Loading...
Water System Improvements 2024 North English Road Water Main Extension Project State Revolving Fund (SRF) Loan: Environmental ReviewCity of Dubuque City Council Copyrighted September 2, 2025 ITEMS SET FOR PUBLIC HEARING # 4. ITEM TITLE: Water System Improvements 2024 North English Road Water Main Extension Project State Revolving Fund (SRF) Loan: Resolution Setting the Public Hearing - Environmental Review SUMMARY: City Manager recommending City Council adopt the attached resolution and set the public hearing for October 6, 2025, as required for all designated projects receiving assistance from the State Revolving Fund (SRF) with a Finding of No Significant Impact, to review the revised Environmental Information Document (EID) for the Water System Improvements 2024 North English Road Water Main Extension Project. RESOLUTION State Revolving Fund (SRF) Loan - Environmental Review Water System Improvements 2024 North English Road Water Main Extension Project Set The Date For A Public Hearing Of The City Council Of The City Of Dubuque, Iowa On Approval Of An Environmental Review As Provided By SRF's Department Of Natural Resources For The Private Lead Service Line Replacement Pilot Program SUGGUESTED Receive and File; Adopt Resolution(s), Set Public Hearing for DISPOSITION: October 6, 2025 ATTACHMENTS: 1. MVM Memo 2. N English Rd WM Extension Memo Set Public Hearing 8.26.2025 3. N English Rd WM Extension Resolution for Public Hearing 8.26.2025 4. Dubuque North English_FNSI Public Notice 8.25.2025 Page 329 of 629 Dubuque THE C D!Uj-!B AII-America Ciq 11111.1 II Masterpiece on the Mississippi YP PP zoo�•*o 13 2017202019 TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: Water System Improvements 2024 North English Road Water Main Extension Project State Revolving Fund (SRF) Loan Resolution Setting the Public Hearing - Environmental Review DATE: August 26, 2025 Water Department Director Christopher Lester is recommending City Council adopt the attached resolution and set the public hearing for October 6, 2025, as required for all designated projects receiving assistance from the State Revolving Fund (SRF) with a Finding of No Significant Impact, to review the revised Environmental Information Document (EID) for the Water System Improvements 2024 North English Road Water Main Extension Project. Origin Design has completed the plans and specifications for the installation of a 12- inch water main extension starting at Edval Lane on N. Cascade Road south to the SW Arterial. At the intersection with the SW Arterial, the main will head west to North English Mill Road, turning north along North English Road for approximately 1,100 feet. The North English Road water main extension creates a path for a future loop and connection of Pressure Zone 3 and 4, when in later phases it can extend to English Mill Road and then south to the English Mill Pump Station. This project has been awarded funding through the Iowa State Revolving Fund (SRF) program, which is administered locally by the Iowa Department of Natural Resources (DNR). As part of the loan process, the project is subject to a federally mandated environmental review. The SRF program offers several financial advantages, including variable low interest rates, paying interest only on funds as they are drawn, 0% interest loans for planning and design costs for up to three years or until construction begins, and flexible repayment terms of up to 30 years. These features help reduce overall project costs and improve long-term affordability for the community. The environmental review is summarized in an Environmental Information Document (EID), which is provided to the City by DNR and SRF environmental staff. The EID will be made available upon request, and a hardcopy will be available two weeks prior to the public hearing and will also be accessible at the hearing itself. The hearing notice will be advertised to the public not less than thirty (30) days before the date of the Page 330 of 629 hearing. Any public comments received during the hearing will be submitted to DNR/SRF staff for consideration. This hearing is a required component of the SRF loan environmental review process and provides an opportunity for interested citizens to offer comments or raise questions regarding the potential environmental impacts of the proposed project. Following the public hearing, the City will submit the public hearing record, the certification of publication, and the executed Environmental Information Document (EID) to the SRF Environmental Review Specialist for review and environmental clearance I concur with the recommendation and respectfully request Mayor and City Council approval. v Mic ael C. Van Milligen