Bunker Hill Foundation Repair Project AcceptanceCity of Dubuque
City Council
CONSENT ITEMS # 5.
Copyrighted
September 15, 2025
ITEM TITLE: Bunker Hill Foundation Repair Project Acceptance
SUMMARY: City Manager recommending City Council adopt the attached
resolution to accept the Bunker Hill Foundation Repair
Project and authorize the payment of the contract amount of
$290,647.21 to Tricon General Construction, Inc.
RESOLUTION Accepting The Bunker Hill Foundation Repair
Project And Authorizing The Payment Of The Contract
Amount To The Contractor
SUGGUESTED Receive and File; Adopt Resolution(s)
DISPOSITION:
ATTACHMENTS:
1. MVM Memo
2. Staff Memo
3. Resolution
4. Engineer Certification
5. Final Retainage Payment
Page 182 of 1171
THE CITY OF
DUBE
Masterpiece on the Mississippi
TO: The Honorable Mayor and City Council Members
FROM: Michael C. Van Milligen, City Manager
SUBJECT: Bunker Hill Foundation Repair Project Acceptance
DATE: September 9, 2025
Dubuque
AI WIN av
2007-2012.2013
2017*2019
Interim Parks and Recreation Director Stephen Fehsal is recommending City Council
adopt the attached resolution to accept the Bunker Hill Foundation Repair Project and
authorize the payment of the contract amount of $290,647.21 to Tricon General
Construction, Inc.
I concur with the recommendation and respectfully request Mayor and City Council
approval.
Y
Mic ael C. Van Milligen
MCVM:sv
Attachment
cc: Crenna Brumwell, City Attorney
Cori Burbach, Assistant City Manager
Stephen Fehsal, Interim Parks and Recreation Director
Marie Ware, Acting Project and Facilities Manager
Jennifer Larson, Chief Financial Officer
Page 183 of 1171
THE CITY OF
DUB E
Masterpiece on the Mississippi
TO: Michael C. Van Milligen, City Manager
FROM: Stephen J. Fehsal, Interim Parks and Recreation Director
SUBJECT: Bunker Hill Foundation Repair Project Acceptance
DATE: September 8, 2025
INTRODUCTION
Dubuque
All -America City
2007-2012.2013
2017*2019
The purpose of this memorandum is to recommend that the City Council accept the
Bunker Hill Foundation Repair Project and approve the attached resolution.
:y_T@J 201:Tell]Z I R"
The project consists of a partial lower -level concrete masonry unit foundation wall
removal and replacement with a cast -in -place concrete footing and foundation wall,
lower -level window and door infilling, lower -level window and door replacement,
foundation excavation for waterproofing and drainage, backfill, site concrete sidewalk
and asphalt pavement, roof access stair removal, and construction of a stairwell
enclosure.
DISCUSSION
The Bunker Hill Foundation Repair Project was completed by Tricon General
Construction, Inc. in the final contract amount of $290,647.21. The original contract
amount was $284,000.00. The increase in cost of $6,647.21 is due to change orders
related to (1) repair deteriorated joints in limestone foundation wall either by
tuckpointing or concrete patching material for $2409.12, (2) unsuitable soils discovered
below the new foundation wall footing causing 12" undercut and replacement with a
thickened concrete footing for $1001.34 and (3) brick and stone foundation below the
utility chase and adjacent stoop in disrepair once uncovered and created a need for a
frost protected foundation below the utility chase for $2094.43.
Strand Associates Inc. is recommending acceptance of the project.
Page 184 of 1171
RECOMMENDATION
I recommend that the City Council accept the Bunker Hill Foundation Repair Project
Acceptance and authorize the payment of the contract amount of $290,647.21 to Tricon
General Construction, Inc. based on the facts above.
