Loading...
2025 Maintenance Dredging Project - Award Public Improvement ContractCity of Dubuque City Council CONSENT ITEMS # 12. Copyrighted August 4, 2025 ITEM TITLE: 2025 Maintenance Dredging Project - Award Public Improvement Contract SUMMARY: City Manager recommending City Council award the Public Improvement Construction Contract for the 2025 Maintenance Dredging Project to Newt Marine Service in the base bid amount of $211,455.50 and concurrence in selecting both Alternate No. 1 and Alternate No. 2 in the amount of $26,930.00 for a total contract award of $238,385.50, through adoption of the attached resolution, subject to the concurrence of the Iowa Department of Natural Resources (DNR) and United States Fish and Wildlife Service (USFWS). RESOLUTION Awarding Public Improvement Construction Contract for the 2025 Maintenance Dredging Project SUGGUESTED Receive and File; Adopt Resolution(s) DISPOSITION: ATTACHMENTS: 1. MVM Memo 2. 2025 Maintenance Dredging Project - Council Staff Award MEMO 3. 2025 Maintenance Dredging Project - Council Award RESOLUTION 4. 2025 Maintenance Dredging Project - Bid Tabulation Page 1007 of 1311 Dubuque THE C D!Uj-!B AII-America Ciq 11111.1 II Masterpiece on the Mississippi YP PP zoo�•*o 13 2017202019 TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: 2025 Maintenance Dredging Project Award Public Improvement Contract Project Number: 5546000001-304-67990 - Harbor Area Dredging DATE: July 29, 2025 Assistant City Engineer Robert Schiesl is recommending City Council award the Public Improvement Construction Contract for the 2025 Maintenance Dredging Project to Newt Marine Service in the base bid amount of $211,455.50 and concurrence in selecting both Alternate No. 1 and Alternate No. 2 in the amount of $26,930.00 for a total contract award of $238,385.50, through adoption of the attached resolution, subject to the concurrence of the Iowa DNR and USFWS. On September 5th, 2023, the City Council authorized, and staff submitted a Boating Infrastructure Grant (BIG Tier 1) application to the US Fish and Wildlife Service and Iowa Department of Natural Resources for dredging the marina to provide transient boaters, and boaters who operate vessels 26 feet or larger, access to docking and safe harbor facilities, including fueling, pump -out, bathroom and shower facilities, access to clean water, electricity, and other utilities. In July 2024, the City received the Notice of Award from the US Fish and Wildlife Service and Iowa Department of Natural Resources for the Boating Infrastructure Tier 1 Grant, and the City Council authorized the execution of the grant agreement. On July 7t", 2025, the City Council authorized the execution of a funding agreement between the City and Dubuque Marina, Inc. for the partnership agreement for Dubuque Marina to provide the required local match funding ($100,000) for the grant to perform maintenance dredging at Dubuque Marina The dredging project will provide adequate depth and an improved open waterway for safely navigating transient vessels. By dredging and creating the open waterway from the Peosta Channel to the marina transient docks, this will create improved water flow and water circulation which will reduce the potential for future sediment siltation within the proposed dredge location. The proposed dredged open waterway will be more sustainable long-term and will maximize the return on the investment of federal grant funding with a long-term solution in providing safe harbor access for daily and overnight transient boaters. Page 1008 of 1311 I concur with the recommendation and respectfully request Mayor and City Council approval. Mic ael C. Van Milligen MCVM:sv Attachment cc: Crenna Brumwell, City Attorney Cori Burbach, Assistant City Manager Gus Psihoyos, City Engineer Robert Schiesl, Assistant City Engineer Jenny Larson, Chief Financial Officer Nathan Steffen, Civil Engineer 2 Page 1009 of 1311 THE C Dubuque DUUB-'*--TE AII•America City 11 N�1,.1 Masterpiece on the Mississippi � pp zoo�•o 13 Zoi7*20*zoi9 TO: Michael C. Van Milligen, City Manager Gus Psihoyos, City Engineer FROM: Robert Schiesl, Assistant City Engineer DATE: July 30, 2025 RE: 2025 Maintenance Dredging Project Award Public Improvement Contract Project Number: 5546000001-304-67990 - Harbor Area Dredging INTRODUCTION The purpose of this memorandum is to provide the City Council with information related to the recommendation for awarding the Public Improvement Construction Contract for the 2025 Maintenance Dredging Project. BACKGROUND The Sportfishing and Boating Safety Act - BIG Tier 1 grant funding supports boating as a popular recreational activity; there are approximately 11.8 million registered recreational boats in the United States. Of this total, an estimated 584,000 are at least 26 feet long. The Sportfishing and Boating Safety Act of 1998 (Public Law 105-178) established the Boating Infrastructure