe harbor access for daily and overnight
transient boaters.
Page 709 of 720
I concur with the recommendation and respectfully request Mayor and City Council
approval.
Mic ael C. Van Milligen
MCVM:sv
Attachment
cc: Crenna Brumwell, City Attorney
Cori Burbach, Assistant City Manager
Gus Psihoyos, City Engineer
Robert Schiesl, Assistant City Engineer
Jenny Larson, Chief Financial Officer
Nathan Steffen, Civil Engineer
2
Page 710 of 720
THE C
DUUB*FE
Masterpiece on the Mississippi
TO: Michael C. Van Milligen, City Manager
FROM: Robert Schiesl, Assistant City Engineer
DATE: July 16, 2025
Dubuque
III -America City
2007-2012.2013
2017*2019
RE: 2025 Maintenance Dredging Project
Public Hearing
Project Number: 5546000001-304-67990 - Harbor Area Dredging
INTRODUCTION
The attached resolution is in reference to the public hearing for the 2025 Maintenance
Dredging Project.
BACKGROUND
The Sportfishing and Boating Safety Act - BIG Tier 1 grant funding supports boating as
a popular recreational activity; there are approximately 11.8 million registered
recreational boats in the United States. Of this total, an estimated 584,000 are at least
26 feet long. The Sportfishing and Boating Safety Act of 1998 (Public Law 105-178)
established the Boating Infrastructure Grants (BIG) Program (16 U.S.C. 777g-1) to
provide funding to the 50 States, for the construction, renovation, and maintenance of
boating infrastructure facilities for transient recreational vessels at least 26 feet long that
are operated, leased, rented, or chartered primarily for pleasure.
On September 5th, 2023, the City Council authorized, and staff submitted a Boating
Infrastructure Grant (BIG Tier 1) application to the US Fish and Wildlife Service and
Iowa Department of Natural Resources for dredging the marina to provide transient
boaters, and boaters who operate vessels 26 feet or larger, access to docking and safe
harbor facilities, including fueling, pump -out, bathroom and shower facilities, access to
clean water, electricity, and other utilities.
In July 2024, the City received the Notice of Award from the Iowa DNR / USFWS for the
BIG Tier 1 Grant, and per Resolution 307-24, the City Council authorized the execution
of the BIG Tier 1 Subrecipient Grant Agreement.
DUBUQUE MARINA FUNDING AGREEMENT
On July 7th, 2025, per Resolution 242-25, the City Council authorized the execution of a
Funding Agreement between the City and Dubuque Marina, Inc. for the partnership
agreement to provide the required local match funding ($100,000) for the 2024 BIG Tier
1 Grant to perform maintenance dredging at Dubuque Marina
Page 711 of 720
BIG TIER 1 GRANTS - DREDGING PLAN
The objective and scope of work for the 2025 Maintenance Dredging Project, utilizing
the 2024 BIG TIER 1 Grant funding that was awarded is to perform maintenance
dredging within the approximate area shown in Figure 1, to an approximate river bottom
elevation of 586.5-Ft., which will provide adequate depth for transient boats 26 feet in
length or greater and will create a safe open water for navigating vessels from the
Peosta Channel to and from the existing transient dock for fuel, water, and holding tank
pump -out.
LEGEND
At 7- Rirar Stage
Above Water
O -, Oeep
51
2022 BIG GRANT
DREDGE AREA
2024 BIG GRANT ��- S A
DREDU1E AREA
Figure 1 - Dubuque Marina Area to be Dredged
s"
0
11
&a
2024 Maintenance Dredging
Project No. 1
2022 BIG Tier 1 Grant
Funding was used to perform
dredging within the area
outlined in RED, this project
was complete in 2024.
2025 Maintenance Dredging
Project
2024 BIG Tier 1 Grant
Funding to be used to perform
dredging within the area
outlined in GREEN.
The dredging project will provide adequate depth and an improved open waterway for
safely navigating transient vessels. By dredging and creating the open waterway from
the Peosta Channel to the marina transient docks, this will create improved water flow
and water circulation which will reduce the potential for future sediment siltation within
the proposed dredge location. The proposed dredged open waterway will be more
sustainable long-term and will maximize the return on the investment of federal BIG
funding with a long-term solution in providing safe harbor access for daily and overnight
transient boaters.
