Bunker Hill Foundation Repair Project AcceptanceCity of Dubuque City Council CONSENT ITEMS # 5. Copyrighted September 15, 2025 ITEM TITLE: Bunker Hill Foundation Repair Project Acceptance SUMMARY: City Manager recommending City Council adopt the attached resolution to accept the Bunker Hill Foundation Repair Project and authorize the payment of the contract amount of $290,647.21 to Tricon General Construction, Inc. RESOLUTION Accepting The Bunker Hill Foundation Repair Project And Authorizing The Payment Of The Contract Amount To The Contractor SUGGUESTED Receive and File; Adopt Resolution(s) DISPOSITION: ATTACHMENTS: 1. MVM Memo 2. Staff Memo 3. Resolution 4. Engineer Certification 5. Final Retainage Payment Page 182 of 1171 THE CITY OF DUBE Masterpiece on the Mississippi TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: Bunker Hill Foundation Repair Project Acceptance DATE: September 9, 2025 Dubuque AI WIN av 2007-2012.2013 2017*2019 Interim Parks and Recreation Director Stephen Fehsal is recommending City Council adopt the attached resolution to accept the Bunker Hill Foundation Repair Project and authorize the payment of the contract amount of $290,647.21 to Tricon General Construction, Inc. I concur with the recommendation and respectfully request Mayor and City Council approval. Y Mic ael C. Van Milligen MCVM:sv Attachment cc: Crenna Brumwell, City Attorney Cori Burbach, Assistant City Manager Stephen Fehsal, Interim Parks and Recreation Director Marie Ware, Acting Project and Facilities Manager Jennifer Larson, Chief Financial Officer Page 183 of 1171 THE CITY OF DUB E Masterpiece on the Mississippi TO: Michael C. Van Milligen, City Manager FROM: Stephen J. Fehsal, Interim Parks and Recreation Director SUBJECT: Bunker Hill Foundation Repair Project Acceptance DATE: September 8, 2025 INTRODUCTION Dubuque All -America City 2007-2012.2013 2017*2019 The purpose of this memorandum is to recommend that the City Council accept the Bunker Hill Foundation Repair Project and approve the attached resolution. :y_T@J 201:Tell]Z I R" The project consists of a partial lower -level concrete masonry unit foundation wall removal and replacement with a cast -in -place concrete footing and foundation wall, lower -level window and door infilling, lower -level window and door replacement, foundation excavation for waterproofing and drainage, backfill, site concrete sidewalk and asphalt pavement, roof access stair removal, and construction of a stairwell enclosure. DISCUSSION The Bunker Hill Foundation Repair Project was completed by Tricon General Construction, Inc. in the final contract amount of $290,647.21. The original contract amount was $284,000.00. The increase in cost of $6,647.21 is due to change orders related to (1) repair deteriorated joints in limestone foundation wall either by tuckpointing or concrete patching material for $2409.12, (2) unsuitable soils discovered below the new foundation wall footing causing 12" undercut and replacement with a thickened concrete footing for $1001.34 and (3) brick and stone foundation below the utility chase and adjacent stoop in disrepair once uncovered and created a need for a frost protected foundation below the utility chase for $2094.43. Strand Associates Inc. is recommending acceptance of the project. Page 184 of 1171 RECOMMENDATION I recommend that the City Council accept the Bunker Hill Foundation Repair Project Acceptance and authorize the payment of the contract amount of $290,647.21 to Tricon