Grants (BIG) Program (16 U.S.C. 777g-1) to provide funding to the 50 States, for the construction, renovation, and maintenance of boating infrastructure facilities for transient recreational vessels at least 26 feet long that are operated, leased, rented, or chartered primarily for pleasure. On September 5th, 2023, the City Council authorized, and staff submitted a Boating Infrastructure Grant (BIG Tier 1) application to the US Fish and Wildlife Service and Iowa Department of Natural Resources for dredging the marina to provide transient boaters, and boaters who operate vessels 26 feet or larger, access to docking and safe harbor facilities, including fueling, pump -out, bathroom and shower facilities, access to clean water, electricity, and other utilities. In July 2024, the City received the Notice of Award from the Iowa DNR / USFWS for the BIG Tier 1 Grant, and per Resolution 307-24, the City Council authorized the execution of the BIG Tier 1 Subrecipient Grant Agreement. DUBUQUE MARINA FUNDING AGREEMENT On July 7t", 2025, per Resolution 242-25, the City Council authorized the execution of a Funding Agreement between the City and Dubuque Marina, Inc. for the partnership agreement to provide the required local match funding ($100,000) for the 2024 BIG Tier 1 Grant to perform maintenance dredging at Dubuque Marina Page 1010 of 1311 BIG TIER 1 GRANTS - DREDGING PLAN The objective and scope of work for the 2025 Maintenance Dredging Project, utilizing the 2024 BIG TIER 1 Grant funding that was awarded is to perform maintenance dredging within the approximate area shown in Figure 1, to an approximate river bottom elevation of 586.5-Ft., which will provide adequate depth for transient boats 26 feet in length or greater and will create a safe open water for navigating vessels from the Peosta Channel to and from the existing transient dock for fuel, water, and holding tank pump -out. LEGEND Al 7.00 R-1 s<aye ALI— O' - V Deep ' I' Y--3' Deep IL b V 2022 BIG GRANT DREDGE AREA , 2024 BIG GRANT i DREDGE AREA Figure 1 - Dubuque Marina Area to be Dredged 2024 Maintenance Dredging Project No. 1 2022 BIG Tier 1 Grant Funding was used to perform dredging within the area outlined in RED, this project was complete in 2024. 2025 Maintenance Dredging Project 2024 BIG Tier 1 Grant Funding to be used to perform dredging within the area outlined in GREEN. The dredging project will provide adequate depth and an improved open waterway for safely navigating transient vessels. By dredging and creating the open waterway from the Peosta Channel to the marina transient docks, this will create improved water flow and water circulation which will reduce the potential for future sediment siltation within the proposed dredge location. The proposed dredged open waterway will be more sustainable long-term and will maximize the return on the investment of federal BIG funding with a long-term solution in providing safe harbor access for daily and overnight transient boaters. 2 Page 1011 of 1311 BID RESULTS The City received one (1) sealed bid on July 24, 2025, for the 2025 Maintenance Dredging Project. Newt Marine Service, of Dubuque, IA submitted the only bid in the base bid amount of $211,455.50, which is 4.32% over the base bid estimate of probable cost. A summary of the bid proposal received is as follows: Contractor Name Base Bid Alternate 1 Alternate 2 Total Bid Newt Marine Service $ 211,455.50 $ 20,000.00 $ 6,930.00 $ 238,385.50 The bid proposal for the project included two add alternates. The add alternates are as follows: Alternate No. 1 - contractor to remove and replace dock pipe pile spuds. Remove of the dock pipe pile spuds will allow the T-dock section to be temporarily removed to allow dredging to occur around and under the dock. Upon completion of the dredging, Dubuque Marina intends to reconfigure the dock to provide improved broadside boating access to the newly installed pump out facilities on the dock. Alternate No. 2 - contractor to dredge boat lift well. Dredge the boat lift well area to provide transient boaters, who operate vessels 26 feet or larger the ability to have their vessels serviced and maintained as the needs arise. RECOMMENDATION It is not a surprise that only one (1) bid was received. The Notice to Bidders for the 2025 Maintenance Dredging Project No. 1 was publicly advertised, on the City's website and plan room services with statewide and regional circulation, with eight (8) dredging contractors downloaded plans from the City's website. Historically, when the City bid previous maintenance dredging projects, Newt Marine Service has been the only contractor that submitted a bid proposal. Newt Marine Service is the only local marine contractor that has the marine plant equipment and capabilities to complete the mechanical dredging operations. I recommend awarding the public improvement contract for the 2025 Maintenance Dredging Project to Newt Marine Service in the base bid amount of $211,455.50 and concurrence in selecting both Alternate No. 1 and Alternate No. 2 in the amount of $26,930.00 for a total contract award in the amount of $238,385.50, subject to the concurrence of the Iowa DNR and USFWS. 