Broadway Sanitary Sewer Improvements Project AcceptanceCity of Dubuque City Council CONSENT ITEMS # 11. Copyrighted August 4, 2025 ITEM TITLE: Broadway Sanitary Sewer Improvements Project Acceptance SUMMARY: City Manager recommending City Council accept the improvements and authorize the payment of the final contract to Tschiggfrie Excavating for the Broadway Sanitary Improvements Project RESOLUTION Accepting the Broadway Sanitary Improvements Project and Authorizing Final Payment to the Contractor SUGGUESTED Receive and File; Adopt Resolution(s) DISPOSITION: ATTACHMENTS: 1. MVM Memo 2. BroadwaySan-Council Accept Memo 3. 2 Acceptance Resolution Broadway Sanitary Improvements Project 4. 3 Engineer's Certificate of Completion Page 1001 of 1311 THE CITY OF DUBE Masterpiece on the Mississippi TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: Broadway Sanitary Sewer Improvements Project Acceptance of Public Improvement Project No. 5581500046 DATE: July 29, 2025 Dubuque AI WIN av 2007-2012.2013 2017*2019 City Engineer Gus Psihoyos is recommending City Council accept the improvements and authorize the payment of the final contract amount of $214,911.34 to Tschiggfrie Excavating for the Broadway Sanitary Improvements Project. I concur with the recommendation and respectfully request Mayor and City Council approval. v Mic ael C. Van Milligen MCVM:sv Attachment cc: Crenna Brumwell, City Attorney Cori Burbach, Assistant City Manager Gus Psihoyos, City Engineer Max O'Brien, Civil Engineer Jenny Larson, Chief Financial Officer Laura Bendorf, Budget Manager Page 1002 of 1311 THE C DUUB*TE Masterpiece on the Mississippi TO: Michael C. Van Milligen, City Manager FROM: Gus Psihoyos, City Engineer SUBJECT: Broadway Sanitary Sewer Improvements Project Acceptance of Public Improvement Project No. 5581500046 DATE: July 28, 2025 Dubuque All -America City 2007-2012.2013 2017*2019 INTRODUCTION The enclosed resolution provides for the acceptance of the construction contract for the Broadway Sanitary Improvements Project. BACKGROUND This project provided for the installation of approximately 300 feet of 8-inch diameter sewer along Broadway Street, from Putnam Street to W. 28th Street. On multiple occasions, the existing sewer system has surcharged so that wastewater has back flowed into basements. The sewer is proposed to be redirected so that flows are conveyed with a greater capacity to mitigate the recurring backups. During design, staff identified several deficiencies with the roadway, sidewalk, curb and gutter, which will also be addressed within the project limits. DISCUSSION Broadway Sanitary Improvements Project was completed by Tschiggfrie Excavating in the final contract amount of $214,911.34. A 19.41 % decrease to the original contract amount of $266,668.30 which was due to reduction to quantities of materials under the contract unit prices needed to complete the project through coordination of work with Engineering and Public Works staff. RECOMMENDATION I recommend that the City Council accept the improvements and authorize the payment of the final contract amount of $214,911.34 to Tschiggfrie Excavating for the Broadway Sanitary Improvements Project. Page 1003 of 1311 BUDGET IMPACT The summary of project costs for the Broadway Sanitary Improvements Project is as follows: Description Cost Estimate Award Final Construction $ 318,706.00 $ 266,668.30 $ 214,911.34 Contingency $ 35,057.66 $ 35,057.66 $ 0.00 Engineering $ 32.236.70 $ 32,236.70 $ 32,236.70 Total Project Cost $ 386,000.36 $ 333,962.66 $ 247,148.04 The project funding (for construction costs) is summarized below: Broadway Sanitary Sewer Improvements Project Final Construction Funding Costs 5581500046 Broadway Sanitary Sewer Improvements $ 80,336.86 5581500017 General Sanitary Sewer Repairs * $ 65,740.55 5521000012 General Street Construction Repairs $ 29,091.47 5521000002 General Sidewalks Curb/Catch Basin Replacements $ 39,742.45 Total Project Funding $ 214,911.34 *Note: Value includes project contingency. REQUESTED ACTION The City Council is requested to adopt the attached resolution accepting the public improvements and to authorize the payment of the final contract amount of $214,911.34 to Tschiggfrie Excavating, for the Broadway Sanitary Improvements Project. Prepared by Max O'Brien cc: Jenny Larson, Chief Financial Officer Laura Bendorf, Budget Manager 2 Page 1004 of 1311 Prepared by Kerry Bradley Citv of Dubuque Engineering 50 W. 13" St. Dubuque IA 52001 (563)589-4270 Return to Adrienne N. Breitfelder City Clerk City of Dubuque, 50 W. 131h St. Dubuque, IA 52001 (563)589-4100 RESOLUTION NO. 259-25 ACCEPTING THE BROADWAY SANITARY IMPROVEMENTS PROJECT AND AUTHORIZING FINAL PAYMENT TO THE CONTRACTOR WHEREAS, the Public Improvement Contract for the Broadway Sanitary Improvements Project (the Project) has been completed by the contractor, Tschiggfrie Excavating (Contractor), and the City Engineer has examined the work and recommends that the Project be accepted; and WHEREAS, the final contract amount for the Project is $214,911.34; and WHEREAS, the Contractor has previously been paid $205,578.70, leaving a balance of $9,332.64; and WHEREAS, the City Council finds that the recommendation of the City Engineer should be accepted. NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: Section 1. The recommendation of the City Engineer is approved and the Project is hereby accepted. Section 2. The Director of Finance and Budget is hereby directed to pay the balance of the retainage of $9,332.64 as provided in Iowa Code chapter 573, and to pay such retainage in accordance with the provisions of Iowa Code chapter 573 or Iowa chapter 26.13. Passed, approved and adopted this 4t' day of August 2025. Attest: Adrienne N. Breitfelder, CMC City Clerk peol / •�—agh,Mayor CITY ENGINEER'S CERTIFICATE OF FINAL COMPLETION OF THE BROADWAY SANITARY IMPROVEMENTS PROJECT The undersigned City Engineer of the City of Dubuque, Iowa, hereby certifies that he has inspected the Broadway Sanitary Improvements Project and work has been performed in compliance with the terms of the Public Improvement Contract, and that the total cost of the completed work is $247,148.04. Dated this 28t" day of July 2025. Gus Psihoyos, City Engineer Filed in the office of the City Clerk on the 41" day of Au ust 2025. i �I I i Pop It Adrienne N. Breitfelder, CMC City Clerk Page 1006 of 1311