MCVM:sv Attachment cc: Crenna Brumwell, City Attorney Cori Burbach, Assistant City Manager Christopher Lester, Water Department Director Jenny Larson, Chief Financial Officer Randy Gehl, Public Information Officer Eldon Schneider, Water Project Supervisor Carl Plumley, Water Distribution Supervisor 2 Page 331 of 629 THE CITY OF DUBQ YE Masterpiece on the Mississippi TO: Michael C. Van Milligen, City Manager FROM: Christopher Lester, Water Department Director Dubuque AII•Aeerin City viKnti rnx: ii. I I'/ I I 2007.2012.2013 2017.2019 DATE: August 26, 2025 RE: Water System Improvements 2024 North English Road Water Main Extension Project State Revolving Fund (SRF) Loan Resolution Setting the Public Hearing - Environmental Review INTRODUCTION The purpose of this memorandum is to request the City Council adopt the attached resolution and set the public hearing for October 6, 2025, as required for all designated projects receiving assistance from the State Revolving Fund (SRF) with a Finding of No Significant Impact. The purpose of the public hearing is to review the Environmental Information Document (EID) project area maps for the Water System Improvements 2024 North English Road Water Main Extension Project. BACKGROUND The City of Dubuque's Water Department has identified a phased capital improvement program to extend and make necessary improvements throughout the community. The improvements are primarily associated with the water distribution system. These improvements will address water resiliency, reduce bottlenecks, improve water storage and pumping at key locations throughout the community to support the existing customer base and prepare the city for increased demands associated with existing and new customers. The improvements will also assist the City's need to reduce and better manage dead-end water mains and other areas where the water age and water quality can suffer due to lack of circulation. In 2022, Origin Design was awarded the City -Wide Water Distribution System, Storage, and Pumping Improvements Project and completed the preliminary design identifying five (5) capital projects. One of the five projects is the North English Road Water Main Extension project that will bring water service to a portion of the SW Arterial, starting at Edval Lane and N. Cascade Road, west along the SW Arterial to North English Road. This project will allow continued extensions, looping water main along the SW Arterial between USHWY 151/61 to USHWY 20 while also providing service between pressure zones and increasing water service reliance to the city's southern and western most customers. Origin Design has completed the plans and specifications for the installation of a 12-inch water main extension starting at Edval Lane on N. Cascade Road south to the SW Arterial. At the intersection with the SW Arterial, the main will head west to North English Mill Road, turning Page 332 of 629 north along North English Road for approximately 1,100 feet. The North English Road water main extension creates a path for a future loop and connection of Pressure Zone 3 and 4, when in later phases it can extend to English Mill Road and then south to the English Mill Pump Station. DISCUSSION This project has been awarded funding through the Iowa State Revolving Fund (SRF) program, which is administered locally by the Iowa Department of Natural Resources (DNR). As part of the loan process, the project is subject to a federally mandated environmental review. The SRF program offers several financial advantages, including variable low interest rates, paying interest only on funds as they are drawn, 0% interest loans for planning and design costs for up to three years or until construction begins, and flexible repayment terms of up to 30 years. These features help reduce overall project costs and improve long-term affordability for the community. The environmental review is summarized in an Environmental Information Document (EID), which is provided to the City by DNR and SRF environmental staff. The EID will be made available upon request, and a hardcopy will be available two weeks prior to the public hearing and will also be accessible at the hearing itself. The hearing notice will be advertised to the public not less than thirty (30) days before the date of the hearing. Any public comments received during the hearing will be submitted to DNR/SRF staff for consideration. This hearing is a required component of the SRF loan environmental review process and provides an opportunity for interested citizens to offer comments or raise questions regarding the potential environmental impacts of the proposed project. Following the public hearing, the City will submit the public hearing record, the