Loading...
Central Avenue and White Street Corridor Design Phase 1; Consulting Engineering Services RFQ AuthorizationCity of Dubuque City Council ACTION ITEMS # 4. Copyrighted August 4, 2025 ITEM TITLE: Central Avenue and White Street Corridor Design Phase 1; Consulting Engineering Services RFQ Authorization SUMMARY: City Manager recommending City Council authorization to release a request for qualifications (RFQ) to hire a consultant to assist with the design of Central Avenue and White Street Corridor Design Phase 1. SUGGUESTED Receive and File; Approve DISPOSITION: ATTACHMENTS: 1. MVM Memo 2. 2025-07-29_CW_Corridor Design_P1_RFQ-Authorization_StaffMemo Page 1217 of 1311 THE CITY OF Dubuque DuBE uFA�a9a av Masterpiece on the Mississippi rP PP zoo�•*o 13 2017202019 TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: Central Avenue and White Street Corridor Design Phase 1; Consulting Engineering Services RFQ Authorization DATE: July 29, 2025 City Engineer Gus Psihoyos is recommending City Council authorization to release a request for qualifications (RFQ) to hire a consultant to assist with the design of Central Avenue and White Street Corridor Design Phase 1. I concur with the recommendation and respectfully request Mayor and City Council approval. Y Mic ael C. Van Milligen MCVM:sv Attachment cc: Crenna Brumwell, City Attorney Cori Burbach, Assistant City Manager Gus Psihoyos, City Engineer Bryce Marifke, Traffic Engineer Intern Justine Hull, Traffic Engineer Dave Ness, Civil Engineer Arielle Swift, Public Works Director Jill Connors, Economic Development Director Wally Wernimont, Planning Services Director Jeremy Jensen, Chief of Police Steve Fehsal, Interim Parks and Recreation Director Amy Scheller, Fire Chief Ryan Knuckey, Transit Director Page 1218 of 1311 THE CITY OF DUB E Masterpiece on the Mississippi TO: Michael C. Van Milligen, City Manager FROM: Gus Psihoyos, City Engineer DATE: July 29, 2025 Dubuque *Awin ah �I ICW1L CIVIC: I I�NA 1� 2007-2012.2013 2017*2019 SUBJECT: Central Avenue and White Street Corridor Design Phase 1; Consulting Engineering Services RFQ Authorization INTRODUCTION The purpose of this memorandum is to request authorization to release a request for qualifications (RFQ) for Central Avenue and White Street Corridor Design Phase 1. BACKGROUND In January 2021, the City of Dubuque regained control of Central Avenue and White Street from the State of Iowa through a Memorandum of Understanding. This change allowed the City to explore converting the streets to two-way traffic and incorporate complete street principles and urban design strategies in support of the Central Avenue Corridor Streetscape Master Plan. A corridor study completed in 2024 found that Central Avenue, with 8,000 vehicles per day, and White Street, with 5,000 vehicles per day, are key parts of the downtown transportation network. Instead of viewing them as two separate roads, the corridor is better understood as 22 individual blocks whose character can vary based on nearby land use. Additionally, freight traffic impacts can be reduced by encouraging use of a defined truck route. After evaluating several lane and traffic flow options with community input and data analysis, the City selected the Multi -Modal Focused Alternative as the preferred design. This option keeps the streets one-way but removes parking from one side to create space for wider sidewalks, landscaping, and outdoor dining on Central Avenue, and a two-way cycle track along White Street. This configuration preserves current traffic signal coordination while enhancing safety and accessibility for pedestrians and cyclists. Supported by residents and approved by the City Council, the design balances vehicle traffic needs with a more welcoming, multi -use urban environment. Page 1219 of 1311 DISCUSSION The RFQ has been prepared with the input of various city staff members. The following staff members will review the qualifications of those firms that respond and formulate a recommendation- 1 . Justine Hull, Engineering (City Project Manager for project) 2. Duane Richter, Engineering 3. Bob Schiesl, Engineering 4. Brian Wulfekuhle, Public Works 5. Ian Hatch, Economic Development 6. Jason Duba, Planning 7. Scott Baxter, Police Department 8. Steve Fehsal, Leisure Services 9. Derek Paulson, Fire Department 10. Joey Lueck, Transit Department The desired Droiect schedule is as follows: City Council RFQ Initiate: August 4, 2025 Design Service RFQ Advertise: August 8, 2025 Questions Due: September 9, 2025 Response Addendum Due: September 11, 2025 Qualifications Due: September 18, 2025 Committee Review & Shortlist: September 22, 2025 thru October 3, 2025 Shortlist Interviews: October 13, 2025 thru October 17, 2025 Recommendation to City Manager: October 29, 2025 City Council Award: November 3, 2025 Contract Scope Submittal: November 21, 2025 Recommendation to City Manager: December 2, 2025 City Council Approval: December 8, 2025 2 Page 1220 of 1311 RECOMMENDATION I recommend releasing an RFQ for the implementation of Central Avenue and White Street Corridor Design Phase 1. BUDGETIMPACT The total project funding requested in the FY26 CIP budget is summarized as follows: Central Avenue and White Street Corridor Design Phase 1 Funding Fund Source FY26 FY27 FY28 FY29 FY30 TOTAL Greater $ 1,400,000 $ 330,000 $ 0 $ 0 $ 0 $ 1,730,000 Downtown TIF G.O. Debt $ 0 $ 0 $1,760,000 $1,780,000 $2,900,000 $ 6,440,000 (GDTIF) TOTAL $ 1,400,000 $ 330,000 $1,760,000 $1,780,000 $2,900,000 $ 8,170,000 ACTION TO BE TAKEN I respectfully request approval to release an RFQ to hire a consultant to assist with the design of Central Avenue and White Street Corridor Design Phase 1. Prepared by Bryce Marifke, Traffic Engineer Intern cc: Justine Hull, Civil Engineer Dave Ness, Civil Engineer Arielle Swift, Public Works Jill Connors, Economic Development Wally Wernimont, Planning Services Director Jeremy Jensen, Chief of Police Steve Fehsal, Leisure Services Amy Scheller, Fire Chief Ryan Knuckey, Transit Director 3 Page 1221 of 1311