General Construction, Inc. based on the facts above. BUDGETIMPACT The summary of project costs for the Bunker Hill Foundation Repair Project is as follows: Construction Contract Award $284,000.00 The project funding summary is as follows: Project No. Fund Description 3043000073-304 Bunker Building Remediation ACTION STEP Final $290,647.21 Fund Amount $290,647.21 The City Council is requested to adopt the attached resolution to accept the Bunker Hill Foundation Repair Project and authorize the payment of the contract amount of $290,647.21 to Tricon General Construction, Inc. cc: Jennifer Larson, Chief Financial Officer Prepared by: Marie L. Ware, Acting Project and Facilities Manager 2 Page 185 of 1171 Prepared by Marie L. Ware, Acting Project and Facilities Manager, 2200 Bunker Hill Rd Dubuque IA 52001 (563) 589-4263 Return to Adrienne N. Breitfelder, City Clerk, 50 W. 1311 St., Dubuque, IA 52001, (563) 589-4100 RESOLUTION NO. 294-25 ACCEPTING THE BUNKER HILL FOUNDATION REPAIR PROJECT AND AUTHORIZING THE PAYMENT OF THE CONTRACT AMOUNT TO THE CONTRACTOR WHEREAS, the Public Improvement Contract forthe Bunker Hill Foundation Repair Project (the Project) has been completed by the contractor, Tricon General Construction Inc. (Contractor) and Strand Associates Inc. has examined the work and filed a certificate stating that the Project has been completed according to the terms of the Public Improvement Contract and that Strand Associates Inc. recommends that the Project be accepted; and WHEREAS, the final contract amount for the Project is $290,647.21; and WHEREAS, the contractor has previously been paid $276,114.85, leaving a balance of $14,532.36; and WHEREAS, the City Council finds that the recommendation of Strand Associates Inc. should be accepted. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA THAT: Section 1. The recommendation of Strand Associates, Inc. is approved, and the Project is hereby accepted. Section 2. The Chief Financial Officer is hereby directed to pay the balance of the retainage of $14,532.36 as provided in Iowa Code chapter 573, and to pay such retainage in accordance with the provisions of Iowa Code chapter 573 or Iowa chapter 26.13. Passed, approved, and adopted this 15th day of September, 2025. Attest: Adrienne N. Breitfelde ; CMC City Clerk 6 : ARI STRAND ASSOCIATES Excellence in Engi wnng5m Strand Associates, Inc 910 West Wingra Drive Madison, WI 53715 (P) 608.251.4843 www.strand.com September 3, 2025 Ms. Marie Ware, Acting Project and Facilities Manager City of Dubuque 2200 Bunker Hill Road Dubuque, IA 52001 Re: Bunker Hill Foundation Repair Project Contract 3043000073-304 City of Dubuque, Iowa Dear Marie, This letter serves as our recommendation of final payment for Contract 3043000073-304. Enclosed is a copy of the final Application for Payment and accompanying documentation in accordance with the Contract Documents, including the List of Items to be Completed or Corrected that was developed based on a final inspection that occurred on June 18, 2025. Based upon our observation of the Work and information provided by OWNER during construction and final inspection, and our review of the final Application for Payment, it appears the Work has been satisfactorily completed. Therefore, we recommend final payment of the amount indicated on the enclosed final Application for Payment. This letter provides our written notice to OWNER and CONTRACTOR (by copy of this letter) that the Work is acceptable, subject to stated provisions of the Contract. The Substantial Completion and Final Completion dates of June 9, 2025, and June 23, 2025, set in the Contract were met. The CONTRACTOR's maintenance bond will be security for a period of 2 years after Substantial Completion. Please call 608-251-4843 if there are any questions. Sincerely, STRAND ASSOCIATES, INC.