ITEM TITLE: Broadway Sanitary Sewer Improvements Project Acceptance
SUMMARY: City Manager recommending City Council accept the
improvements and authorize the payment of the final contract
to Tschiggfrie Excavating for the Broadway Sanitary
Improvements Project
RESOLUTION Accepting the Broadway Sanitary
Improvements Project and Authorizing Final Payment to the
Contractor
SUGGUESTED Receive and File; Adopt Resolution(s)
DISPOSITION:
ATTACHMENTS:
1. MVM Memo
2. BroadwaySan-Council Accept Memo
3. 2 Acceptance Resolution Broadway Sanitary Improvements Project
4. 3 Engineer's Certificate of Completion
Page 1001 of 1311
THE CITY OF
DUBE
Masterpiece on the Mississippi
TO: The Honorable Mayor and City Council Members
FROM: Michael C. Van Milligen, City Manager
SUBJECT: Broadway Sanitary Sewer Improvements Project
Acceptance of Public Improvement
Project No. 5581500046
DATE: July 29, 2025
Dubuque
AI WIN av
2007-2012.2013
2017*2019
City Engineer Gus Psihoyos is recommending City Council accept the improvements
and authorize the payment of the final contract amount of $214,911.34 to Tschiggfrie
Excavating for the Broadway Sanitary Improvements Project.
I concur with the recommendation and respectfully request Mayor and City Council
approval.
v
Mic ael C. Van Milligen
MCVM:sv
Attachment
cc: Crenna Brumwell, City Attorney
Cori Burbach, Assistant City Manager
Gus Psihoyos, City Engineer
Max O'Brien, Civil Engineer
Jenny Larson, Chief Financial Officer
Laura Bendorf, Budget Manager
Page 1002 of 1311
THE C
DUUB*TE
Masterpiece on the Mississippi
TO: Michael C. Van Milligen, City Manager
FROM: Gus Psihoyos, City Engineer
SUBJECT: Broadway Sanitary Sewer Improvements Project
Acceptance of Public Improvement
Project No. 5581500046
DATE: July 28, 2025
Dubuque
All -America City
2007-2012.2013
2017*2019
INTRODUCTION
The enclosed resolution provides for the acceptance of the construction contract for the
Broadway Sanitary Improvements Project.
BACKGROUND
This project provided for the installation of approximately 300 feet of 8-inch diameter
sewer along Broadway Street, from Putnam Street to W. 28th Street. On multiple
occasions, the existing sewer system has surcharged so that wastewater has back
flowed into basements. The sewer is proposed to be redirected so that flows are
conveyed with a greater capacity to mitigate the recurring backups. During design, staff
identified several deficiencies with the roadway, sidewalk, curb and gutter, which will
also be addressed within the project limits.
DISCUSSION
Broadway Sanitary Improvements Project was completed by Tschiggfrie Excavating in
the final contract amount of $214,911.34. A 19.41 % decrease to the original contract
amount of $266,668.30 which was due to reduction to quantities of materials under the
contract unit prices needed to complete the project through coordination of work with
Engineering and Public Works staff.
RECOMMENDATION
I recommend that the City Council accept the improvements and authorize the payment
of the final contract amount of $214,911.34 to Tschiggfrie Excavating for the Broadway
Sanitary Improvements Project.
Page 1003 of 1311
BUDGET IMPACT
The summary of project costs for the Broadway Sanitary Improvements Project is as
follows:
Description
Cost Estimate
Award
Final
Construction
$ 318,706.00
$ 266,668.30
$ 214,911.34
Contingency
$ 35,057.66
$ 35,057.66
$ 0.00
Engineering
$ 32.236.70
$ 32,236.70
$ 32,236.70
Total Project Cost
$ 386,000.36
$ 333,962.66
$ 247,148.04
The project funding (for construction costs) is summarized below:
Broadway Sanitary Sewer Improvements Project
Final Construction Funding Costs
5581500046
Broadway Sanitary Sewer Improvements
$ 80,336.86
5581500017
General Sanitary Sewer Repairs *
$ 65,740.55
5521000012
General Street Construction Repairs
$ 29,091.47
5521000002
General Sidewalks Curb/Catch Basin
Replacements
$ 39,742.45
Total Project Funding
$ 214,911.34
*Note: Value includes project contingency.
REQUESTED ACTION
The City Council is requested to adopt the attached resolution accepting the public
improvements and to authorize the payment of the final contract amount of $214,911.34
to Tschiggfrie Excavating, for the Broadway Sanitary Improvements Project.
Prepared by Max O'Brien
cc: Jenny Larson, Chief Financial Officer
Laura Bendorf, Budget Manager
2
Page 1004 of 1311
Prepared by Kerry Bradley Citv of Dubuque Engineering 50 W. 13" St. Dubuque IA 52001 (563)589-4270
Return to Adrienne N. Breitfelder City Clerk City of Dubuque, 50 W. 131h St. Dubuque, IA 52001 (563)589-4100
RESOLUTION NO. 259-25
ACCEPTING THE BROADWAY SANITARY IMPROVEMENTS PROJECT AND
AUTHORIZING FINAL PAYMENT TO THE CONTRACTOR
WHEREAS, the Public Improvement Contract for the Broadway Sanitary
Improvements Project (the Project) has been completed by the contractor, Tschiggfrie
Excavating (Contractor), and the City Engineer has examined the work and recommends
that the Project be accepted; and
WHEREAS, the final contract amount for the Project is $214,911.34; and
WHEREAS, the Contractor has previously been paid $205,578.70, leaving a
balance of $9,332.64; and
WHEREAS, the City Council finds that the recommendation of the City Engineer
should be accepted.
NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF
DUBUQUE, IOWA:
Section 1. The recommendation of the City Engineer is approved and the
Project is hereby accepted.
Section 2. The Director of Finance and Budget is hereby directed to pay the
balance of the retainage of $9,332.64 as provided in Iowa Code chapter 573, and to pay
such retainage in accordance with the provisions of Iowa Code chapter 573 or Iowa
chapter 26.13.
Passed, approved and adopted this 4t' day of August 2025.
Attest:
Adrienne N. Breitfelder, CMC City Clerk
peol
/
•�—agh,Mayor
CITY ENGINEER'S CERTIFICATE OF FINAL COMPLETION OF THE BROADWAY
SANITARY IMPROVEMENTS PROJECT
The undersigned City Engineer of the City of Dubuque, Iowa, hereby certifies that
he has inspected the Broadway Sanitary Improvements Project and work has been
performed in compliance with the terms of the Public Improvement Contract, and that the
total cost of the completed work is $247,148.04.
Dated this 28t" day of July 2025.
Gus Psihoyos, City Engineer
Filed in the office of the City Clerk on the 41" day of Au ust 2025.
i �I I i
Pop
It
Adrienne N. Breitfelder, CMC City Clerk