2
Page 712 of 720
PROJECT SCHEDULE
The schedule for the project will be as follows:
Initiate Bidding
Publish Notice to Bidders, Advertisement for Bids
Publish Notice of Hearing on Plans & Specifications
Public Hearing
Receipt of Bids
Award of Contract
Completion Date
July 7, 2025
April 5, 2024
April 5, 2024
July 21, 2025
July 24, 2025
August 4, 2025
November 10, 2025
BUDGETIMPACT
The estimate of probable cost for the 2025 Maintenance Dredging Project is
summarized in the following table:
Description
Cost Estimate
Dredge Construction - Dubuque Marina
$ 202,700.00
Alternate 1 — Remove and Replace Dock Spuds
18,000.00
Alternate 2 — Lift Well Dredging
14,400.00
Contingency (Over Dredge Depth)
35,000.00
Total Construction Cost Estimate
$ 270,100.00
The proposed project funding is summarized as follows:
Project Number
Fund Description
Fund Amount
5546000001-304-67990
Harbor Area Dredging (BIG TIER 1 Grant)
$ 170,100.00
Private Participation - Dubuque Marina
100,000.0
Total Project Funding
$ 270,100.00
REQUESTED ACTION
The City Council is requested to approve the plans, specifications, form of contract and
estimated cost for the for the 2025 Maintenance Dredging Project through adoption of
the attached resolution.
cc: Gus Psihoyos, City Engineer
Jenny Larson, Chief Financial Officer
Nathan Steffen, Civil Engineer
Dubuque Marina
FAPROJECTS\DREDGING PROJECTS\2025 Maintenance Dredge\Council & Staff Documents\
3
Page 713 of 720
Prepared by Robert Schiesl City of Dubuque Engineering 50 W. 13th St. Dubuque IA 52001 (563)589-4270
Return to Adrienne N. Breitfelder City Clerk City of Dubuque, 50 W. 13th St. Dubuque, IA 52001 (563)589-4100
RESOLUTION NO. 250-25
APPROVAL OF PLANS, SPECIFICATIONS, FORM OF CONTRACT, AND
ESTIMATED COST FOR THE 2025 MAINTENANCE DREDGING PROJECT
NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF
DUBUQUE, IOWA:
That the attached plans, specifications, form of contract and estimate of total cost
for the 2025 Maintenance Dredging Project in the estimated amount $270,100.00, are
hereby approved.
Passed, approved, and adopted this 21 st day of July 2025.
Attest:
Adrienne Breitfelder, G{MC City Clerk
ijam/
1'
.�.►.•Mayor
STATE OF IOWA SS:
DUBUQUE COUNTY
CERTIFICATE OF PUBLICATION
I, Kathy Goetzinger, a Billing Clerk for Woodward
Communications, Inc., an Iowa corporation, publisher
of the Telegraph Herald, a newspaper of general
circulation published in the City of Dubuque, County
of Dubuque and State of Iowa; hereby certify that the
attached notice was published in said newspaper on the
following dates:
07/11/2025
and for which the charge is 37.96
Su scribed to fore 4 a Notary Public in and for
Dubuque County, Iowa,
this 11 th day of July, 2025
Notary P bl c in and for Dubuque County, Iowa.
�`P%nt s1 JANET K. PAPE
0 9 commission Number 199659
Z My commission Expires
12/11/2025
Page 715 of 720
Ad text
CITY OF DUBUQUE, IOWA
OFFICIAL NOTICE
PUBLIC NOTICE: is hereby given that the Dubuque City Council
will conduct a public hearing on the 21 st day of July, 2025 at
6:30 p.m., in the Historic Federal Building, 350 W. 6th
Street, 2nd floor, Dubuque, Iowa, at which meeting the City
Council proposes to hold a public hearing on the proposed
plans, specifications, form of contract and estimated cost for
the 2025 Maintenance Dredging Project.
The scope of the Project is as follows: Perform maintenance
dredging at Dubuque Marina. The dredge material (approx. 5,000
CY) will be mechanically removed, loaded onto a material
barge, and transported to a contractor provided, permitted
disposal location. The dredge spoil material will be offloaded
from the material barge to the approved disposal site.
At the meeting, the City Council will receive oral and
written comments from any resident or property owner of said
City to the above action. The official City Council agenda
will be posted the Friday before the meeting and will contain
public input options. The agenda can be accessed at
https://dubuqueia.portal.civicclerk.com/ or by contacting the
City Clerk's Office at 563-589-4100,
ctyclerk@cityofdubuque.org.
Written comments on the public hearing may be submitted to
the City Clerk's Office by email at ctyclerk@cityofdubuque.org
or by mail to City Hall, 50 W. 13th St., Dubuque, 1A 52001,
before the scheduled hearing. The City Council will review all
written comments at the time of the hearing.
Documents related to the public hearing are on file in the
City Clerk's Office and may be viewed Monday through Friday
between 8:00 a.m. and 5:00 p.m.
Individuals requiring special assistance should contact the
City Clerk's Office as soon as feasible. Deaf or
hard -of -hearing individuals can use Relay Iowa by dialing 711
or (800) 735-2942.
Published by order of the City Council given on the 7th day
of July 2025.
Adrienne N. Breitfelder, CMC, City Clerk
It 7/11