® Evan J. Constant, P.E. Enclosures c/enc: Jon Routley, Tricon Construction Group Philip Tran, Tricon Construction Group Matt Yentz, Strand Associates, Inc.® Justin Bilskemper, Strand Associates, Inc.® 1154.133\EJC:tll\R\MAD\Documents\Specifications\AmUive\2025\Dubugw, City of(IA)\1154.129.3043000073-304.EJC�16) Specification Leam\(h) Final payment and Notice of Acceptability of Work\FinalPayment.090325.doex Arizona I Illinois I Indiana I Iowa I Kentucky I Ohio I Tennessee I Texas I Wisconsin Page 187 of 1171 APPLICATION AND CERTIFICATE FOR PAYMENT AIA DOCUMENT G702 PAGE ONE OF TWO PAGES TO OWNER: PROJECT: APPLICATION NO: 3 Distribution to: City of Dubuque Bunker Hill Foundation Repair Project APPLICATION DATE: 09/02/25 OWNER Parks & Recreation Dept 2200 Bunker Hill Road PERIOD TO: 08/31/25 CONSTRUCTION 1157 Central Ave Dubuque, IA 52001 PROJECT NO: 22508525 MANAGER Dubuque, IA 52001 3043000073-304 ARCHITECT FROM CONTRACTOR: CONTRACT DATE: 03/20/25 CONTRACTOR Tricon General Construction OTHER 1230 East 12th Street OTHER Dubuque, IA 52001 CONTRACT FOR: Foundation Repair VIA ARCHITECT: Strand & Associates 910 W Wingra Drive, Madison, WI 53715 CONTRACTOR'S APPLICATION FOR PAYMENT The undersigned Contractor certifies that to the best of the Contractor's knowledge, information and belief Application is made for payment, as shown below, in connection with the Contract. the Work covered by this application for Payment has been completed in accordance with the Contract Continuation Sheet, AIA Document G703, is attached. Documents, that all amounts have been paid by the Contractor for Work for which previous Certificates for Payment were issued and payments received from the Owner, and that current payment shown herein is now due. 1. ORIGINAL CONTRACT SUM 2. Net change by Change Orders 3. CONTRACT SUM TO DATE (Line 1 +f- 2) 4. TOTAL COMPLETED & STORED TO DATE (Column G on G703) 5. RETAINAGE: a. 51/. of Completed Work (Column D + E on G703) b. 5% of Stored Material (Column F on G703) TOTAL RETAINAGE (Lines 5a + 5b or Total in Column I of G703) 6. TOTAL EARNED LESS RETAINAGE 7. LESS PREVIOUS CERTIFICATES FOR PAYMENT (Line 6 from prior Certificate) 8. CURRENT PAYMENT DUE 9. BALANCE TO FINISH, INCLUDING RETAINAGE (Line 3 less Line 6) $284,000.00 CONTRACTOR: Triun Construction Group $6,647.21 dd $290,647.21 By: d 1 Dater $290,647.21 State of: Iowa County of: Dubuque Subscribed and sworn to before me this ;z" day of $0.00 Notary Public:�Si11ARY K STONE $0.00 a Commission Number 816418 $0.00 —i �. `:7 My Commission Expires CERTIFICATE F PAYMENT $290.647.21 In accordance with the Contract ocuments, based on on -site observations and the data comprising this application, the Construction Manager and Architect certify to the Owner that to the best of their knowledge, information and belief the Work $276,114.85 has progressed as indicated, the quality of the Work is in accordance with the Contract Documents, and the Contractor is $14,532.36 entitled to payment of the AMOUNT CERTIFIED. $0.00 AMOUNT CERTIFIED $ I� S3Z • 360 (Attach explanation if amount certified differs from amount applied for. Initial all figures on this Application