BUDGETIMPACT
The summary of project costs for the Bunker Hill Foundation Repair Project is as
follows:
Construction Contract
Award
$284,000.00
The project funding summary is as follows:
Project No. Fund Description
3043000073-304 Bunker Building Remediation
ACTION STEP
Final
$290,647.21
Fund Amount
$290,647.21
The City Council is requested to adopt the attached resolution to accept the Bunker Hill
Foundation Repair Project and authorize the payment of the contract amount of
$290,647.21 to Tricon General Construction, Inc.
cc: Jennifer Larson, Chief Financial Officer
Prepared by: Marie L. Ware, Acting Project and Facilities Manager
2
Page 185 of 1171
Prepared by Marie L. Ware, Acting Project and Facilities Manager, 2200 Bunker Hill Rd Dubuque IA 52001 (563)
589-4263
Return to Adrienne N. Breitfelder, City Clerk, 50 W. 1311 St., Dubuque, IA 52001, (563) 589-4100
RESOLUTION NO. 294-25
ACCEPTING THE BUNKER HILL FOUNDATION REPAIR PROJECT AND
AUTHORIZING THE PAYMENT OF THE CONTRACT AMOUNT TO THE
CONTRACTOR
WHEREAS, the Public Improvement Contract forthe Bunker Hill Foundation Repair
Project (the Project) has been completed by the contractor, Tricon General Construction
Inc. (Contractor) and Strand Associates Inc. has examined the work and filed a certificate
stating that the Project has been completed according to the terms of the Public
Improvement Contract and that Strand Associates Inc. recommends that the Project be
accepted; and
WHEREAS, the final contract amount for the Project is $290,647.21; and
WHEREAS, the contractor has previously been paid $276,114.85, leaving a
balance of $14,532.36; and
WHEREAS, the City Council finds that the recommendation of Strand Associates
Inc. should be accepted.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF
DUBUQUE, IOWA THAT:
Section 1. The recommendation of Strand Associates, Inc. is approved, and the Project
is hereby accepted.
Section 2. The Chief Financial Officer is hereby directed to pay the balance of the
retainage of $14,532.36 as provided in Iowa Code chapter 573, and to pay such retainage
in accordance with the provisions of Iowa Code chapter 573 or Iowa chapter 26.13.
Passed, approved, and adopted this 15th day of September, 2025.
Attest:
Adrienne N. Breitfelde ; CMC City Clerk
6 : ARI
STRAND
ASSOCIATES
Excellence in Engi wnng5m
Strand Associates, Inc
910 West Wingra Drive
Madison, WI 53715
(P) 608.251.4843
www.strand.com
September 3, 2025
Ms. Marie Ware, Acting Project and Facilities Manager
City of Dubuque
2200 Bunker Hill Road
Dubuque, IA 52001
Re: Bunker Hill Foundation Repair Project
Contract 3043000073-304
City of Dubuque, Iowa
Dear Marie,
This letter serves as our recommendation of final payment for Contract 3043000073-304. Enclosed is a
copy of the final Application for Payment and accompanying documentation in accordance with the
Contract Documents, including the List of Items to be Completed or Corrected that was developed based
on a final inspection that occurred on June 18, 2025. Based upon our observation of the Work and
information provided by OWNER during construction and final inspection, and our review of the final
Application for Payment, it appears the Work has been satisfactorily completed. Therefore, we
recommend final payment of the amount indicated on the enclosed final Application for Payment.
This letter provides our written notice to OWNER and CONTRACTOR (by copy of this letter) that the
Work is acceptable, subject to stated provisions of the Contract.
The Substantial Completion and Final Completion dates of June 9, 2025, and June 23, 2025, set in the
Contract were met. The CONTRACTOR's maintenance bond will be security for a period of 2 years
after Substantial Completion.
Please call 608-251-4843 if there are any questions.
Sincerely,
STRAND ASSOCIATES, INC.®
Evan J. Constant, P.E.