3 Page 1012 of 1311 BUDGETIMPACT The estimate of probable cost for the 2025 Maintenance Dredging Project is summarized in the following table: Description Cost Estimate Award Dredge Construction - Dubuque Marina $ 202,700.00 $ 211,455.50 Alternate 1 — Remove and Replace Dock Spuds 18,000.00 20,000.00 Alternate 2 — Lift Well Dredging 14,400.00 6,930.00 Bid Award Amount $ 235,100.00 $ 238,385.50 Contingency (Over Dredge Depth) 35,000.00 31,714.50 Total Construction Cost Estimate $ 270,100.00 $ 270,100.00 The proposed project funding is summarized as follows: Project Number Fund Description Fund Amount 5546000001-304-67990 Harbor Area Dredging (BIG TIER 1 Grant) $ 170,100.00 Private Participation - Dubuque Marina 100,000.0 Total Project Funding $ 270,100.00 The 2025 Maintenance Dredging Project included an estimated 5,000 cubic yards of dredge material to be removed. However, based on the Newt Marine Service bid unit cost of $38.50 per cubic yard for dredging, the City may need to adjust and reduce the quantity of dredge material to be removed (4,500 cubic yards) to ensure there is sufficient contingency funds available to cover over depth dredge quantities. REQUESTED ACTION I respectfully request that the City Council award the Public Improvement Construction Contract for the 2025 Maintenance Dredging Project to Newt Marine Service in the base bid amount of $211,455.50 and concurrence in selecting both Alternate No. 1 and Alternate No. 2 in the amount of $26,930.00 for a total contract award of $238,385.50, through adoption of the attached resolution, subject to the concurrence of the Iowa DNR and USFWS. cc: Jenny Larson, Chief Financial Officer Nathan Steffen, Civil Engineer George Scholten, Iowa DNR Dubuque Marina FAPROJECTS\DREDGING PROJECTS\2025 Maintenance Dredge\Council & Staff Documents\Award 0 Page 1013 of 1311 Prepared by Robert Schiesl City of Dubuque Engineering 50 W. 13" St. Dubuque IA 52001 (563)589-4270 Return to Adrienne N. Breitfelder City Clerk City of Dubuque, 50 W. 131h St. Dubuque, IA 52001 (563)589-4100 RESOLUTION NO. 260-25 AWARDING PUBLIC IMPROVEMENT CONSTRUCTION CONTRACT FOR THE 2025 MAINTENANCE DREDGING PROJECT WHEREAS, sealed proposals have been submitted by contractors for the 2025 Maintenance Dredging Project, (the Project) pursuant to Resolution No. 250-25 and Notice to Bidders published on the City of Dubuque, Iowa website and plan room service with statewide circulation on the 15th day of July 2025; and WHEREAS, said sealed proposal was opened and read on the 241h day of July 2025 and it has been determined that Newt Marine Service, of Dubuque, Iowa submitted the low base bid in the amount of $211,455.50, Alternate No. 1 in the amount of $20,000.00, and Alternate No. 2 in the amount of $6,930.00, for a total bid of $238,385.50, and is the lowest responsive, responsible bidder for the Project. NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: SECTION 1. That a Public Improvement Construction Contract for the Project is hereby awarded to Newt Marine Service and the City Manager is hereby directed to execute a Public Improvement Construction Contract on behalf of the City of Dubuque for the Project, subject to the concurrence of the Iowa DNR and USFWS. Passed, adopted, and approved this 4th day of August 2025. Brad M.,E!!�a gh, Mayor Attest: Adrienne N. Breitfelder, City Clerk THE CITY OF DUB E Masterpiece on the Mississippi City of Dubuque, Iowa Bid Tabulation Project Name: 2025 Maintenance Dredging Project 9LINE REFERENCE BID ITEM DESCRIPTION NO. NUMBER Bid Date Engineer's Estimate Newt Marine Service 25-Apr-24 PLAN QUANTITY UNIT ESTIMATED UNIT PRICE TOTAL PRICE BID UNIT PRICE TOTAL PRICE Division 11020 - Mobilization 1 11020-108-A-0 Mobilization 1 LS $ 28,350.00 $ 28,350.00 $ 25,000.00 $ 25,000.00 Division 12 - Non-SUDAS Items 2 SIP 01100 Excavation - Mechanical Dredging 4843 % Over / Under (-) CY $ 36.00 $ 174,348.00 $ 38.50 $ 186,455.50 Sub Total $ 174,348.00 Sub Total $ 186,455.50 Total Est. $ 202,698.00 Total Bid $ 211,455.50 4.32% LINE ITEM NUMBER NBID ITEM DESCRIPTION PLAN UNIT ESTIMATED TOTAL PRICE BID TOTAL PRICE NO. QUANTITY UNIT PRICE UNIT PRICE Alternate 1 - Dock Spuds 3 n/a Dock Spuds - Remove and Re -set Alternate 2 - Lift Well Dredging 4 SIP 01100 Excavation - Mechanical Dredging 1 LS $ 18,000.00 $ 18,000.00 $ 20,000.00 $ 20,000.00 Sub Total $ 18,000.00 Sub Total $ 20,000.00 180 CY $ 80.00 $ 14,400.00 $ 38.50 $ 6,930.00 Sub Total $ 14,400.00 Sub Total $ 6,930.00 Total Bid Amount $ 202,698.00 $ 211,455.50 Total Selected Alternate(s) Amount $ 32,400.00 $ 26,930.00 Contract Award Amount: $ 235,098.00 $ 238,385.50 Page 1015 of 1311