and on the Continuation Sheet that changed to conform to the amount certified. CHANGE ORDER SUMMARY ADDITIONS DEDUCTIONS Total changes approved in previous months $6,647.21 Total approved this Month TOTALS: $6,647.21 $0.00 NET CHANGES by Change Order: 1 $6,647.21 ARCHITECT By ��' �� Date: This Certificate is not negotiable. the AMOUNT CERTIFIED is payable only to the Contractor named herein. Issuance, payment and acceptance of payment are without prejudice to any rights of the Owner or Contractor under this Contract. AIA DOCUMENT G702 APPLICATION AND CERTIFICATE FOR PAYMENT CONSTRUCTION MANAGER ADVISER 1992 EDITION AIA THE AMERICAN INSTITUTE OF ARCHITECTS, 1745 NEW YORK AVE. N.W. WASHINGTON, DC 20006-5292 Users may obtain validation of this document by requesting of the license a completed AIA Document D401- Certification of Document's Authenticity Page 188 of 1171 CONTINUATION SHEET AIA DOCUMENT G703 PAGE TWO OF TWO PAGES AIA DOCUMENT G702, APPLICATION AND CERTIFICATION FOR PAYMENT, containing APPLICATION NO: 3 Contractor's signed certification is attached. APPLICATION DATE: 9/2/2025 In tabulations below, amounts are stated to the nearest dollar. PERIOD TO: 8/31/2025 Use Column 1 on Contracts where variable retainage for line items may apply. ARCHITECT'S PROJECT NO: 22508525 A B C D I E F G H 1 ITEM NO. DESCRIPTION OF WORK SCHEDULED VALUE WORK COMPLETED MATERIALS PRESENTLY STORED (Not in D or E) TOTAL COMPLETED AND STORED TO DATE (D+E+F) % (G / C) BALANCE TO FINISH (C - G) RETAINAGE (IF VARIABLE RATE) FROM PREVIOUS APPLICATION (D + E) THIS PERIOD 01 General Conditions $39,872.00 $39,872.00 $39,872.00 100.0% $0.00 $0.00 02 Bond $3,950.00 $3,950.00 $3,950.00 0 100.0% $0.00 $0.00 03 Demolition $26,875.00 $26,875.00 $26,875.00 100.0% $0.00 $0.00 04 Concrete Washout $800.00 $800.00 $800.00 100.0% $0.00 $0.00 05 Excavation $41,876.00 $41,876.00 $41,876.00 0 100.% 0 $0.00 $0.00 06 Utilities $14,895.00 $14,895.00 $14,895.00 100.0% $0.00 $0.00 07 Seed/Sod $1,478.00 $1,478.00 $1,478.00 100.0% $0.00 $0.00 08 Asphalt $4,680.00 $4,680.00 $4,680.00 100.0% $0.00 $0.00 09 Concrete $63,244.00 $63,244.00 $63,244.00 100.0% $0.00 $0.00 10 Masonry $4,900.00 $4,900.00 $4,900.00 ° 100.0% $0.00 $0.00 11 Steel $2,700.00 $2,700.00 $2,700.00 100.0% $0.00 $0.00 12 Shoring $3,600.00 $3,600.00 $3,600.00 0 100.0 /o $0.00 $0.00 13 Carpentry $28,974.00 $28,974.00 $28,974.00 100.0% $0.00 $0.00 14 Waterproofing $4,108.00 $4,108.00 $4,108.00 0 100./o 0 $0.00 $0.00 15 EPDM $4,900.00 $4,900.00 $4,900.00 100.0% $0.00 $0.00 16 Windows $1,704.00 $1,704.00 $1,704.00 0 100.0% $0.00 $0.00 17 Doors/Hardware $6,800.00 $6.800.00 $6,800.00 100.0% $0.00 $0.00 18 Door Labor $1,142.00 $1,142.00 $1,142.00 100.0% $0.00 $0.00 19 Painting $3,900.00 $3,900.00 $3,900.00 0 100.%0 $0.00 $0.00 20 Electrical $6,752.00 $6,752.00 $6,752.00 100.0% $0.00 $0.00 21 22 Contractor Fee $16,850.00 $16,850.00 $16,850.00 100.0% $0.00 $0.00 23 24 CO #1 Limestone Wall Repair $2,409.12 $2,409.12 $2,409.12 100.0% $0.00 $0.00 25 CO #2 Unsuitable Soils $1,001.34 $1,001.34 $1,001.34 100.0% $0.00 $0.00 26 CO #3 Pipe Chase Foundation $2,094.43 $2,094.43 $2,094.43 0 100.%0 $0.00 $0.00 27 CO #4 Additional Wall Repair $1,142.32 $1,142.32 $1,142.32 100.0% $0.00 $0.00 28 29 30 31 32 Grand Total $290,647.21 $290,647.21 $0.00 $0.00 $290,647.21 100.0% $0.00 $0.00 Users may obtain validation of this document by requesting of the license a completed AIA Document D401 - Certification of Document's Authenticity Page 189 of 1171