Enclosures
c/enc: Jon Routley, Tricon Construction Group
Philip Tran, Tricon Construction Group
Matt Yentz, Strand Associates, Inc.®
Justin Bilskemper, Strand Associates, Inc.®
1154.133\EJC:tll\R\MAD\Documents\Specifications\AmUive\2025\Dubugw, City of(IA)\1154.129.3043000073-304.EJC�16) Specification Leam\(h) Final payment and Notice of Acceptability of
Work\FinalPayment.090325.doex
Arizona I Illinois I Indiana I Iowa I Kentucky I Ohio I Tennessee I Texas I Wisconsin
Page 187 of 1171
APPLICATION AND CERTIFICATE FOR PAYMENT
AIA DOCUMENT G702
PAGE ONE OF
TWO PAGES
TO OWNER:
PROJECT:
APPLICATION NO: 3 Distribution to:
City of Dubuque
Bunker Hill Foundation Repair Project
APPLICATION DATE: 09/02/25
OWNER
Parks & Recreation Dept
2200 Bunker Hill Road
PERIOD TO: 08/31/25
CONSTRUCTION
1157 Central Ave
Dubuque, IA 52001
PROJECT NO: 22508525
MANAGER
Dubuque, IA 52001
3043000073-304
ARCHITECT
FROM CONTRACTOR:
CONTRACT DATE: 03/20/25
CONTRACTOR
Tricon General Construction
OTHER
1230 East 12th Street
OTHER
Dubuque, IA 52001
CONTRACT FOR: Foundation Repair VIA ARCHITECT: Strand & Associates 910 W Wingra Drive, Madison, WI 53715
CONTRACTOR'S APPLICATION FOR PAYMENT The undersigned Contractor certifies that to the best of the Contractor's knowledge, information and belief
Application is made for payment, as shown below, in connection with the Contract. the Work covered by this application for Payment has been completed in accordance with the Contract
Continuation Sheet, AIA Document G703, is attached. Documents, that all amounts have been paid by the Contractor for Work for which previous Certificates for
Payment were issued and payments received from the Owner, and that current payment shown herein is now due.
1. ORIGINAL CONTRACT SUM
2. Net change by Change Orders
3. CONTRACT SUM TO DATE (Line 1 +f- 2)
4. TOTAL COMPLETED & STORED TO DATE
(Column G on G703)
5. RETAINAGE:
a. 51/. of Completed Work (Column D + E on G703)
b. 5% of Stored Material (Column F on G703)
TOTAL RETAINAGE
(Lines 5a + 5b or Total in Column I of G703)
6. TOTAL EARNED LESS RETAINAGE
7. LESS PREVIOUS CERTIFICATES FOR PAYMENT
(Line 6 from prior Certificate)
8. CURRENT PAYMENT DUE
9. BALANCE TO FINISH, INCLUDING RETAINAGE
(Line 3 less Line 6)
$284,000.00 CONTRACTOR: Triun Construction Group
$6,647.21 dd
$290,647.21 By: d 1 Dater
$290,647.21
State of: Iowa County of: Dubuque
Subscribed and sworn to before me this ;z" day of
$0.00 Notary Public:�Si11ARY K STONE
$0.00
a Commission Number 816418
$0.00 —i �. `:7 My Commission Expires
CERTIFICATE F PAYMENT
$290.647.21 In accordance with the Contract ocuments, based on on -site observations and the data comprising this application, the
Construction Manager and Architect certify to the Owner that to the best of their knowledge, information and belief the Work
$276,114.85 has progressed as indicated, the quality of the Work is in accordance with the Contract Documents, and the Contractor is
$14,532.36 entitled to payment of the AMOUNT CERTIFIED.
$0.00 AMOUNT CERTIFIED $ I� S3Z • 360
(Attach explanation if amount certified differs from amount applied for. Initial all figures on this Application and on the
Continuation Sheet that changed to conform to the amount certified.
CHANGE ORDER SUMMARY
ADDITIONS
DEDUCTIONS
Total changes approved in previous months
$6,647.21
Total approved this Month
TOTALS:
$6,647.21
$0.00
NET CHANGES by Change Order:
1 $6,647.21
ARCHITECT
By ��' �� Date:
This Certificate is not negotiable. the AMOUNT CERTIFIED is payable only to the Contractor named herein. Issuance,
payment and acceptance of payment are without prejudice to any rights of the Owner or Contractor under this Contract.