certification of publication, and the executed Environmental Information Document (EID) to the SRF Environmental Review Specialist for review and environmental clearance. REQUESTED ACTION I respectfully request that the City Council adopt the attached resolution and set the public hearing for October 6, 2025, to review the revised Environmental Information Document (EID) for the Water System Improvements 2024 North English Road Water Main Extension Project. cc: Jenny Larson, Chief Financial Officer Randy Gehl, Public Information Officer Eldon Schneider, Water Project Supervisor Carl Plumley, Water Distribution Supervisor Page 333 of 629 Prepared by: Christopher Lester Water Department 901 Hawthorn St. Dubuque IA 52001 (563) 589-4290 Return to Adrienne N. Breitfelder, City Clerk, 50 W. 13th St., Dubuque, IA 52001, (563) 589-4100 RESOLUTION NO. 287-25 STATE REVOLVING FUND (SRF) LOAN - ENVIRONMENTAL REVIEW WATER SYSTEM IMPROVEMENTS 2024 NORTH ENGLISH ROAD WATER MAIN EXTENSION PROJECT SET THE DATE FOR A PUBLIC HEARING OF THE CITY COUNCIL OF THE CITYOF DUBUQUE, IOWA ON APPROVAL OF AN ENVIRONMENTAL REVIEW AS PROVIDED BY SRF'S DEPARTMENT OF NATURAL RESOURCES FOR THE PRIVATE LEAD SERVICE LINE REPLACEMENT PILOT PROGRAM Whereas, the City of Dubuque is pursuing an engineered solution to bring water service to a portion of the SW Arterial, starting at Edval Lane and N. Cascade Road, west along the SW Arterial to North English Road through an Iowa, State Revolving Fund assisted pilot program; and Whereas, as part of the SRF loan process, the City is required to complete an environmental review through the public hearing process; and Whereas, a discussion is to be held on the environmental impacts of the project; and Whereas, a transcript of the public hearing and a summary of public comments will be available for public review; and Whereas, before said obligations may be approved, Chapter 403 of the Code of Iowa requires that the City Clerk publish a notice of the proposal and of the time and place of the meeting at which the City Council proposes to take action thereon and at which meeting the City Council shall receive oral and/or written objections from any resident or property owner of said City to such proposed action. NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: Section 1. The City Clerk is hereby authorized and directed to cause this Resolution and a Notice to be published as prescribed by Iowa Code Section 364.7 of a public hearing on the City Council's intent to approve the proposed Development Agreement, to be held on the 6th day of October 2025 at 6:30 p.m. Section 2. The City Clerk is hereby directed to cause at least one publication to be made of a notice of said meeting, in a newspaper, printed wholly in the English language, published at least once weekly, and having general circulation in said City, said publication to be not less than thirty (30) days before the date of said hearing. At the hearing, any interested person may appear and file objections to the environmental impact document or attachments relating to the project. Passed, adopted, and approved this 2nd day of September, 2025. Attest: Adrienne N. Breitfelder, City Clerk SRF Public Notice PUBLIC HEARING NOTICE The City of Dubuque will be holding a Public Hearing to review an application for a State Revolving Fund (SRF) loan and to make available to the public the contents of an environmental information document and the City's project plan. These documents include design and environmental information related to the proposed improvements to the City's water supply system. The proposed project includes installation of approximately 3,250 LF ductile iron pipe installed using standard open trench methods and 110 LF of steel casing will be jack and bored under North Cascade Rd. The open trench installation dimensions will be approximately 3,120-ft. by 10-ft. by 6-ft (LxWxH). The purpose of this Public Hearing is to inform area residents of the community of Dubuque of this proposed action, discuss the actual cost and user fees associated with this project, and to address citizen's concerns, if any, with the plan. The Public Hearing location and time are as follows: October 6, 2025 — 6:30 p.m. Historic Federal Building Second Floor Council Chambers 350 W. 6th Street, 2nd Floor Council Chambers Dubuque, Iowa 52001 All interested persons are encouraged to attend this hearing. Written comments on this proposal may also be submitted prior to the hearing. Questions regarding this hearing or the availability of documentation may be directed to Christopher Lester, Water Department Director at 563.589.4291. Additionally, public comments can be sent to SRF-PCgdnr.iowa. -og_v. Page 336 of 629