AIA DOCUMENT G702 APPLICATION AND CERTIFICATE FOR PAYMENT CONSTRUCTION MANAGER ADVISER 1992 EDITION AIA
THE AMERICAN INSTITUTE OF ARCHITECTS, 1745 NEW YORK AVE. N.W. WASHINGTON, DC 20006-5292
Users may obtain validation of this document by requesting of the license a completed AIA Document D401- Certification of Document's Authenticity
Page 188 of 1171
CONTINUATION SHEET AIA DOCUMENT G703 PAGE TWO OF TWO PAGES
AIA DOCUMENT G702, APPLICATION AND CERTIFICATION FOR PAYMENT, containing APPLICATION NO: 3
Contractor's signed certification is attached. APPLICATION DATE: 9/2/2025
In tabulations below, amounts are stated to the nearest dollar. PERIOD TO: 8/31/2025
Use Column 1 on Contracts where variable retainage for line items may apply. ARCHITECT'S PROJECT NO: 22508525
A
B
C
D I E
F
G
H
1
ITEM
NO.
DESCRIPTION OF WORK
SCHEDULED
VALUE
WORK COMPLETED
MATERIALS
PRESENTLY
STORED
(Not in D or E)
TOTAL
COMPLETED
AND STORED
TO DATE
(D+E+F)
%
(G / C)
BALANCE
TO FINISH
(C - G)
RETAINAGE
(IF VARIABLE
RATE)
FROM PREVIOUS
APPLICATION
(D + E)
THIS PERIOD
01
General Conditions
$39,872.00
$39,872.00
$39,872.00
100.0%
$0.00
$0.00
02
Bond
$3,950.00
$3,950.00
$3,950.00
0
100.0%
$0.00
$0.00
03
Demolition
$26,875.00
$26,875.00
$26,875.00
100.0%
$0.00
$0.00
04
Concrete Washout
$800.00
$800.00
$800.00
100.0%
$0.00
$0.00
05
Excavation
$41,876.00
$41,876.00
$41,876.00
0
100.% 0
$0.00
$0.00
06
Utilities
$14,895.00
$14,895.00
$14,895.00
100.0%
$0.00
$0.00
07
Seed/Sod
$1,478.00
$1,478.00
$1,478.00
100.0%
$0.00
$0.00
08
Asphalt
$4,680.00
$4,680.00
$4,680.00
100.0%
$0.00
$0.00
09
Concrete
$63,244.00
$63,244.00
$63,244.00
100.0%
$0.00
$0.00
10
Masonry
$4,900.00
$4,900.00
$4,900.00
°
100.0%
$0.00
$0.00
11
Steel
$2,700.00
$2,700.00
$2,700.00
100.0%
$0.00
$0.00
12
Shoring
$3,600.00
$3,600.00
$3,600.00
0
100.0 /o
$0.00
$0.00
13
Carpentry
$28,974.00
$28,974.00
$28,974.00
100.0%
$0.00
$0.00
14
Waterproofing
$4,108.00
$4,108.00
$4,108.00
0
100./o 0
$0.00
$0.00
15
EPDM
$4,900.00
$4,900.00
$4,900.00
100.0%
$0.00
$0.00
16
Windows
$1,704.00
$1,704.00
$1,704.00
0
100.0%
$0.00
$0.00
17
Doors/Hardware
$6,800.00
$6.800.00
$6,800.00
100.0%
$0.00
$0.00
18
Door Labor
$1,142.00
$1,142.00
$1,142.00
100.0%
$0.00
$0.00
19
Painting
$3,900.00
$3,900.00
$3,900.00
0
100.%0
$0.00
$0.00
20
Electrical
$6,752.00
$6,752.00
$6,752.00
100.0%
$0.00
$0.00
21
22
Contractor Fee
$16,850.00
$16,850.00
$16,850.00
100.0%
$0.00
$0.00
23
24
CO #1 Limestone Wall Repair
$2,409.12
$2,409.12
$2,409.12
100.0%
$0.00
$0.00
25
CO #2 Unsuitable Soils
$1,001.34
$1,001.34
$1,001.34
100.0%
$0.00
$0.00
26
CO #3 Pipe Chase Foundation
$2,094.43
$2,094.43
$2,094.43
0
100.%0
$0.00
$0.00
27
CO #4 Additional Wall Repair
$1,142.32
$1,142.32
$1,142.32
100.0%
$0.00
$0.00
28
29
30
31
32
Grand Total
$290,647.21
$290,647.21
$0.00
$0.00
$290,647.21
100.0%
$0.00
$0.00
Users may obtain validation of this document by requesting of the license a completed AIA Document D401 - Certification of Document's Authenticity